In a densely populated region such as the Brussels outskirts, where space is scarce, the redevelopment of a brownfield is always welcome. De Lediaan is an innovative residential development in Diegem that brings together homes, green space and social cohesion.
In 2020, the municipality of Diegem took the first step towards redeveloping the former Desmedt site, transforming it from a former landfill into a residential area through a brownfield covenant. This was followed by extensive remediation works by Jan De Nul Group, which joined forces with co-developer Urbicoon. After years of regeneration, the former sand quarry has been given a new lease of life as the innovative De Lediaan residential development.

Green space takes centre stage
WITH20 architecten from Vilvoorde was involved in De Lediaan from the earliest design stages. Leen Pieyns, director at WITH20 architecten, explains: “As an architectural practice, we aim to create residential environments that offer sustainable quality of life while also adding value to the neighbourhood. At De Lediaan, we have translated that ambition into a development that strengthens the urban fabric, with its spatial relationship to the surroundings at its heart. Both in scale and in dimensions, De Lediaan is integrated with the 1.8-hectare park of the same name. The site comprises three larger residential blocks with apartments and one cluster of ground-floor family homes. This creates a mix of 168 homes in total, ranging from studios and compact city apartments to penthouses.”
“In addition, no less than 82% of the site remains green space. Communal gardens, cycle paths and footpaths ensure excellent permeability. This unique architectural commission offered ample opportunities for innovation, while also presenting our design team with complex challenges, such as bridging the considerable 13-metre level difference.”


Lean construction means process-focused thinking
The project was a major architectural achievement, and also placed high demands on the construction side. Nevertheless, Building & Partners from Beringen succeeded in delivering the building fully wind- and watertight.
“Given the considerable changes in level across the site, this was far from a straightforward project. Almost no two thresholds or stairwells were at the same level. This called for meticulous planning and execution, with lean methods underpinning continuous process optimisation. This enabled us to work on several blocks at once. One team never had to wait for another to finish,” says Chris Geybels, Technical Director at Building & Partners. “The level changes also made the construction of the underground car park quite challenging, as it transitions from one level to two.”

From logistics to acoustics
With easy access to both the Brussels Ring and the E40, as well as Brussels Airport, De Lediaan is ideally located. “However, the airport’s proximity had a huge logistical impact on the construction works,” says Chris Geybels. “At one point, five tower cranes were operating on site at the same time. Coordinating the crane positions with the height restrictions was quite a puzzle!”
Leen Pieyns adds: “This also required careful consideration during the design phase, particularly in terms of acoustic comfort. A range of measures reduces the impact of aircraft noise on the living environment, from acoustic insulation materials and sound-insulating glazing to carefully considered orientation in relation to flight paths.”


A new urban neighbourhood on a village scale
Although the Brussels Ring might bring high-rise urban development to mind, De Lediaan has deliberately been designed on a village scale. Lower densities, harmonious façade rhythms, a coherent design language and consistent material choices are among the architectural features that create a sense of visual calm.

Building & Partners and WITH20 architecten are both proud of the end result. “As a class 7 contractor, with family values at the heart of our company culture, we felt at home with this project from the outset. It gave us another opportunity to demonstrate that craftsmanship and innovative construction methods go hand in hand,” concludes Chris Geybels.
LITO: Modular HVAC installations
By supplying Litobox® L7 Rooftops, LITO once again demonstrates how its innovative prefabricated solution combines maximum living comfort with minimal energy consumption. A single Litobox® provides heating, cooling and domestic hot water for no fewer than eight apartments. “Sustainable energy plays a key role at De Lediaan in Diegem. At the heart of every Litobox® is a quiet, low-maintenance monobloc heat pump. The PV inverters are also already installed and connected. The roof unit even incorporates an active solar thermal system. All the services are pre-assembled and tested, so installation and connection can be completed in a single day,” says CEO Lieven Smeyers. “As well as saving time, it makes the most of the available space: all the components are housed in the Litobox® on the roof, leaving the storage room in the apartment uncluttered and cool.” Another point worth highlighting is that LITO’s data platform allows users to view their consumption data online and building managers to monitor energy performance. A central Siemens controller balances the power output electronically for each apartment. “It is an honour to contribute to this sustainable residential development with our technology. We sincerely thank project developers PSR (Jan De Nul Group) and Urbicoon, as well as engineering consultancy AE+, for their confidence in us, and congratulate Future Clima on the professional installation,” concludes Smeyers.
TECHNICAL SPECIFICATIONS
Client Jan de Nul Group (Aalst) and Urbicoon (Sint-Pieters-Woluwe)
Architect WITH20 architecten (Vilvoorde)
Main contractor(s) Building & Partners (Beringen)
Question about this story? Ask your question
Who worked on it
De Lediaan in Machelen
- clientJan De Nul Group
- clientUrbicoon
- property developersPSR
- architectWITH20 architecten
- Main contractorBuilding & Partners
- Litobox® L7 RooftopsLITO
- installationFuture Clima
- engineering consultancyAE+
Keep following this
Get an email when a new story is published. No account needed.
- ProjectDe Lediaan
- SubjectFlemish Brabant
- CompanyJan De Nul Group
- CompanyUrbicoon
- CompanyPSR
- CompanyWITH20 architecten
- CompanyBuilding & Partners