Technical interior joinery combines acoustics, fire resistance and ease of use
Text Tim JanssensImage Consortium VRT Morgen

Part of the VRT-Huis: Brussel project: Where people and media come together →
It goes without saying that a versatile media building such as VRT-huis brings with it a whole range of technical requirements that are far less relevant in a conventional office building. Just ask Eribel, which took on the entire package of technical interior joinery using its SolidTeq/ClassicTeq and SteelTeq ranges. All the door and window assemblies, both glazed and unglazed, were made entirely to measure to suit their function and position in the building, and had to meet specific requirements for acoustics, fire resistance and aesthetic finish.
"Virtually every window and door assembly in VRT-huis had its own technical specifications," says Gert Daniels, commercial director at Eribel. "The biggest challenge was acoustics. In the news studio, of course, you must not be able to hear the activity in the adjoining offices. Many of the window assemblies therefore had to meet particularly stringent acoustic requirements, which we had to combine with fire resistance and a refined aesthetic finish."
This combination of requirements and considerations resulted in several technically challenging installations. Among other things, Eribel installed a window assembly around 9 metres high with a sound reduction rating of 45 dB and a fire resistance of 60 minutes. Elsewhere in the building, a non-fire-resistant window assembly was combined with three double doors, each with a fire resistance of 30 minutes, making for a total height of 6.5 metres. “These solutions required close collaboration with the structural and acoustic engineers involved, to coordinate and fine-tune every technical aspect,” says Daniels.
Finding the ideal balance
Alongside all the fixed window assemblies, Eribel also manufactured a variety of door types, from hinged and double-action doors to escape doors with panic hardware. Depending on the application and the details specified in the tender documents, they were fitted with metal or timber frames and given specific finishes, such as metal casings to match continuous wall cladding.
“A great deal of preparation went into this project, including the necessary BENOR ATG processes and our own fire tests, before everything was, of course, officially tested as well,” says Gert Daniels. “All in all, this project took us three years. But however complex and extensive it was, I wouldn’t call it exceptional, as we specialise in bespoke technical interior joinery on a daily basis. Every project has its own characteristics and requirements. The common thread is that we always take a proactive approach, working with the client to find the most suitable solution. We consider not only the required technical performance and intended aesthetic, but also ease of use. No one can open a door with glass weighing 50 kilograms per square metre, so it isn’t practical. It’s always a question of finding the ideal balance. That’s what makes bespoke technical interior joinery so fascinating.”
Question about this story? Ask your question
Wie aan VRT-huis werkte
- façade contractorVorsselmansMentioned in Ingenious bespoke façade solutions for a leading media complex
- climate ceilingsInteraluMentioned in High-end climate ceilings tailored to a flexible media building
Keep following this
Get an email when a new story is published. No account needed.
- ProjectVRT-huis
- SubjectBrussels