Rapidly growing pupil numbers and ageing buildings: not exactly the ideal combination. The municipal council of Opwijk thought so too, and decided to build a new nursery and primary school in Heiveld. By incorporating a multi-purpose room, a dining hall and out-of-school childcare into the design, the project met several needs at once. And it did so in a particularly sustainable way, as the building complex is nearly zero-energy. 

The new school was built on the existing educational campus in Heiveld, which remained operational during construction. As a result, the project was carried out in two phases. First, one building was demolished to make way for two new volumes: a building housing the administration and a brand-new primary school. With three storeys, each containing six classrooms, this block blends seamlessly with the buildings on the opposite side of the street. The remainder of the site was then cleared to make way for the two-storey nursery school. All the classrooms are arranged around a multi-purpose room, which can also serve as a covered playground and dining hall. The third volume, next to the sports hall, was also completed during this second phase. It houses the dining hall, multi-purpose room, toilets, administration and childcare facilities.

All the nursery school classrooms are arranged around a multi-purpose room, which can also serve as a covered playground and dining hall.

Breaking with tradition

“The decision to work with three volumes was not purely an aesthetic one. Although it did allow us to break with the monotonous, imposing appearance of a traditional school building, which was in fact our main aim,” says Liesbeth Vanderstraeten, architect and partner at Radar Architecten. “We wanted to design buildings where children would feel secure and have plenty of space to play and learn. At the same time, we set out to create a flexible complex that could adapt to the changing needs of education and also be used for out-of-school activities. The multi-purpose room and dining hall were therefore given separate entrances, making it possible to hold parties, events or training courses at weekends. The classroom buildings, meanwhile, have a clear structural framework and a façade design that reflects it, allowing the size or use of the rooms to be changed in the future.”

Working with three volumes made it possible to break with the monotonous, imposing appearance of a traditional school building. (Image: Olmo Peeters)

Designed around children

The arrangement of the three buildings organises and structures the various play areas to suit their users and surroundings. Architect Liesbeth Vanderstraeten explains: “A clearly defined entrance leading to the heart of the school gives the site a strong sense of identity. ‘De Boot’ is also an ecological school, first and foremost thanks to its design, which limits energy demand.”

The architects set out to create a flexible building that could adapt to the changing needs of education. (Image: Olmo Peeters)

A race against the clock

The three volumes provide a usable floor area of 4,477 m². The resulting building complex is fairly large and had to be constructed in difficult circumstances. “Building on a site where the existing buildings have to remain operational is never easy,” says Steven Schyvynck, project manager at Jan De Nul Group, which acted as main contractor. “Schools are particularly challenging sites, however, because young children are everywhere. We therefore had to follow a very strict project schedule and ensure the site was completely secure. We had less than a year to complete the first phase. And for the second phase, involving the construction of two volumes and the installation of external drainage, playgrounds and other landscaping works, we had barely fourteen months. Thanks to detailed construction planning and adapted working methods, we still managed to bring this complex project to a successful conclusion. As a civil engineering contractor, Jan De Nul has extensive experience in delivering large buildings, including many schools. With ‘De Boot’, we have once again shown that projects like this are right up our street.”   

Question about this story? Ask your question

Who worked on it

De Boot in Opwijk

  1. gemeentebestuurGemeentebestuur van Opwijk
  2. architectRadar Architecten
  3. main contractorJan De Nul Group

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectDe Boot
  • SubjectEducation
  • CompanyGemeentebestuur van Opwijk
  • CompanyRadar Architecten
  • CompanyJan De Nul Group
Share this article

Follow Bouwen aan Vlaanderen

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.