Brussels

VUB champions martial arts for all

Text Els JonckheereImage Pellikaan / Charles-Luka Schweizer

In dit nieuwe gebouw zullen twee vechtsportzalen worden ingericht. (Beeld: Pellikaan)
In dit nieuwe gebouw zullen twee vechtsportzalen worden ingericht. (Beeld: Pellikaan)

Over the past decade, the VUB campus in Etterbeek has undergone a complete transformation. The site is gradually filling up, yet the university still found room for a Martial Arts Expertise Centre (VEC). Specifically, Building L was renovated and extended to create a place where Brussels martial arts clubs and the Vlaamse Boks Liga can train in comfort, with guidance from VUB experts.

With the VEC, VUB aims to respond to the growing diversity of sporting activities. The university sees martial arts as a means of empowering young people in Brussels, and studies had shown that the capital lacked high-quality martial arts facilities. The rectorate therefore decided to invest in a centre open to everyone. The project builds on the work of ‘Sport & Society’, which has been researching the social benefits of sport for many years. This group, together with other VUB researchers, will provide guidance and training programmes for all organisations operating at the VEC. A budget of €4 million was allocated to bring the project to fruition, of which the Flemish Government contributed €725,000 and the Vlaams Brussels Fonds €700,000. 

The Vlaamse Gemeenschapscommissie contributed €100,000 for sports equipment, while the Vlaamse Boks Liga, which will hold national training sessions there, provided €250,000.

The two halls can be separated by an acoustic partition. (Image: Charles-Luka Schweizer)
The upper section features an aluminium glazed façade, which allows ample natural light to flood in. (Image: Charles-Luka Schweizer)

An extension to the ‘sports complex’

Building L, on General Jacqueslaan, was the most logical choice of location. It is the campus’s ‘sports complex’, housing the swimming pool, a Basic Fit branch and two sports halls. “It also adjoins one of the few undeveloped areas on the site,” says Alexander Hendrickx, project manager for main contractor Pellikaan. “The VEC was built between the ‘legs’ of this U-shaped building. To create a building fit for the future, we opted for a heat pump that heats the entrance halls and corridor via underfloor heating, while the sports hall is heated with warm air.”

Two halls, one whole

The VEC has a rectangular footprint, covers approximately 1,100 m² and contains two martial arts halls, separated by a movable acoustic partition. Each hall has its own storage room and entrance hall. “One side has been fitted with a fixed and a mobile boxing ring, as well as punchbags,” says Alexander Hendrickx. “The other side is a dojo with mats for martial arts such as judo, karate and taekwondo. As the VEC is an extension, it can use the showers, changing rooms, reception desk and car parks in Building L. The plant room is located above the entrance hall and storage room on one side, while a stand with a glass balustrade is situated on the other.”

The building was constructed between the ‘legs’ of the U-shaped sports complex. (Image: Pellikaan)

A new architectural balance

The building has a steel frame with hollow-core slabs for the upper floor. “The façades comprise internal liner trays, with the lower exterior section clad in light grey sandwich panels,” continues Alexander Hendrickx. “The upper section features an aluminium glazed façade, which allows ample natural light to flood in. The concept may sound restrained and simple, but it is nonetheless an impressive feat of architecture. The architect created a new balance between the brutalist character of the original building and a fresh, modern sports centre with an inviting feel. There are also various architectural details. For example, the joints between the sandwich panels align with the glazing profiles. This ‘simplicity with an eye for detail’ is reflected inside too. The architect opted for a limited palette of materials: the steel decking and liner trays are galvanised, as are the ducts running through the steel roof beams. 

A floating, point-elastic PU sports floor was also installed, while the remaining floors are polished concrete. Finally, the large internal windows between the entrance hall and sports hall, along with all the internal doors, are made of wood.” 

Architectural concept optimised

The project was delivered on an E&B, or Engineer & Build, basis. “This meant Pellikaan worked from the original design,” explains Alexander Hendrickx. “During the tendering process, the main challenge was to make the architectural concept fit within the client’s budget. Drawing on our many years of experience in designing and building sports facilities on a Design and Build basis, we were able to make optimisations and arrive at a technically sound, cost-effective concept. We worked with our partner Studie10 to optimise the steel frame. We also proposed replacing the original timber-frame wall build-up with liner trays and sandwich panels. Nevertheless, we remained true to the architectural vision, with rhythm and alignment in the façade and structure at its heart.” 

Logistics called for ingenuity

From a construction point of view, this project was right up Pellikaan’s street. Organisationally, however, the well-established contractor had to pull out all the stops. Alexander Hendrickx explains: “There was very little free space on the site, so we had to set up our site cabins on the other side of the building. The only site access, however, was via a fire access road leading onto Generaal Jacqueslaan, which caused problems, particularly during the morning rush hour. Every lorry had to turn around on this road to reach the site. The lack of space also left us almost literally boxed in by our own construction work. For example, we had to leave the façade open for as long as possible, as otherwise we would no longer have been able to access the courtyard with our boom lifts and telehandlers.” 

The project also included a corridor giving external users direct access and ensuring easy circulation to the other halls. (Image: Charles-Luka Schweizer)

A demonstration of expertise

The VEC was completed on 5 May, but the building will not open until this summer. “It will first host children’s sports camps, after which the university and the Vlaamse Boks Liga will also use the martial arts halls,” says Alexander Hendrickx. “All the parties are delighted with the result, and Pellikaan may be the most pleased of all. This project once again demonstrates that we are a collaborative partner, keen to work with the client and construction partners to arrive at the best design that fits the client’s budget. We have once again proved that we are ready to take on any challenge and always work towards a result that everyone involved can support.”     

Gevitec: experts in complete electrical projects

For electrical and related systems, having a single, and above all reliable, point of contact is crucial. Pellikaan therefore entrusted Gevitec, based in Schoten, with all this work on the VEC. “This assignment was different from the usual,” says assistant director Andy Borghs. “The university had already selected the suppliers and subcontractors, so we could not work with our regular partners. The challenges were therefore not so much technical as organisational: coordinating all these parties so they delivered the work to our quality standards and within the deadline.” Gevitec was responsible for the complete electrical installation, including low-voltage systems. The sports hall was also equipped with lighting by Veko, emergency lighting by Fosfari Lighting and security systems by Nobel Security, including fire detection and intruder alarm systems. The scope also included the data infrastructure and integrating the lighting into the existing site control system. “We approach every project with great enthusiasm, whether large or small,” continues Andy Borghs. “We consider every assignment important and always pull out all the stops to implement the highest-quality, most reliable solutions. This project is a particularly notable reference, though, as a martial arts hall is not built on a university campus every day.”

TECHNICAL DETAILS

Client Vrije Universiteit Brussel (Brussels)
Architect Modulo Architects (Brussels) and Kaderstudio (Brussels)
Main contractor(s) Pellikaan (Zaventem)

Een zakelijke vraag aan Pellikaan Bouwbedrijf nv? Get in touch

Who worked on it

Vechtsport Expertise Centrum in Etterbeek, renovatie

  1. main contractorPellikaan
  2. ClientVrije Universiteit Brussel
  3. ArchitectModulo Architects
  4. ArchitectKaderstudio
  5. volledige elektrische installatieGevitec
  6. lightingVeko
  7. Emergency lightingFosfari Lighting
  8. security systemsNobel Security

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectVechtsport Expertise Centrum
  • SubjectBrussels
  • CompanyPellikaan Bouwbedrijf nv
  • CompanyVrije Universiteit Brussel
  • CompanyModulo Architects
  • CompanyKaderstudio
  • CompanyGevitec
Share this article

Follow Bouwen aan Vlaanderen

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.