Erecting a building with vertical concrete panels measuring 2 by 7 metres, on top of a basement and beneath a high-voltage cable: quite a technical challenge. Specialist Valcke Prefab Beton rose to it, delivering a highly successful result.

Valcke Prefab Beton

Installing an imposing precast structure on top of a basement and beneath a high-voltage cable was a considerable technical challenge.

Valcke Prefab Beton specialises in agricultural and industrial construction. Using its high-quality precast concrete panels, the company quickly erects fire-safe, durable buildings. One example is its project for MD Invest in Anzegem, a relatively small development with plenty of challenging aspects.

Smooth light-grey concrete and dark silex

MD Invest’s building consists of three sections: a workshop, a showroom, and an area with an office and an apartment. Each has its own identity. “Like the workshop, the showroom is built from large light-grey concrete panels. False joints divide the showroom panels into smaller sections, creating a visual grid of small panels. The office and apartment section, by contrast, is finished in dark exposed-aggregate concrete,” explains project manager Bert Loyson. The contrast between the silex and the light-grey concrete creates an engaging aesthetic dialogue.

Tight working space

Valcke had to work within strict constraints on this project. The concrete panels had to be erected between the basement, installed by another contractor, and a high-voltage cable. “Some of the panels, delivered horizontally and measuring 3 by 6 metres, even had to be installed vertically. That’s quite a technical challenge,” says the project manager. “Especially when there’s so little clearance.”

Excellent engineering

It goes without saying that the engineers also had their work cut out calculating everything involved. What’s more, the showroom’s upper floor is suspended from a roof beam, avoiding the need for columns. Fortunately, the in-house engineering department prepared everything down to the last detail, ensuring that installation on site went smoothly.    

Question about this story? Ask your question

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • SubjectGeneral
Share this article

Advertisement

Follow Bouwen aan Vlaanderen

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.