Striking forms with a constantly changing perspective

Student accommodation, both to rent and to buy, has been booming for several years, as any first-year business student knows. But while most student rooms offer a rather soulless or old-fashioned experience, VIVES Hogeschool in Brugge took a very different approach. The Crown, the new campus, is an addition to the existing VIVES campus. This truly stunning complex comprises various teaching rooms, an auditorium and student accommodation.

As well as its aesthetic appeal, The Crown’s location is another unique advantage. It is centrally situated on the green campus, close to the main building of the VIVES Noord Catholic University of Applied Sciences and next to the new multifunctional Xaverianen-site. The Crown is also very easy to reach by bike, car and public transport. For ‘the first real living campus in Flanders’, Salens Architecten and contractor Van Tornhaut were among those who joined forces …

A spatial link
Bavo Vereenooghe, architect-engineer at Salens Architecten: “To make this project possible, a rather poor-quality apartment building from the 1970s was first demolished. This made way for a mixed-use new-build project and the partial redevelopment of the campus site. The project as a whole brings together an intriguing mix of functions around a new landscaped setting, creating an attractive link between the new building, the existing site and its surroundings.”

“To respond optimally to the existing buildings on the site and the wider surroundings, we opted for a circular floor plan. A circle is the quintessential symbol of cohesion. It creates a strong new identity, giving VIVES Campus a presence along Xaverianenstraat. The building presents itself from all sides, taking full account of both its neighbours and the buildings on the site itself. Its form makes it particularly inviting to stroll around and offers a constantly changing perspective.”

Fascinating dynamism
The first stone of the VIVES living campus was laid on 10 May 2021. Just under sixteen months later, in good time for the start of the new academic year, The Crown was completed. This was made possible above all by the smooth cooperation of the entire project team and the exceptionally rapid completion of the shell, which took just six months!
Jonas De Brouwer, chief project manager at Van Tornhaut Algemene Ondernemingen: “The new building immediately catches the eye with its circular form and varying heights. Its inspiring blend of different functions creates a real campus atmosphere inside. On the Xaverianenstraat side, you’ll find teaching rooms, along with relaxation areas, a foyer, a food corner and sanitary facilities. The student rooms are ideally located at the quiet rear of the building, overlooking the campus. Each floor has a spacious shared kitchen and a cosy living area for students. Everything comes together around the large central courtyard, creating a fascinating sense of dynamism. A footpath runs through the building, strengthening its connection with other campus facilities. A new cycle path, running right across the campus, also provides a quick and safe link to the station and the centre of Brugge.”
Een zakelijke vraag aan COSMIXX? Get in touch
Who worked on it
The Crown in Brugge
- optische opwaardering beton
COSMIXX - clientION (Waregem)
- ArchitectSalens Architecten (Brugge)
- main contractorVan Tornhaut Algemene Ondernemingen (Aalter)
Keep following this
Get an email when a new story is published. No account needed.
- ProjectThe Crown
- SubjectEducation
- CompanyCOSMIXX
- CompanyION (Waregem)
- CompanySalens Architecten (Brugge)
- CompanyVan Tornhaut Algemene Ondernemingen (Aalter)


















