Modest primary school transformed into an architectural showpiece

In Zelem, in Limburg, a district of Halen, the village centre has looked a little different since this summer. Municipal primary school Op Dreef has been extended with a contemporary new building, providing space for five nursery classes, a dining hall and a multi-purpose sports hall. The architect and contractor have also shown that they are on a roll: their striking design and construction expertise have further transformed the school complex, which they first extended twenty years ago, into an impressive landmark.

It was an emotional moment at the end of the previous school year. After more than sixty years, the teachers at Berkenbos finally closed the doors of the neighbourhood nursery school of the same name. This summer, they moved all their belongings to the GBS Op Dreef site in the centre of Zelem, where an attractive new building had been specially constructed for them. It marks a major step forward: they now have five spacious nursery classrooms and a dining hall. In addition, a 515 m² gymnasium has been built on the first floor, which can be used by local sports clubs or for small-scale events outside school hours. The outdoor areas also have plenty to offer. The five classrooms have their own small terraces along the side, while the playground opens out into a green space with a woodland play area beyond. In short, the nursery children and their teachers have everything they could wish for.

Intriguing contrast
The extension was designed by dbv architecten, which opted for a contrasting approach in visual and spatial terms. At the front, the new building is set apart from the adjoining primary school, with its reddish-brown brick façades, and the choice of materials also stands out, without creating an architectural divide. Timber and glass take centre stage. Vertical Thermo Ayous slats, fitted at varying intervals to bring an appealing visual rhythm to the dynamic façade, alternate with large windows. The circulation areas, including the stairwell and the link between the existing and new sections, are clad in grey fibre cement boards. At the rear, the ground floor is finished with 3 mm-thick white perforated aluminium sheeting, featuring artistic silhouettes of children at play. At the front, the same material reappears as an open screen protecting the nursery terraces. “As the school is in a wooded setting, we have used natural colours wherever possible, both inside and out. That is why we chose timber slat cladding, which also makes the overall appearance feel much lighter than the sandwich panels on the outer shell, as well as yellow and green tones and timber accents in the nursery classrooms,” says Bertie De Gauquier, architect at dbv architecten.

Significant level difference
Although the aim was clearly to introduce a new architectural language, the primary school and extension still form a coherent whole. At the rear, the existing façade line has been continued; the two buildings are connected internally by a corridor that runs through both, and the extension’s ground floor is at the same level as that of the primary school. This is no minor detail, given the significant level difference across the site. “The street is about 3 metres lower than the ground floor and the playground behind it. As a result, the two nursery classrooms at the front are supported by white steel columns, whose angled positioning creates a playful effect. It also creates a covered entrance and play area at level -1,” says Katrien Van Moll, architect at dbv architecten. “The ground floor is all about openness. We have minimised the ‘corridor feel’ and set out to create a transparent nursery school with plenty of natural light and views of its surroundings, including Zelem’s busy church square. The sports hall has acoustic walls, ball-resistant, dimmable LED lighting and a special floor that does not need to be covered for parties or other events. In short, we have left nothing to chance and done everything we can to maximise comfort, functionality and aesthetic quality. The new building has now been in use for several months, and the first reactions have been extremely positive!”

Construction details
Contractor Schoofs is also looking back on this prestigious project with great satisfaction. “That’s mainly because it involved some unusual construction details,” says project manager Jan Rochus. “Take the aluminium cladding on the rear of the nursery classrooms. It was made entirely to measure and perforated with holes of different diameters to make the figures of children at play
visible. The building also has lots of playful angles and corners, which had implications for the junctions. We reduced the size of the toilets in the existing school building and made some alterations to create a corridor that continues seamlessly into the new building. Another challenge, of course, was the difference in levels across the site, which made our work anything but easy. It took some effort to get the sandwich panels into position, for instance, as the mobile elevating work platform was sometimes at an angle on the slope. Fortunately, everything went smoothly. The extension is certainly impressive, and the client is delighted with the end result!”

Question about this story? Ask your question
Who worked on it
Gemeentelijke basisschool Op Dreef in Heusden-Zolder, nieuwbouw
- clientStad Halen
- architectdbv architecten
- main contractorSchoofs
Keep following this
Get an email when a new story is published. No account needed.
- ProjectGemeentelijke basisschool Op Dreef
- SubjectEducation
- CompanyStad Halen
- Companydbv architecten
- CompanySchoofs


















