An architectural landmark with international appeal
Text Tim JanssensImage Dieter Meyns

The area around Brussels Airport is increasingly evolving from a traditional office district into an international urban neighbourhood where work, socialising and living come together. The Cube fits seamlessly into this development. With its striking architecture, ambitious sustainability goals and strong focus on wellbeing, this almost 20,000 m² complex aims not only to offer high-quality office space, but above all to become a new landmark for the region, following in the footsteps of earlier prestigious projects such as the PwC Campus and The Wings.
The Cube is located on the corner of a large industrial estate, beside a busy roundabout that serves as a gateway and close to the Brussels Ring and Zaventem Airport. This strategic location presented a major design challenge from the outset. The building had to set the standard not only for energy efficiency, people-centred amenities, water management and connectivity, but also to have an architectural identity that would enhance the international character of the surrounding area.
The eye-catching design is by assar architects, now part of Sweco Architects, which also designed The Wings nearby. “We already knew the client very well, as Ligora is a subsidiary of Ghelamco, so we were able to build on the experience we had already gained,” says Guy Van der Kuylen, architect and studio manager at Sweco Architects. “Unlike The Wings, The Cube was conceived entirely as an office building with no other primary functions, with the office floors intended for multiple tenants.
In addition, the ground floor houses a range of shared facilities, including reception, meeting rooms, a multi-purpose room, a healthy-food outlet and more. Alongside 550 underground parking spaces, the four basement levels also accommodate additional amenities such as a fitness room, lockers and showers.”

A landmark building
The architects were given the creative freedom they needed to turn The Cube into a real gem. “To make the most of the space available on the site, we opted for a cube-shaped building,” explains Guy Van der Kuylen. “By creating a central courtyard and combining it with extensive glazing, we ensured that the offices receive plenty of natural light. Vertical fins create a distinctive rhythm across the façade. A stepped volume on the fourth floor makes room for an accessible green roof. We have turned this into a striking architectural feature with sloping façade lines that extend across several floors. Green outdoor spaces have also been provided on the first and second floors, offering a total of 800 m² of terraces. The vertical façade profiles on the two façades at the entrance are fitted with integrated LED strips. So The Cube is not just a simple ‘box’, and visually has much more to offer than glass, concrete and metal alone.”
As in The Wings, health, comfort and wellbeing are also key priorities at The Cube. BREEAM Outstanding, WELL Gold, DGNB Gold, Edge Zero Advanced, SmartScore Gold, WiredScore Gold … there is no shortage of sustainability and other certifications. “We have worked hard to design a building that forms its own ecosystem. We already had the necessary experience in this area, so once again we were able to put it to the best possible use. We are still finalising some of these processes, but so far it looks as though we will achieve all the targets we set. Cooperation with the client and the contractors involved was excellent, so we can look back on a highly successful project!”

Efficient delivery through a well-considered approach
BAM Interbuild and its sister company Kairos (developer) are no strangers to Diegem, having undertaken a large-scale project on Berkenlaan, which is currently in preparation. “Our work on The Cube began with the foundation slab and then covered the entire concrete structure of the four basement levels, the ground floor and the nine upper floors,” say project manager Sven Matthyssens and commercial director Jack Berben. “Below ground, the main challenges were the curved external walls of the ramps between the different parking levels and the use of climbing formwork. Above ground, we cast the post-tensioned floor slabs in three phases. In essence, the process was the same each time: cast the external walls, columns and beams, pour the floor slab, then move on to the next floor. We soon settled into an efficient routine in which the four stages of the process, formwork, fixing the reinforcement, post-tensioning and concreting, followed one another seamlessly.”
For BAM Interbuild, delivering The Cube meant completing the work quickly and with careful planning. “Everything went smoothly from start to finish. This was certainly helped by the highly professional cooperation with the client, for whom we also built the PwC Campus a kilometre away. By sitting down with the various parties involved beforehand and drawing on our extensive experience and expertise to identify the right construction method and a high-quality way of working, without wasting time or getting in one another’s way, we have delivered an excellent result that has satisfied everyone.”


Een zakelijke vraag aan Sweco Belgium? Get in touch
Who worked on it
The Cube
- architect
Sweco - clientLigora
- betonnen structuurBAM Interbuild
- developerKairos
Keep following this
Get an email when a new story is published. No account needed.
- ProjectThe Cube
- SubjectFlemish Brabant
- CompanySweco Belgium
- CompanyLigora
- CompanyBAM Interbuild
- CompanyKairos


















