Construction projects

Westkapelle, Belfius Basecamp | Training in complete comfort and luxury

Westkapelle, Belfius Basecamp | Training in complete comfort and luxury

League champions Club Brugge recently had a brand-new training complex built in Westkapelle (Knokke-Heist). The impressive new home of the first team, the U21s and the U18s cost a tidy 16 million euros. The coaching staff, together with the medical and administrative teams, have also moved into the new state-of-the-art centre, which has been named Belfius Basecamp.

‘No sweat, no glory’. The slogan of Club Brugge proudly adorns the façade of the main building. A reminder to players to give their all in training? Whatever the sporting performances, the successful football club is certainly proud of its brand-new base. And rightly so. The complex offers everything an ambitious top-flight club needs, and more.

No shortage of facilities

Belfius Basecamp has three floors. The ground floor covers an area of 5,000 square metres, including a 2,100-square-metre indoor artificial turf pitch. It also houses the changing rooms, a gym, medical facilities, a swimming pool and the press room. The first floor provides 2,000 square metres of space, accommodating the offices of the technical and sporting staff, the restaurant and the players’ lounge, a relaxation area for the players. Level 2, also measuring 2,000 square metres, contains accommodation with 37 rooms for the players and one for the coach. These facilities are intended for team camps ahead of first-team matches, as well as for (mini) training camps for the first team and the U21s. The administration department is also based on the second floor.  

“Impressive is the word I’d use to describe the complex,” says Jan D’Hulster, project manager at Alheembouw. “Both the first and second teams train here, and the further you go into the building, the closer you get to the first-team facilities and the more refined the finish becomes. Absolutely everything has been provided for.” As main contractor, Alheembouw was responsible for the structural work, weatherproofing and coordination of the finishing works and building services. The entire complex was completed in just nine months, from the first column to the last coat hanger.

Westkapelle Belfius Basecamp

The complex has a fully equipped gym for the players.

Structure as finish

You might think that would be easy with a prefabricated structure. “Nothing could be further from the truth,” D’Hulster explains. “The short construction period required meticulous coordination of the subcontractors. For weeks, and even months, almost a hundred workers were on site virtually all the time. They also had to take particular care with the many elements left exposed. The basic structure is concealed as little as possible behind suspended ceilings, plasterboard or paintwork. In effect, we were already working on the finish during the structural phase.”

The exposed concrete blockwork is laid in Flemish bond, in three variants: classic, lattice and relief. Alheembouw opened an additional production line at its factory to manufacture the 35,500 half-blocks required for the bond. Cutting that many blocks on site would have been too labour-intensive and unhealthy for the workers. The finishes combine timber, concrete blockwork and precast concrete.

The training pitches are irrigated with reclaimed rainwater. During dry periods, groundwater is pumped up through deep drainage and desalinated in a purpose-built room.

Precast

The structure of Belfius Basecamp, together with the covered stand, was built using precast concrete elements. A practical building has also been provided next to the stand. “The groundskeepers’ room is used for storage and serves as a physical training area,” says Jan D’Hulster. “The bespoke stairs and sloping ramps up to the roof, finished with artificial turf and sand, provide an ideal setting for additional training sessions. Every square metre of the site has been put to good use.”

Valcke Prefab Beton supplied the precast concrete elements. It installed no fewer than 370 concrete sandwich panels for the façade, 94 columns measuring 11 metres, 175 floor and roof beams, and three lift and stair cores. “Those stair cores are 4.7 metres wide,” explains Thomas Naessens, project manager at Valcke Prefab Beton. “That is the maximum width we can produce in precast.”  

Westkapelle Belfius Basecamp

Belfius Basecamp has three floors. The ground floor covers an area of 5,000 square metres.

Optimum preparation

Valcke Prefab Beton handles everything in-house, from engineering and production to transport and installation. “That is the only way to keep to a tight schedule and meet the deadline,” says Naessens. “The precast concrete elements form both the external façades and the internal structural elements. We were able to produce them under optimum conditions in our workshops. This meant they were not exposed to the effects of poor weather on site, benefiting both the quality of the work and its appearance.”

The precast elements were manufactured in advance. This required careful preparation and close collaboration with the main contractor and the architectural firm. Working with a BIM model in Tekla, the team was also able to visualise the preparatory process to optimum effect, taking the building services into account. Before the building services contractors had even been appointed, the construction team had determined the necessary openings in the precast structure.

Viewed from the outside, the building looks like a very simple and straightforward structure. But appearances can be deceptive. Good planning, attention to detail and careful workmanship have made this ultra-modern training complex a real success. Now let’s hope the football results are just as successful …    

Question about this story? Ask your question

Wie aan Belfius Basecamp werkte

  1. façade finishingWoodstoxxMentioned in Westkapelle, Belfius Basecamp | Timber beam structure makes Belfius Basecamp stand out
  2. main contractorAlheembouwIn this story
  3. prefabbetonelementenValcke Prefab BetonIn this story

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectBelfius Basecamp
  • SubjectConstruction projects
  • CompanyAlheembouw
  • CompanyValcke Prefab Beton
Share this article

Advertisement

Follow Bouwen aan Vlaanderen

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.