A flexible school thanks to Design & Build

Deurne has a brand-new nursery and primary school in ’t Vliegertje. It is a building that excels aesthetically…
Deurne has a brand-new nursery and primary school in ’t Vliegertje. The building excels in aesthetic, energy and functional terms. Designed as a hinge point in the residential neighbourhood, it takes the form of a sculpture that architecturally stitches the surrounding buildings together. Flexibility was the starting point, reflected in an interior featuring numerous multifunctional intermediate spaces.
The new school is a broad, three-part complex, with a space for 192 nursery pupils at one end
and a primary school for 288 pupils at the other, above the dining hall. The two are linked at the corner by an entrance area, sports hall, offices and staff room. “By combining three building typologies, the building takes on a different form depending on its location. This allows it to blend seamlessly into its surroundings while also asserting its public character,” says Olaf Koulen of BULK architecten.

The new school is a broad, three-part complex, with the two end wings linked in part by a sports hall on the corner.
Flexible and sustainable
The building has a concrete structure and is finished with a combination of red brick, accents of white glazed brick, fair-faced white concrete and light aluminium joinery. Yellow canopies provide shade from the sun and give the building a playful visual touch. “We have creatively provided space for quiet areas,” continues architect Olaf Koulen. “For example, the corridors are considerably wider than usual, allowing them to double as play and learning zones. Adaptability was a key starting point in the design, giving the school a highly future-proof layout. It is also built to stand the test of time in terms of sustainability. ’t Vliegertje was designed with virtually no thermal bridges, and considerable attention was paid to airtightness. Other features include low-temperature heating, heat recovery wheels, demand-controlled air flow, LED lighting, presence detection and push-button taps …”
Using the construction team model
’t Vliegertje is the result of a Design & Build approach in which BULK architecten and Van Roey worked together as a ‘construction team’. “Within a pre-agreed budget, we jointly designed an ambitious building that meets the brief perfectly,” says Ben Lotry, senior project manager at Van Roey. “We were also responsible for the construction, working with several appointed specialist subcontractors. Our own workers carried out all the bricklaying and formwork, while the rest was entrusted to capable subcontractors, including several other companies in our group. Staalbeton was brought in for the precast elements, reinforcement, handrails and various bespoke items. Vanhout.pro supplied all the furniture.”

The building has a concrete structure and is finished with a combination of red brick, accents of white glazed brick, fair-faced white concrete and light aluminium joinery.
Against the clock
The biggest challenge was the schedule: piling began in August, and the school had to be completed exactly twelve months later. “There were also some particular technical challenges, such as the brickwork, much of which was left exposed and therefore had to be carried out to the highest standards,” continues Ben Lotry. “There were also stringent requirements for airtightness, fire safety, acoustics and flexible use of space. It took many pieces of the puzzle to make everything fit together. Fortunately, we now have considerable experience with projects of this kind and with working as a construction team. The result is a successful project that we, the architect and the client are all proud of.”