Education

One building, two distinct functions

Text Els JonckheereImage Alheembouw

De twee functies onderscheiden zich door hun vormelijke presentatie: volumetrie, materialisatie en kleurgebruik maken het verschil tussen de woon- en leeromgeving duidelijk.
De twee functies onderscheiden zich door hun vormelijke presentatie: volumetrie, materialisatie en kleurgebruik maken het verschil tussen de woon- en leeromgeving duidelijk.

With De Veerboot’s new building in Deinze, GO! has a school to be proud of. The special-needs primary school and boarding facility were fully tailored to their users through a Design & Build project and feature a distinctive design. The two functions are integrated into a single building, yet each has its own distinct architectural character.

The roofs were designed as green roofs and play areas.
De Veerboot and Odisam were brought together in a single building with a compact footprint.

The former De Veerboot was located in Astene, while the boarding facility was spread across two sites in Tielt and Ronse. “GO! decided to relocate everything to the site of atheneum Erasmus on Volhardingslaan in Deinze,” explains Lukas Minnebo, project manager at Alheembouw, which formed a construction team with B2Ai architects, VK architects+engineers, part of Sweco and landscape architect Stefaan Thiers. “To make the most of the site, the D&B team opted for a clear layout in which each programme was assigned a specific place. The design also prioritised a safe cycling environment and the complete preservation of the adjacent woodland. The building is sustainable, too: heat pumps provide heating and hot water. In addition, insulation with 10 % better performance than specified was installed, sufficient rainwater storage capacity was provided, and PV panels will also be installed on the roofs in due course.”

Distinctive architectural expression

The new school, with a gross floor area of just over 4000 m², accommodates 110 pupils, while the boarding facility has 61 rooms. De Veerboot, including its sports hall, is on the ground floor. The two upper floors are home to Odisam boarding facility. “The two functions are distinguished by their architectural expression: massing, materials and colour clearly differentiate the residential and learning environments,” says Lukas Minnebo. “The school façade consists of a grey concrete plinth, constructed using insulated cavity walls. The boarding facility façades are finished with red Equitone Tectiva panels. The structure is made of reinforced concrete infilled with calcium silicate blockwork and stud walls. The roofs are finished with a two-layer bituminous waterproofing system. The roofs above the ground and first floors have also been designed as green roofs and play areas, and are real eye-catchers.”

The upper floors were designed as long volumes, linked by a transverse volume.

Two forms integrated

The school and boarding facility are also clearly differentiated in form. The ground-floor footprint is rectangular, with a number of recesses for covered areas of the playground. 

The upper floors are designed as long volumes containing the boarding facility’s rooms and living areas, linked by a transverse volume housing the communal spaces for the residential groups. The building is located at the intersection of two axes. The main entrance is on the central north-south axis. A covered walkway guides pupils, staff and visitors from the schoolyard to the entrance. 

The school also has its own sports hall.
As all the classrooms are on the ground floor, they all have direct access to the playground.

Challenges posed by high groundwater levels

This project was right up class 8 contractor Alheembouw’s street. “We specialise in complex projects,” explains Lukas Minnebo. “The more challenging the building, the more enthusiastic we are about delivering it. Although this was a fairly ambitious project, everything went smoothly. Our own team carried out the structural work, while the rest was subcontracted and coordinated and monitored by us. The biggest challenge was the very high groundwater level, a problem made even more complex by the wet spring and autumn. This caused difficulties with the foundation work and landscaping. We were able to address the issue with the foundations using adapted wellpoint dewatering. Unfortunately, some landscaping work had to be postponed until this spring. Despite these issues, the schedule was not significantly affected, and the result is a particularly impressive project that we are very proud of. De Veerboot/Odisam is a perfect demonstration of Alheembouw’s experience and expertise in Design & Build procedures, particularly in innovative school construction.”    

Lameire: cold room installation

Boarding pupils need to be provided with their daily meals. That is why a large cold room was installed at Odisam. The contract was awarded to Lameire of Roeselare, a company with more than 35 years’ experience that specialises primarily in refrigeration and air conditioning. “Our main strength is our in-depth knowledge of our market segment, which has been changing at a tremendous pace in recent years,” says managing director Nicolas Lameire. “Our flexible, people-focused and customer-oriented approach is also highly valued. It allows us to respond quickly and directly to every enquiry we receive. We often work for hospitals and laboratories producing medicines, vaccines and so on, but it was a pleasure to work on a project in a school for a change.” On the first floor of the boarding facility, Lameire installed a cold room measuring 2430 x 1830 x 2230 mm, complete with hygienic power racks that make optimal use of the space, and a quiet refrigeration unit on the building’s roof.

TECHNICAL SPECIFICATIONS

Client GO! (Brussels)
Architect B2Ai Architects (Brussels, Ghent, Antwerp, Roeselare)
Main contractor(s) Alheembouw (Oostnieuwkerke)

Een zakelijke vraag aan VK architects+engineers? Get in touch

Who worked on it

De Veerboot in Deinze

  1. installatie koelcelLameire
  2. clientGO!
  3. architectB2Ai Architects
  4. main contractorAlheembouw

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectDe Veerboot
  • SubjectEducation
  • CompanyLameire Funderingstechnieken
  • CompanyGO!
  • CompanyB2Ai Architects
  • CompanyAlheembouw
  • CompanyVK architects+engineers
Share this article

Advertisement

Follow Bouwen aan Vlaanderen

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.