Contemporary headquarters for Antwerp police
Text Koen MortelmansImage Politiezone Antwerpen

The iconic Oudaan in the city centre is no longer Antwerp police’s headquarters. The force recently moved into a new, purpose-built complex along the Ring and Binnensingel, close to Berchem railway station.
The ‘master building’ is in an easily accessible location, making it an excellent base for the whole city. It accommodates more than two thousand staff and brings together all policy implementation and support services of Politiezone Antwerpen, including the response teams. Neighbourhood policing remains distributed across the various local police stations. This arrangement is based on a master plan and the principle of ‘centralisation where possible, deconcentration where appropriate’.
The master building has a total floor area of 78,000 m², spread across ten above-ground and four underground levels. It incorporates the latest security technology while also providing a pleasant and flexible working environment. As well as offices, the building includes a range of dedicated police facilities, such as interview and interrogation rooms, sports and training areas, and a detainee zone.

Glass façade
The office area is located mainly along Binnensingel. Here, the façade consists largely of windows offering views of the Singel and the station square. The public entrance is also on this side. The semi-public area, which includes interview and interrogation rooms, meeting rooms, a press room and an auditorium, is located partly in the centre of the building and partly along the Singel. The briefing rooms, changing rooms and sports and training facilities are arranged along the Ring. Externally, the appearance is defined by extensive glazing, aluminium cladding in various shades of silver and gold-coloured travertine cladding on the side façade.
A spacious patio in the centre of the building serves as a ‘police square’ and is intended to form the beating heart of the master building. It also creates a visual connection between the kitchen and dining area for police staff and the office zone. Detainees, who are held underground, have less visual comfort. The underground levels also provide parking for one thousand cars and 1,400 bicycles.
DBFM
The master building was delivered under the DBFM model by the Post X LPA consortium, a project company with BESIX Group as its 100% shareholder. The multidisciplinary team also includes BEEL Architecten, Jaspers-Eyers Architects, engineering consultancies VK architects+engineers, part of Sweco (building services), and Stedec (structural engineering), main contractor BESIX nv and Equans (maintenance).
“BESIX had been involved in the project as construction partner since 2017. In 2020, we took the lead,” says Koen Peeters, operations manager and project director at construction company BESIX. “As the preliminary design was developed into the final design, we played a leading role as contractor in working out the details. We took great care to ensure that the design met the requirements set out in Stad Antwerpen’s performance specification.”

Maintenance strategy
Other key considerations included ease of maintenance and the total cost of ownership (TCO). “That is why maintenance planning was incorporated into the design phase. Together with the other construction partners, we assessed which materials and systems best suited the maintenance strategy. Given the building’s function, the requirements in the specification were rightly stringent. The combination of some of these requirements made this project particularly challenging in certain respects. The cell doors, for example, had to meet strict security standards as well as stringent acoustic requirements. That is not a common combination, so there was no off-the-shelf product or system available on the market. Working with our subcontractor and supplier, we developed a high-quality solution and had it verified through several tests.”
Een zakelijke vraag aan VK architects+engineers? Get in touch
Who worked on it
- ClientAG Vespa (Antwerpen)
- ArchitectBEEL architecten (Gent) en Jaspers-Eyers Architects (Brussel, Leuven, Hasselt)
- Main contractor(s)BESIX (Brussel)
- Also involved
VK architects+engineers - Also involved
Sweco Belgium
Keep following this
Get an email when a new story is published. No account needed.
- SubjectConstruction projects
- CompanyVK architects+engineers
- CompanySweco Belgium