Two buildings, one welcoming home for a care home
Text and images Els Goethals

Following three successive new-build and renovation phases, Ter Linde care home has become an outstanding example of ‘care for the future’. The renewed campus combines contemporary care comforts with human wellbeing. The result is a welcoming care environment where meeting, social interaction and a sense of belonging take centre stage.
To meet growing demand for care and current needs, a major modernisation of Ter Linde care home in Hooglede-Gits was required. Renovation or new build? The designers at VK architects+engineers (now Sweco) managed to combine the best of both worlds. A new wing was built alongside the original complex, while the existing buildings underwent a complete transformation.

From milestone to milestone
The client appointed building contractor Artes Depret for the main contract. As a class 8 contractor, the company enjoys a strong reputation. “A care home must remain operational around the clock and guarantee uninterrupted service. It was a demanding assignment, but a considered approach to complex projects is precisely one of Artes Depret’s strengths. The solution lay in a phased approach, starting with the construction of the new wing, built over two storeys,” explains Karel Vanhoorde, project engineer at Artes Depret. “When the 28 new rooms were completed at the end of 2023, some residents were able to move internally into the finished spaces. This meant nobody had to leave the campus and there were always enough rooms available.”


A head start thanks to BIM
The success of this and other Artes Depret projects is due in part to its efficient BIM approach. “This enables us to anticipate potential issues quickly and accurately, and avoid disruption on site.
It also allows us to prepare the work in detail. A good example is the load-bearing calcium silicate masonry walls, which were produced largely off site thanks to BIM,” says Karel Vanhoorde.

A complete redesign
“Once the new-build was complete, work began on renovating the existing building. ‘Major’ is certainly the right word for this renovation. Not only were the external joinery and roof completely renewed, the building was also upgraded for energy efficiency. The layout was entirely redesigned: every three rooms were converted into two larger rooms. Integrating future-proof HVAC systems was also essential to meet contemporary standards, but this was not straightforward given the existing building structure. It took careful planning to fit in the pipes and air ducts,” says Karel Vanhoorde. “After the building had been stripped back, one room was fitted out as a mock-up, including an integrated hoist. This allowed us to translate the client’s expectations into technically viable solutions. Every detail was meticulously coordinated!”


A crucial final piece
“The third and final phase crowned the work: the social heart of Ter Linde care home. The cafeteria underwent a major facelift and was substantially extended. At the same time, the adjoining reception area was redesigned. The result is a welcoming meeting space that fosters social cohesion. It connects to a central corridor that runs through the building like a connecting backbone,” explains Karel Vanhoorde. “The entrance and façade also make a real statement from the outside. The façade features full-height glazing set in slender, gold-coloured profiles. A projecting gold-coloured canopy with a row of columns creates a sense of depth while also providing natural shade.” The campus was officially inaugurated in February 2026. With that, Artes Depret brought an impressive feat to a successful conclusion.

LEVIAT: CONNECTION SOLUTIONS
Leviat is a global leader in connection and anchoring technology. Customers can count on professional support from the design phase through to engineering and delivery. The construction project for Ter Linde care home in Gits is a prime example. “Leviat supplied, among other things, spacers, a watertight expansion joint strip, angle profiles and Plaka Korbo façade brackets. As a one-stop supplier, we bring together solutions for both concrete and façade connections in a single project. In-house production allows us to guarantee bespoke solutions and consistently high quality,” says Cédric Surdiacourt, Technical Sales Consultant at Leviat. “Mechanical processes, such as the automated laser cutting, bending and welding of steel, take place in our own factory in Belgium. The steel is then galvanised and finished with a high-quality powder coating. Leviat manufactures and supplies Halfen, Scaldex and Plaka products.” But personal contact comes before technology. Cédric Surdiacourt has maintained a strong, long-standing relationship with Artes Depret.
TECHNICAL SPECIFICATIONS
Client Municipality of Hooglede (OCMW)
Architect Sweco (Brussels)
Main contractor(s) Artes Depret (Zeebrugge)
Een zakelijke vraag aan Sweco Belgium? Get in touch
Who worked on it
Ter Linde in Hooglede
- architect
Sweco - clientGemeente Hooglede (OCMW)
- main contractorArtes Depret
Keep following this
Get an email when a new story is published. No account needed.
- ProjectTer Linde
- SubjectHealthcare projects
- CompanySweco Belgium
- CompanyGemeente Hooglede (OCMW)
- CompanyArtes Depret
- CompanyVK architects+engineers