As a specialist partner on the contractor side, façade contractor Vorsselmans was part of the consortium delivering the new VRT-Huis from the tender stage onwards. With an area of around 11,800 m², the company from the Kempen region completed one of its largest curtain wall façades to date. “Despite all the specific challenges, the project went exceptionally smoothly,” says project manager Tom Verlent, looking back with satisfaction.
The foundations for the VRT-Huis’s extensively glazed façades were laid some six years ago. Together with the architects and the other consortium partners, Vorsselmans set out to find the most (cost-)efficient solution in line with the aesthetic preferences and technical requirements. “The square upper-storey volume (Veld) presented particular challenges in this respect,” says Tom Verlent. “The building’s transparency and the large cantilevers, which cause significant deflection in the supporting steel structure and floor slabs, ultimately led us to opt for extruded aluminium profiles based on Schüco’s FWS 80 system. This allows the glazing to move sufficiently and prevents glass breakage.”

Smart engineering, efficient installation
Deflection in the supporting steel structure and floor slabs also affected how the curtain walls were fixed. “As well as the building’s own weight, there are the imposed loads, and VRT wants to be able to operate as flexibly as possible, potentially setting up a mobile studio in the very corner of the building. To prevent the aluminium profiles from having to accommodate excessive movement, we suspended the curtain walls from the upper part of the building structure, where imposed loads are minimal in principle. This made a significant difference during both the engineering and installation phases, as did our decision to use 15-metre mullions made from single lengths and hoist them into position as one piece. We had never done that before, but it proved a great success,” explains Tom Verlent. “The solid façade sections are clad with a solid sandwich panel, with a perforated aluminium zigzag sheet in front. This is used both on the outside of the building and around the five internal courtyards, where the panes have ground edges to prevent thermal breakage.”
In addition to the three upper-storey levels, the octagonal base volume also features generous areas of glazing. “The architect came up with the idea of placing the glass between two steel box sections. However, this was not feasible, as it would have made later dismantling impossible. Instead, a curtain wall is fixed to the 20 x 30 cm box sections on the inside, with removable aluminium decorative box sections added on the outside. Depending on their position, these come in four different colours: yellow, green, red or blue,” says Verlent. “Despite all the specific challenges, this project went exceptionally smoothly. As we had ‘prefabricated’ a great many elements, we were able to get straight to work on site and remain very flexible. Given the overall complexity and tight schedule, that paid off handsomely.”
Question about this story? Ask your question
Wie aan VRT-huis werkte
- façade contractorVorsselmansIn this story
- climate ceilingsInteraluMentioned in High-end climate ceilings tailored to a flexible media building
Keep following this
Get an email when a new story is published. No account needed.
- ProjectVRT-huis
- SubjectBrussels
- CompanyVorsselmans