Healthcare projects

Open architecture reflects a new vision for residential care

Text Els GoethalsImage ibens / Costercaptures

De open volumetrie focust maximaal op groenbeleving en staat in directe relatie met het dorpscentrum.
De open volumetrie focust maximaal op groenbeleving en staat in directe relatie met het dorpscentrum.

There was no doubt that the care home in Wakken was in need of renovation. Keeping the project within budget, however, proved no easy task, until the decision was made to use precast concrete construction in combination with BIM and lean methods. The brand-new campus now offers older people contemporary residential care.

Brown-grey facing brick was chosen for the upper floors.

For years, O.L.V. Lourdes was a familiar name, but ‘Woonzorgcentrum SAMEN Wakken’ is becoming increasingly established. The brand-new care home campus stands as a symbol of contemporary residential care and strong collaboration. Although the project got off to a rocky start, the client was largely spared the burden of managing it. SAMEN vzw, which brings WZC Sint-Andries in Tielt and WZC O.L.V. Lourdes in Wakken together under one banner, received full support from Woonzorggroep GVO. “Across West Flanders, there are ten care homes belonging to GVO, including ‘SAMEN Wakken’. As an umbrella organisation, we put our shared vision of care into practice not only in words, but also through practical support, for example in construction and infrastructure,” says Francis Fraeyman, Director of Construction and Engineering at Woonzorggroep GVO.

New-build plans revised 

“In line with our vision, the new care campus had to become an extension of the neighbourhood. We aspire to create a warm, safe community where everyone feels at home, including people with dementia. VK architects+engineers, part of Sweco, delivered on that ambition. Their design, with its open massing, creates a strong connection with the surroundings and gives the site an inviting character,” explains Francis Fraeyman. “A beautiful design was on the table, but then the Covid pandemic broke out. During the ongoing public tender for the construction works, in spring 2021, it became painfully clear just how sharply prices had risen. The project needed to be adjusted to keep it within budget. The planned number of rooms was reduced from 130 to 120, and one of the two planned day care centres was cut. We switched to the ‘Engineering & Build’ procedure, which offered greater scope for negotiation and an efficient, affordable outcome.” 

A patio with a water feature adds a touch of nature and tranquillity.
Each floor has two living groups, where small-scale, normalised and safe living is central.

Working together as one team

After the tendering procedure, housing provider ibens came on board. The word is deliberately chosen. As ibens puts it: “We are more than just a contractor. Our expertise extends beyond concrete works, façades and roof structures. For us, it is essential to work as one team with the client, architect and all contractors and subcontractors. That partnership and shared responsibility are crucial to the success of every project.”

“It soon became clear that Woonzorggroep GVO, VK architects+engineers, part of Sweco, and we were on the same wavelength in terms of our vision,” explains Sébastien Commeyne, Business Developer at ibens. “Getting the finances to add up was the first major challenge. Drawing on our expertise, we put forward a proposal outlining potential savings. 

By coordinating this closely with the client and architect, we achieved successful optimisations while maintaining or even improving quality. We proposed three targeted measures to reduce costs: the air handling units were installed on the roof, the rooms were reduced by 1 m², and the kitchen was relocated to the basement, where a sunken courtyard brings in pleasant natural light. Each adjustment also benefits the rest of the construction process. Take the decision to position the air handling units on the roof. By running the ventilation ducts directly up to the roof, we eliminated suspended ceilings and reduced the overall height of the building. We were also able to significantly reduce the basement area while creating more usable space. 

Lean at every stage

“The project’s main challenge lay in phasing and the associated coordination,” explains project manager Jens De Coster. “The old buildings were demolished and replaced in stages, allowing residents to remain in the care home throughout. Thanks to careful phasing and the choice of precast concrete construction, disruption was kept to a minimum. Everything apart from the foundations and basement was produced off site. Only the assembly of the prefabricated components took place on site. As well as shortening the construction period, this approach ensured a high-quality, precise finish. The extensive use of BIM also enabled the construction teams to work together efficiently on the project. All data was shared accurately via the 3D model, ensuring that every party had up-to-date information at all times. At ibens, we leave nothing to chance when it comes to coordination. That is why daily site meetings are central to our approach.”  

The interior of the brand-new SAMEN Wakken care home combines a welcoming atmosphere with high-quality care.

Care and collaboration make the difference 

A welcome achievement: this unique new-build project was completed just before the summer, within a feasible budget and without compromising on functionality, quality or aesthetics. WZC SAMEN Wakken now accommodates 110 permanent residents across several living units, as well as ten short-stay rooms. The day care centre also offers a contemporary care model for older people who need support during the day. “Like the residents and care staff at SAMEN Wakken, we are extremely pleased with the end result,” concludes Francis Fraeyman. “Providing a safe, comfortable home and tailored care is paramount in every respect. The architectural concept, which encourages people to meet and connect, also reflects the open approach to care championed by Woonzorggroep GVO.”     

GLK: Earthworks

Moving heaven and earth, as the saying goes. In this case, it was the earthworks that played a major role in building the brand-new ‘SAMEN Wakken’ care home. “The foundation and drainage works were carried out in stages, each time coordinated with progress on the building works. The existing care home had to remain operational,” explains Arthur Lippens, project manager at GLK. “That meant finding ingenious ways to work around the constraints, with temporary solutions for access roads, car parks, drainage, spare ducts and utility connections. A carefully considered approach was essential to prevent problems. Once again, we demonstrated the value of GLK’s broader perspective on earthworks. This was borne out by our constructive collaboration with ibens, which we look back on very positively.” Those seeking a contractor for earthworks, demolition and site works will find a professional partner in GLK. The East Flanders-based company also places a strong emphasis on recycling. Surplus soil, demolition waste, rubble and other waste streams are sorted in accordance with legal requirements and reused on site wherever possible. 

KREANTIS: 3D drafting 

With five years behind it, KREANTIS is a relatively young company, but one that brings together extensive expertise in areas including civil engineering projects, precast concrete and industrial design. The independent structural engineering and drafting consultancy focuses on structural engineering, building services, construction and BIM. Main contractor ibens saw KREANTIS as the ideal partner for the detailed drafting work that was crucial to building the new ‘SAMEN Wakken’ care home. “Preparing the detailed production drawings was a crucial preparatory step, as the precast components and reinforcement sections were manufactured in the factory and then delivered to the site ready for installation,” says Senne Cuypers, Director at KREANTIS. “The client supplied the complete Revit model, which was exported to IFC, and we then developed it further in Tekla. This enabled us to achieve the best possible result. Because the new-build project was phased, KREANTIS was engaged several times, from the first detail drawings in June 2022 to the final ones at the end of 2023. This demonstrates our flexibility and expertise in providing long-term project support. We are proud of our contribution to this landmark project, which fulfils a valuable social function. We thank ibens for placing its trust in our expertise.”

PROJECT SPECIFICATIONS

Client SAMEN vzw (Tielt)
Architect VK architects+engineers, part of Sweco (Brussels, Charleroi, Ghent, Roeselare, Antwerp)
Main contractor(s) ibens (Antwerp)

Een zakelijke vraag aan VK architects+engineers? Get in touch

Wie aan SAMEN Wakken werkte

  1. main contractoribensMentioned in Perfectly fitting precast walls for a new residential care centre
  2. wandpanelenVan Maercke Prefab BetonMentioned in Perfectly fitting precast walls for a new residential care centre
  3. architectVK architects+engineersIn this story
  4. clientSAMEN vzwIn this story
  5. groundworksGLKIn this story
  6. 3D-tekenwerkKREANTISIn this story

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectSAMEN Wakken
  • SubjectHealthcare projects
  • CompanyVK architects+engineers
  • CompanySAMEN vzw
  • CompanyGLK
  • CompanyKREANTIS
Share this article

Follow Bouwen aan Vlaanderen

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.