Construction projects

HVAC that aligns with the vision for functionality and aesthetics

Cegelec stond in voor de indrukwekkende technische ruimte.
Cegelec stond in voor de indrukwekkende technische ruimte.

Cegelec delivered a technical and logistical tour de force at the new Trade Fair, Meeting and Congress Centre in Bruges. The City of Bruges commissioned the new trade fair and congress building on Beursplein, with floor areas of 5,000 and 10,000 square metres respectively. Cegelec was responsible for installing the HVAC and sanitary systems in this prestigious Design & Build project. Aesthetics and acoustics were also key considerations. 

The initial phase of the project was dedicated to modelling all the concrete openings in the 3D BIM model. Cegelec already had extensive experience with the technology, making it the ideal partner. Senior Project Manager Bart Vandermeersch: “The interiors of the entire trade fair and congress building are characterised by exposed concrete and open ceilings. In the technical room on level 2, we had to take diagonal load-bearing beams into account. The BIM model gave us a realistic picture of the installation yet to be built.”

Transporting and installing large components presented a logistical challenge.

High standards

“Our systems track where people are, measure CO2 levels and adjust the temperature and airflow in each room,” says Bart Vandermeersch. The building has a near-zero-energy character, thanks in part to efficient and sustainable technologies such as heat pumps with geothermal energy and the use of rainwater for sanitary purposes. Aesthetics also played an
important role. “On the one hand, all the control and regulation cables were concealed in the concrete; on the other, all the systems in the ceiling remained visible through the open slats.”

An exceptional acoustic calculation was also carried out for this project. Cegelec always takes account of the attenuation provided by its own installations, but at the trade fair and congress building the reasoning also worked in the opposite direction. “Events here can reach 95 dB, and that sound must not escape through the HVAC systems,” explains Bart Vandermeersch. “It was certainly a logistical challenge,” he concludes. “We processed and installed all materials as soon as they were delivered, because there was no room for storage on site, in the middle of a residential neighbourhood. Nevertheless, we completed the project successfully, resulting in a high-performance Trade Fair, Meeting and Congress Centre.”    

Question about this story? Ask your question

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • SubjectConstruction projects
Share this article

Advertisement

Follow Bouwen aan Vlaanderen

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.