A large underground car park, a green courtyard, geothermal boreholes, a façade to be retained and homes with a range of roof shapes: BOEVRIE has plenty in store from a structural engineering perspective.

COBE ingenieurs translated these challenges into efficient structural solutions, with particular attention to buildability and cost.

Strong slab, open space

One of the key considerations lies between the buildings, where the courtyard is being created above the underground car park. “It had to be able to support a load of 2,500 kg per square metre,” explains Stijn Gurdebeke, project engineer at COBE ingenieurs. “The fire brigade also needed to be able to drive across it in the event of a fire.”

The solution was a 40-centimetre-thick in-situ concrete roof slab. By avoiding downstand beams beneath the slab, maximum flexibility is retained for the building services. The foundation slabs could also be positioned higher. This meant less excavation and lower basement walls, an intervention that brought both structural and economic benefits.

Slimme stabiliteitskeuzes geven BOEVRIE ruimte

Coordination down to ground level

The BEO field also required careful coordination. A total of 120 geothermal boreholes, each 150 metres deep, were drilled for BOEVRIE. Although their design was not part of COBE’s remit, the engineering consultancy had to ensure that the boreholes did not conflict with the piled foundations beneath the basement. “At any one location, you can have either a foundation pile or a geothermal borehole, but obviously not both.”

New load-bearing structure behind existing façade

Another challenge was an existing façade that had to be retained. A digital survey revealed that it was considerably thinner than originally assumed. It was therefore decided not to transfer the loads of the new building onto the façade. A new load-bearing calcium silicate masonry wall was built on the inside, with insulation within the same build-up. The existing façade can thus be retained as a façade without serving a load-bearing function.

Every roof is different

There is also more variation above ground than the streetscape might suggest. Several spaces extend up to the ridge, and the roof shapes differ from one another. This also made the roof structures particularly challenging to calculate. Where possible, glulam beams were used to avoid steel sections and simplify connections to the rest of the timber structure.

The result shows how advanced structural engineering is about more than load-bearing capacity: it is also about space, buildability and economic efficiency.

Question about this story? Ask your question

Wie aan Boevrie werkte

  1. stabiliteitCOBE ingenieursMentioned in Bruges to gain a distinctive new neighbourhood
  2. contractorFurniboMentioned in Bruges to gain a distinctive new neighbourhood
  3. architectural practiceBildt.Mentioned in Bruges to gain a distinctive new neighbourhood
  4. architectural practicenoAarchitectenMentioned in Bruges to gain a distinctive new neighbourhood
  5. property developerSteenovenMentioned in Predictable building on an unpredictable site
  6. interieurafwerkingHolvoetMentioned in Predictable building on an unpredictable site
  7. studiebureau akoestiekSonIQMentioned in Acoustics: an essential part of every construction project

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectBoevrie
  • SubjectConstruction projects
Share this article

Advertisement

Follow Bouwen aan Vlaanderen

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.