Urban brownfield site transformed into a sustainable residential development with a spacious courtyard garden
Text Tim JanssensImage Bart Gosselin Photography

The final touches were recently completed on an ambitious, distinctive infill project on a former industrial site in Schaarbeek, directly opposite the renowned Train World museum. Three new-build blocks accommodate a mix of apartments, duplexes, houses and a commercial unit, complemented by a 2500 m² communal courtyard garden and a semi-basement car park. Carefully integrated into the urban fabric and with a strong focus on water management and energy efficiency, Mench is an exemplary brownfield development that has also given the surrounding area a new lease of life.
Revive’s mission is to transform neglected and contaminated urban sites into sustainable, lively neighbourhoods. The Mench project is a perfect fit. A fully paved site with offices and an industrial shed has made way for a residential development comprising 41 different homes in total, spread across three new-build blocks. The largest block (Building A) is located along Georges Rodenbachlaan and contains 23 apartments, two duplex homes and a shell-finished 94 m² commercial unit. Building B is a lower block set at right angles within the site, accommodating five adjoining duplex homes. Building C completes the existing street frontage along the rear-facing August Sniedersstraat and contains a further eleven apartments.
All the homes have private terraces and face the spacious courtyard garden. This communal outdoor space forms a green oasis in the busy inner-city setting. Several retention roofs have also been installed, covering a total of 1260 m². They help to store rainwater and thus relieve pressure on the urban drainage network. The 18-space semi-basement car park is also seamlessly integrated into the landscape design. Mench also performs excellently in terms of energy. Individual mechanical ventilation systems with heat recovery and air-to-water heat pumps ensure an optimal indoor climate, while rooftop solar panels generate renewable electricity. Combined with underfloor heating, these features result in an energy-efficient building envelope and homes with an EPC rating of A.


Challenging inner-city setting
Pellikaan Bouwbedrijf was appointed to deliver the Mench project. “From demolition to turnkey handover and planting the greenery, this project had everything for us, apart from access control,” says technical director Rudy De Cock. “The main challenge was the inner-city nature of the site, which meant that during demolition and construction we had to shore up and stabilise several neighbouring buildings using temporary structures, working with specialist firms and in close consultation with structural engineering firm JZH & Partners. There is also a considerable difference in level between the front, alongside the sloping Georges Rodenbachlaan, and the rear of the site. In other words, what is a basement at the front is at garden level at the rear. Building A is therefore partly below ground, which also meant we had to stabilise the pavement temporarily using a Berlin wall.”
Another distinctive feature is the semi-basement car park. “Viewed from the street, it is indeed one level down and could therefore be described as ‘underground’, but in reality it is at the same level as the houses in Building B. The car park is covered by a green retention roof, beneath which is a conventional structure of prestressed beams and hollow-core slabs.”


A welcome change of pace
The three residential blocks also have concrete structures, with a maximum use of precast columns and walls in the basement and wide prestressed floor slabs. There are also load-bearing calcium silicate masonry walls, while the non-load-bearing partitions were built using storey-height, prefabricated aerated concrete panels, each 60 cm wide. The yellow facing bricks are interspersed with dark brown ones, creating a playful pattern in certain areas.

Aluminium external joinery and projecting concrete terraces complete the picture. The pitched roof of Building C is also clad with yellow clay roof tiles.
Pellikaan handed over the residential blocks at the end of March, and the courtyard garden was completed in mid-April. “This was a somewhat atypical project for us. We mainly focus on sports facilities delivered through Design & Build projects, so this was a welcome change of pace,” says Rudy De Cock. “It was not without its difficulties, particularly as, after a while, the inner part of the site could only be accessed via the fire-service entrance beneath Building A, which therefore served as the site’s entrance and exit for a long time. The busy location, directly opposite the railway museum in Schaarbeek, also created additional challenges in terms of organisation, logistics and parking. The end result is certainly something to be proud of. Transforming a brownfield site into a sustainable residential development that also significantly enhances the surrounding neighbourhood is an achievement worth celebrating. Mench is certainly a worthy addition to our impressive list of references!”
TECHNICAL DETAILS
Client, Revive (Gent)
Architect, a practice (Brussel), in collaboration with Bureau Bouwtechniek (Antwerpen)
Main contractor(s), Pellikaan Bouwbedrijf (Zaventem)
Precast concrete supplier, Megaton/Structo Prefab Systems (Ninove)
Een zakelijke vraag aan Pellikaan Bouwbedrijf nv? Get in touch
Who worked on it
Mench in Schaarbeek, nieuwbouw
- main contractor
Pellikaan Bouwbedrijf - ClientRevive
- Architecta practice
- ArchitectBureau Bouwtechniek
- Leverancier prefabbetonelementenMegaton/Structo Prefab Systems
- stabiliteitsbureauJZH & Partners
Keep following this
Get an email when a new story is published. No account needed.
- ProjectMench
- SubjectBrussels
- CompanyPellikaan Bouwbedrijf nv
- CompanyRevive
- Companya practice
- CompanyBureau Bouwtechniek
- CompanyMegaton/Structo Prefab Systems