Back to modernity
Text CIT Blaton en Philippe SelkeImage Yvan Glavie en CIT Blaton

The Louise, a 90-metre-high, 24-storey tower on Avenue Louise in Brussels, recently underwent a major renovation. The works included renewing the façades and building services, as well as refurbishing the office space in the podium and tower. The aim of the renovation was to bring the tower into line with new standards for comfort and energy efficiency, while respecting its original architecture. Mission accomplished!
After almost three years of hard work, the team led by Éric Cantillon, Project Director at CIT Blaton, was putting the finishing touches to the project before the site was officially closed on 6 May. Éric Cantillon: “We completely stripped the building back, leaving only the basic structure. The interior and façades of the Louise Tower were demolished from A to Z … or rather, from Z to A. Our teams first tackled the upper floors, then the lower ones, before rebuilding the building from the top down rather than from the bottom up, as is usual. This allowed us to remove all the construction waste without damaging the newly renovated floors.”

The Louise in figures
At 90 metres tall, The Louise has a gross above-ground floor area of 28,500 m² and 24 floors, or almost 24, since, as in every bank or insurance company building, there is no 13th floor: superstition reigns supreme! The tower also has two annexes, with four and six floors respectively. To top it all off, the three basement levels house an underground car park, bicycle parking, plant rooms and changing rooms, covering a total of 9,880 m².
A large volume of concrete was poured on site. The use of precast elements was limited to 280 columns and beams, 1,662 m² of floor slabs and no fewer than 328 staircase elements, all of which were rebuilt.
Challenges overcome with flying colours
Every project, especially a major one, comes with its fair share of challenges. At The Louise, logistics proved the biggest difficulty. The building is in the heart of the city and surrounded by homes, which made delivering materials and removing construction waste considerably more difficult. The neighbouring streets are also very close to the building. Safety was therefore a key concern, as nothing could be allowed to fall and risk injuring passers-by.
Another major challenge was that, although the building is not listed, it does have heritage value. The façades were therefore reconstructed identically. The old profiles were reproduced to the nearest millimetre, and the same type of glazing was used to restore the original appearance, albeit with much better thermal insulation. Bespoke work, carried out to the highest standards.

A green building
Sustainability was also a key priority. During the works, the targets were raised to include CO2 neutrality, and the original plans were amended to remove all but one of the boilers and replace them with a large, much more environmentally friendly heat pump. The Louise is also fitted with green roofs and PV panels. Energy consumption will be reduced further thanks to a new ventilation system, high-performance double glazing and an efficient ceiling cooling system, all of which had been included from the outset. Future users will also benefit from advanced technology that allows them to manage the building by zone. Among other things, everyone can adjust the lighting and heating levels in their own zone and operate the solar shading screens via a smartphone app.
“Because the decision to make the building more sustainable was taken only after work had started, the deadline was pushed back. As a result, we handed over The Louise in May 2024 instead of September 2023, as originally planned,” explains Éric Cantillon.
Belgian-made resin floors for high-end car parks

The eponymous tower on Brussels’ famous Avenue Louise recently received a much-needed facelift. Not only above ground, but below it too. Specialist 4M Group installed new polyurethane resin flooring in the underground car park levels, complete with the associated markings.
Headquartered in Battice and employing 140 people, the Belgian family-owned 4M Group is one of the market leaders in industrial and decorative floor coverings based on epoxy and polyurethane resins. In Belgium, the group is the largest resin buyer by turnover, as well as a major producer through its subsidiary SelectColor. CIT Blaton called on the latter to renew the floors on The Louise’s three underground car park levels, including the plant rooms.

Specialist flooring
Romain Lejeune, Operations Manager at 4M Group: “The area to be treated covered approximately 8,500 m². To manage coordination on site as effectively as possible and prevent the new floors from getting dirty, we worked in several phases, taking care not to disrupt the work of the other contractors and subcontractors. Conditions on sites like this can sometimes be difficult, but that is simply part of our challenging profession. Fortunately, the expertise and dedication of our specialist teams make a great deal possible.”
Different types of resin are used depending on the specific requirements of the project, such as chemical, thermal and antistatic resistance. The floor covering used at The Louise is a polyurethane resin manufactured in Belgium and specially developed for car parks. This type of covering is resistant to hydrocarbons, chlorides and heavy traffic.
Site manager Bart Hagen: “A major renovation like this always involves unforeseen circumstances, but the work went well, and the excellent collaboration with CIT Blaton enabled us to deal smoothly with the most challenging moments during the project.”
Question about this story? Ask your question
Who worked on it
- ClientPATRIZIA Belgium (Brussel)
- ArchitectA2RC ARCHITECTS (Brussel)
- Main contractor(s)CIT Blaton (Brussel)
Keep following this
Get an email when a new story is published. No account needed.
- SubjectBrussels