Since November 2024, pupils at GO! Leefschool Heyerdahl in Sint-Niklaas have been able to attend lessons in a new building that radically breaks with traditional ideas of what a primary school should look like. The innovative design puts inclusivity, accessibility for all and user experience centre stage. The result is a compact nursery and primary school that can accommodate a range of uses and is therefore also a ‘true’ part of the neighbourhood.
GO! Leefschool Heyerdahl is a primary school that describes itself as a ‘warm nest where children are given every opportunity to grow’, in an open environment with strong parental involvement. Each year group has a class group, and two class groups together form a learning community. Activities involving different learning communities are regularly organised to help young and old learn to interact with one another.

A building with a signalling function
The team of Pellikaan, dmvA Architecten and Architectengroep A4 steered this Design & Build project to a successful conclusion. “We were tasked with developing an architectural concept that reflects the vision of GO! Leefschool Heyerdahl,” says Melissa Lambrecht, architect and director at Architectengroep A4. “It was a challenge we were keen to take on. Together, we came up with a design centred on the wellbeing of everyone involved, a love of learning and the commitment that grows out of it.”
The new school lies between the existing Clementwijk and the new residential neighbourhood on the northern edge of the city. “A network of small waterways, paths and streets makes this neighbourhood easy to move through,” Melissa Lambrecht continues. “Because the school site is at a junction on these pedestrian and cycle routes, we wanted it to have a signalling function. It had to become the main meeting place in the new development. We fulfilled this brief through a combination of the building’s form, siting and finishes.”


Design for inclusive use
The new 1,823 m² gross floor area building, with two storeys, was positioned centrally on the site. “Around it, we defined three play areas: an urban sports court, a landscaped bank and a main playground,” says Melissa Lambrecht. “Next to the bank, we provided an outdoor classroom/amphitheatre that can also be used by third parties. The same goes for the school’s sports hall, which, with its own canopy, outdoor space and sanitary facilities, is intended to become the beating heart of the new neighbourhood. All the shared spaces and forums were also designed to accommodate a range of uses.”
“We also paid particular attention to accessibility for all. All doorways and transitions are step-free, and we provided wide corridors, a central lift and manoeuvring spaces by the doors. Window openings are strategically placed to provide sufficient contrast and daylight, while the choice of colours and materials provides structure and aids orientation. Acoustics are also a crucial element of accessibility for all. In addition, circulation routes are highlighted and different floor finishes are used in different spaces. In this way, we addressed the need for accessibility for blind and partially sighted people, while also giving children with conditions such as autism spectrum disorder a point of reference.”
The forum as the hub of the school
GO! Leefschool Heyerdahl is an L-shaped building with a concrete frame, finished in red brick, with a projecting pattern on the upper floor, and white external joinery.
This follows the material palette used in the neighbourhood. “At the centre of the ground floor is a forum that spans two levels and serves as a versatile space for meeting, relaxing and gathering,” says Melissa Lambrecht. “Large windows create a close connection with the green surroundings. By making the forum so spacious, we were able to do away with most corridors, freeing up extra space for classrooms.”
The main entrance, administrative offices, staff rooms and sports hall are arranged around the forum. At the rear of the ground floor is the nursery area, with its own entrance and outdoor space. The primary school occupies the first floor. Each key stage has two teaching rooms and a group-work space.

A construction project with unforeseen challenges
Although Pellikaan is no stranger to school construction, delivering GO! Leefschool Heyerdahl proved far from straightforward. “From a construction point of view, this project was right up our street,” says project manager Koen Verhoeven. “However, the persistent rain caused major disruption. The structural, brickwork and roofing works were badly affected, resulting in significant delays. There were also a few unforeseen events. We even had to temporarily make the building wind- and watertight so that certain subcontractors could carry out their work.”
“In short, delivering GO! Leefschool Heyerdahl was a major challenge. It cost us a great deal of blood, sweat and tears, but thanks to our expertise and the flexibility of our Design & Build team and subcontractors, we once again succeeded in delivering a high-quality and, above all, progressive school building that we are particularly proud of. We have another excellent reference project that clearly showcases Pellikaan’s D&B experience,” concludes Koen Verhoeven.
Studie10: Structural engineering, building services, EPB and thermodynamic simulation
The role of an engineering consultancy is invaluable in any construction project. That is why the construction team for GO! Leefschool Heyerdahl decided to bring Studie10 on board as a partner. The choice of this consultancy was no surprise. Since its establishment in 2005, it has built a solid reputation for bespoke multidisciplinary projects. “We have the specialist expertise in-house to optimise a project across all areas of study,” say the company directors. “That proved a real added value on this project too. We were responsible for the design, construction supervision and financial optimisation of the structural engineering (the school building’s load-bearing structure) and building services studies covering HVAC, plumbing, fire-fighting systems, high-voltage electrical installations and all low-voltage systems, such as fire protection, access control, intruder alarms, sound systems, data and telephony. We also carried out the EPB study and investigated energy consumption and overheating through thermodynamic simulation. GO! Leefschool Heyerdahl was a major project with its fair share of challenges, but once again we delivered a result that all parties were very happy with.”
Gevitec: Electrical installation
Electrical installations are particularly complex in future-focused schools. GO! Leefschool Heyerdahl therefore opted for a safe pair of hands in this area too, partnering with Gevitec from Schoten, a multidisciplinary electrical engineering company specialising, among other things, in schools and sports halls. “We were delighted to be awarded the contract because it gave us the chance to demonstrate the full breadth of our expertise,” says assistant director Andy Borghs. “Our remit covered the entire electrical installation, including the cabling. We also installed fire alarm and intruder alarm systems, as well as the access control system. In addition, we fitted the solar shading and sound system, and, last but not least, the lighting, which is DALI-controlled. Naturally, coordinating all these systems was no easy task, but our many years of experience enabled us to complete the work without a hitch. Our close working relationships with suppliers and proactive input to the construction team also added considerable value. The main challenge lay in carrying out the work in practice, as many other subcontractors were working in the building at the same time. Fortunately, good communication between everyone involved ensured that everything went very smoothly.”
PROJECT SPECIFICATIONS
Client GO! Scholengroep (Brussels)
Architect Architectengroep A4 (Leuven) and dmvA Architecten (Mechelen)
Main contractor(s) Pellikaan Bouwbedrijf (Zaventem)
Een zakelijke vraag aan Pellikaan Bouwbedrijf nv? Get in touch
Who worked on it
GO! Leefschool Heyerdahl in Sint-Niklaas
- Main contractor(s)
Pellikaan - ClientGO! Scholengroep
- ArchitectArchitectengroep A4
- ArchitectdmvA Architecten
- engineering consultancyStudie10
- electrical installationGevitec
Keep following this
Get an email when a new story is published. No account needed.
- ProjectGO! Leefschool Heyerdahl
- SubjectEducation
- CompanyPellikaan Bouwbedrijf nv
- CompanyGO! Scholengroep
- CompanyArchitectengroep A4
- CompanydmvA Architecten
- CompanyStudie10