Modern, comfortable living in the heart of the city is increasingly in demand in Flanders. Harelbeke is a case in point. Woonresidentie Over Leie has only just been completed and is already 90% sold. Despite the wet spring, the complex of 28 two- and three-bedroom apartments was built at speed, thanks to an innovative prefab technique.
Over Leie is a construction project by Danilith Delmulle. It was developed for older people looking to downsize, as well as young couples seeking their first home. Its location is a major asset: a quiet and attractive residential area bordering the Leie and within walking distance of the centre
of Harelbeke.

Classic looks with modern comfort
At first glance, Residentie Over Leie looks like a classic building, yet it fits perfectly into its surroundings. The modern apartments are equipped with solar panels and arranged around a courtyard, giving residents a bright, green outlook despite being so close to the centre. The garden serves not only as a place to relax and meet, but also helps collect and retain rainwater, contributing to the project’s sustainability and easing the burden on the public sewer system.
Delivered right on schedule
“Construction of Residentie Over Leie went exactly to plan,” says Thibaut Debosschere, site manager at Danilith. He followed the progress of the project closely: “The basement was poured in spring 2023, and the shell was already standing before the Christmas holidays. As the building was wind- and watertight by January, we were not affected by the wet spring. The project was therefore completed in June, entirely on schedule.”
The speed at which this project was built is mainly down to Danilith’s prefab construction system. Developed and refined in-house, the system enables the company to significantly shorten construction times compared with traditional building methods. As a result, projects such as Residentie Over Leie can be delivered much faster and more efficiently.

A first at Batibouw
Danilith’s prefab system is what sets the company apart from other builders. The company developed the technique fifty years ago, and in 1975 it even made history at Batibouw: it was the first company ever to build a complete show home there. Even Prince Albert and Princess Paola came to admire it.
Prefab construction is now used not only for family homes, but also for large-scale projects such as Residentie Over Leie. Thibaut Debosschere explains how it works in practice: “The architectural plans are translated into prefab panels at our factory. These have a sandwich structure: an outer layer of facing brick, followed by insulation and an inner layer of concrete. The windows and external doors are fitted into the panels at the factory, saving considerable time and labour costs on site. The walls are then assembled directly on the building site, making the building virtually wind- and watertight straight away.
The sustainability of prefab
This Danilith prefab approach has many advantages. As well as significantly reducing construction time, it also makes the process much less dependent on the weather, which can be useful in our climate. Danilith buildings also have far better airtightness and energy efficiency, enabling them to meet strict energy performance standards with a thin layer of insulation.
All in all, it is a highly sustainable system. For one thing, walls and roofs are manufactured centrally, optimising waste management. This means less waste and fewer building materials need to be transported, while offcuts can be reused directly at the factory.

A success story
Construction of Residentie Over Leie was completed in June 2024. At handover, only four units were still available for sale. This shows that residential developments like this clearly meet market needs and continue to appeal to a wide audience.
Question about this story? Ask your question
Who worked on it
Residentie Over Leie in Harelbeke
- main contractorDanilith Delmulle
- clientTogofill
- architectWielfaert Architecten
Keep following this
Get an email when a new story is published. No account needed.
- ProjectResidentie Over Leie
- SubjectWest Flanders
- CompanyDanilith Delmulle
- CompanyTogofill
- CompanyWielfaert Architecten