A striking urban infill project gives the city centre room to breathe

In the heart of Hasselt city centre, the old VTI school buildings have made way for a new residential development with 104 assisted-living apartments, a ‘grand café’, a commercial and multi-purpose space, an area for professional practices and a spacious two-level underground car park.
Two separate volumes, with striking massing and matching roof and façade finishes, one featuring distinctive brick architecture, the other copper shingles, together form Ursulinenhof. Thanks to the inviting passageway to the Schrijnwerkersstraat behind it, the once enclosed Groenplein has taken on an open, airy character.

Anyone who has spent time in Limburg’s capital over recent weeks, months and years will agree: Hasselt is buzzing with construction activity these days. Quartier Bleu has extended the boundaries of the historic centre, which in turn has gained a little extra character thanks to the development of Ursulinenhof, an attractive residential complex that had ample room to take shape after VTI moved and the existing school buildings were demolished. “It comprises two separate entities: a substantial main volume that encloses a semi-public courtyard garden, and a separate secondary volume that seems to stand alone but, thanks to its similar massing, is actually part of the whole,” says Stefaan Evers, architect and partner at a2o-architecten.

Public space as the driving force
The distinctive materials make Ursulinenhof immediately stand out, but that was certainly not an end in itself, stresses Stefaan Evers. “Spatial integration and formal cohesion were our primary considerations. The project fits perfectly with our vision of fine-grained urban development, which is based on crucial links between public spaces, something that cities such as Hasselt are still too often lacking. Ursulinenhof provides a fine response: on the one hand, it connects perfectly with Groenplein, and on the other, it adds new public space in the form of a passageway to Schrijnwerkersstraat. Given the size of the site, we looked for a way to integrate the buildings optimally into the urban fabric, while allowing the architecture to make its own mark. Hence the choice of gabled roofs with a twist and uniform roof and façade cladding. One volume is based on typical brick architecture, while the second building is entirely clad in copper shingles, apart from its glazed ground floor. This naturally catches the eye, but the scale, massing and close relationship with the surroundings are more important in themselves than the striking finish. In short, Ursulinenhof is much more than the architectural interplay between two related buildings, because public space is the project’s true ‘driving force’. Even if some people do not care for the aesthetics, it still adds value to the city!”

A complex logistical puzzle
Aannemingen Janssen is also enthusiastic about the distinctive landmark conceived by a2o-architecten. Building Ursulinenhof was certainly no child’s play, however, says managing director Frank Daems: “From a construction point of view, there were several unusual aspects, such as the copper roof and façade construction of the secondary volume. We held extensive discussions with the client, the fire brigade and the manufacturer to ensure it could be built in a fire-safe way. The site was also in a confined location in the city centre, so we had to organise the logistical ‘flows’ in consultation with the police. Only a limited number of lorries could be in the city centre at any one time, while the others had to wait outside the centre for the go-ahead. That was just as challenging as the construction process itself. We therefore worked in carefully planned phases and even had to use parts of the site as temporary storage areas.”

Comprehensive coronavirus protocol
And then, of course, there was the coronavirus outbreak … “At peak times, more than a hundred people were on site, so initially we had no choice but to suspend work temporarily. Fortunately, we were able to resume our activities relatively quickly, although things were naturally very different from before. In addition to the standard social distancing and hygiene measures, such as extra sanitary facilities, we drew up a comprehensive ‘coronavirus protocol’. We presented it not only to the client, but also to all the subcontractors and suppliers involved. We also worked to daily schedules, with access to a particular stairwell restricted to a limited number of people at a time. It was essential to keep the various parties out of one another’s way as much as possible. In short, the coronavirus crisis added another dimension to the construction of Ursulinenhof, on top of the superb design, varied finishes, technical challenges and logistical and organisational puzzle.”

EGD, roofing
EGD (Lummen) was responsible for installing the bituminous roof waterproofing at Ursulinenhof. “The total area was 1200 m², spread across numerous different roof sections and terraces. The latter meant it was a puzzle to coordinate our work optimally with the activities of the other contractors and subcontractors on site,” explains director Joël Eyckens. “The insulation also had to be laid to falls, which made things more complex than a standard flat roof build-up. The site’s location in the centre of Hasselt did not make things any easier either. The combination of all these factors meant that the overall level of difficulty was higher than on most of the other projects we usually carry out. But given our extensive expertise, EGD has more than seventy years’ experience in roof waterproofing, it was certainly manageable. In the end, everything came together well and the result speaks for itself. Ursulinenhof is a reference project that certainly enhances our portfolio!”
Smeets Laswerken, glass balustrades, steel stairs, handrails and stainless steel tension cables
Ursulinenhof is a feast for the eyes. Smeets Laswerken (Hechtel-Eksel) also played its part, fabricating the glass balustrades, steel stairs, handrails and stainless steel tension cables. “The architecture is highly distinctive, so it was up to us to incorporate
the specific design into our own work, balance the appearance and stability carefully, and complete the job within the agreed timeframe. We faced the first ‘lockdown’ in March, which was no easy matter, but in the end everything fell into place,” says managing director Wouter Smeets. “The combination of our own glass-clamp profile and the copper façade finish works very well. You do not get the chance to create a building with such presence in the centre of Hasselt every day, so we are pleased to have contributed to such a prestigious project. It was not our first landmark project in Hasselt, either, as we also left our mark on Quartier Bleu. And we are currently working elsewhere in the city on the De Bonnefant and Residentie Refuga sites.”
Landmeetkunde-Expertiseburo Teugels, setting out
For the construction of Ursulinenhof in Hasselt, Landmeetkunde-Expertiseburo Teugels (Temse) assisted the contractor with setting out the buildings. “This ranged from setting out pegs for the earthworks and excavation, to marking the main axes for installing anchors and columns, and setting out reference levels,” says director Steven Buytaert. “Providing setting-out information so that buildings can be erected accurately is our speciality. As with every project, we assigned a surveyor and a survey assistant, who monitored the site from start to finish. The surveyor processed the measurements taken on site. Although this was not an exceptional project for us, the setting-out work was somewhat more difficult than usual, as it involved several buildings and phases. We regularly had to establish new reference points so we could carry out our measurement and setting-out work. Given its location, Ursulinenhof is a high-profile project, so we are proud to have completed this commission successfully!”
Beneens Alucon, aluminium external joinery
Aluminium windows, doors, façade systems, solar shading screens, ventilation grilles, sheet metalwork and, for some parts of the buildings, even the weatherproofing between the external joinery and the shell: Beneens Alucon (Olen) focused on all aspects of external joinery for
the Ursulinenhof project. It was a special, extensive and challenging job,
emphasises project manager Fonny Helsen: “I have plenty of experience with large projects, but Ursulinenhof is unique in its class. We installed a wide range of Reynaers systems: MasterLine profiles (windows), CP 155 Minergie profiles (sliding windows), CW50 profiles (curtain wall system) and fire-resistant joinery, including all the glazing, a combination of glazed units with U-values of 1.0 and 0.6. The solar shading screens and Invisivent ventilation system are by Renson. Ursulinenhof had plenty of architectural features in store: triangular windows with aluminium reveal frames, façades with glass corners, doors clad in bamboo … The external joinery on the copper-clad building has a textured coating (8022ST), while that on the main volume is bronze anodised, which created an additional complication given the longer lead time. Moreover, most of the windows were installed before the façade finish was applied. That was no easy matter, especially on the copper-clad building. Despite this, the architect and client set the bar very high. a2o-architecten has a keen eye for aesthetics, while Vestio insisted on seamless finishes without awkward ‘steps’. And we have not even mentioned the logistical difficulties caused by the city-centre location … In short, it was a project full of challenges. We are delighted with the immaculate result!”
TECHNICAL DETAILS
Client THV Groenplein (Hasselt)
Architect a2o-architecten (Hasselt)
Main contractor Aannemingen Janssen (Geel)
A business enquiry for Renson? Get in touch
Who worked on Ursulinenhof
- dak- en gevelbekledingBert Meeus nvMentioned in A made-to-measure copper finish for a prestigious project in Hasselt
- TECU Brass-elementenKMEMentioned in A made-to-measure copper finish for a prestigious project in Hasselt
- ClientTHV GroenpleinIn this story
- architecta2o-architectenIn this story
- main contractorAannemingen JanssenIn this story
- bitumineuze dakdichtingEGDIn this story
- glazen borstweringenSmeets LaswerkenIn this story
- MaatvoeringLandmeetkunde-Expertiseburo TeugelsIn this story
- Aluminium buitenschrijnwerkBeneens AluconIn this story
Keep following this
Get an email when a new story is published. No account needed.
- ProjectUrsulinenhof
- SubjectHealthcare projects
- CompanyTHV Groenplein
- Companya2o-architecten
- CompanyAannemingen Janssen
- CompanyEGD
- CompanySmeets Laswerken