An innovative approach to a care home with character

Creating a characterful, functional environment where residents feel at home and enjoy spending time.
That was the ultimate goal when building residential care centre Pitthem. ‘How would I want to live when I’m old?’ was the question that ran like a thread through both the design and construction process.
Residential care centre Pitthem, whose name refers to the municipality of Pittem’s former spelling, comprises 47 residential care rooms and 25 assisted living apartments, with a total floor area of around 5,500 square metres. The project features a number of innovative elements. ibens nv was part of the team from the outset and, as main contractor, directed the entire process, from land acquisition and concept development through to planning. The Antwerp-based company worked as one team with GC-Architecten on behalf of client Aldea. The construction period was exceptionally short due to the extremely tight building schedule.


ibens is committed to maximising prefabrication and pre-assembly across all its projects. “You can compare it to assembling a car. We see construction as an assembly process,” explains Herman Bernaerts, chairman of the board of main contractor ibens. The entire process is managed using an in-house BIM model. Architect Guido Callens adds: “It was a very different way of working. It was new to me, but I’m fully convinced. The timescale, the flexibility when it came to making decisions and the structured weekly follow-up were all of tremendous added value.”

Client and co-operator
The organisational structure behind the project did, however, add a degree of complexity. Orpea operates the residential care rooms and the rest of the care centre. The infrastructure, on the other hand, is owned by client Aldea, which also operates the assisted living apartments. This made for an interesting dynamic. Both parties were closely involved in the design and construction. “It gave us an enjoyable challenge, such as translating Orpea’s wishes into Aldea’s investment budget. It was a good balancing act,” explains Herman Bernaerts. Fortunately, the excellent collaboration between contractor and architect resulted in the perfect balance: keeping the project financially viable while making the most of its architectural potential.
“The building is designed around the residents’ experience”
A close-knit construction team
The partnership between ibens and GC-Architecten was particularly innovative. While construction projects often use an obligation of means for each subcontractor, in this case the construction team undertook an obligation to achieve a specific result. Herman Bernaerts explains: “A public tender based on price and a bill of quantities is a good example of the opposite approach. That can quickly lead to an adversarial relationship, and to arguments about who was at fault. Our Design & Build contract is an obligation to deliver a specific result based on price, quality and time, which we commit to as a team. That means we strengthen each other throughout the entire process.”

Designed from the inside out
A residential care centre is more than just a building. For its residents, it is a new home. Ensuring that residents felt at ease at Pitthem was therefore the guiding principle behind the design. “The residents’ experience is crucial. Accordingly, we focused on creating a homely feel in the communal areas, with a contemporary touch. Bear in mind that there are two target groups here: people living in an assisted living apartment who are relatively independent, and residents who rely almost entirely on care,” explains Guido Callens. The challenge was to bring these two worlds together while also keeping them separate. The care centre and apartments are linked by a cosy lounge and an experience corridor with a hair salon, manicure and pedicure services, and a beauty salon. The choice of materials is tailored to the function of each section. The care centre has a more neutral, calming colour scheme, while the assisted living section is more exuberant, with vibrant red, yellow and green among its colours.
Speed as an asset
The construction of residential care centre Pitthem was completed within a very short period. The total lead time, from land development, demolition of the existing buildings and site preparation through to the planning permit application and opening, was around twenty months. The first residents had even moved in three months earlier. “Despite the coronavirus pandemic, we managed to meet the planned completion date,” says Herman Bernaerts. “That includes obtaining all the necessary certificates and approvals, from the fire brigade and Inter to the Agency for Care and Health. This is mainly thanks to the fact that we modelled everything in BIM. And I mean everything: even the technical rooms, washbasins and toilet grab rails.”

GF Solids, bespoke washbasins
In a residential care centre, the importance of hygiene goes without saying. Designing a sanitary worktop to meet the strict standards of the care sector may seem straightforward, but not every design is equally easy to use and maintain. Based on a design by GC-Architecten, GF Solids, known for its extensive expertise in solid surface materials, developed a bathroom unit in which the various components flow seamlessly into one another. “Especially in times of COVID-19, this is essential to prevent bacteria from building up,” says Filip Geuns of GF Solids. The washbasins for the assisted living apartments and residential care rooms were all made to measure. “Kerrock is ideal for applications in the care and medical sectors. The basin is made using a press mould in a thermoforming process. It is then bonded to the top surface and sanded, leaving no seams,” explains Filip Geuns. The washbasins are designed to allow wheelchair users to roll underneath them, and the towel rail also serves as a grab rail to help users stand up. “Thanks to our close collaboration with main contractor ibens, we were well coordinated and installation went smoothly. We have plenty of experience with this type of project. We have also previously worked in residential care centres in Ardooie and Hulshout.”
Another important consideration was the choice of prefabrication. Herman Bernaerts explains: “The building was assembled entirely using a precast concrete structure. First the shell, followed by the dry internal fit-out, which was fully customised.” This approach made the design particularly flexible, as the process was divided into stages. While the shell structure was being erected, the architect could further refine the internal layout to meet Aldea and Orpea’s requirements. By building everything virtually in BIM, the physical construction process was ultimately shorter.
One interesting detail is that ibens prides itself on always building a full-scale mock-up room on site. This allows all the parties involved, including the nursing and care staff, to see exactly what a room with an en-suite bathroom will look like. “Even when you model everything in BIM, you still learn something new each time. For example, you find out that it’s not so easy to reach the light switch from your bed. That’s harder to spot in BIM,” says Herman Bernaerts. Guido Callens agrees: “And it was good that making changes to those things in BIM didn’t immediately put everything at risk.”
Question about this story? Ask your question
Who worked on it
Woonzorgcentrum Pitthem in Pittem
- main contractoribens nv
- architectGC-Architecten
- clientAldea
- wastafels op maatGF Solids
Keep following this
Get an email when a new story is published. No account needed.
- ProjectWoonzorgcentrum Pitthem
- SubjectHealthcare projects
- Companyibens nv
- CompanyGC-Architecten
- CompanyAldea
- CompanyGF Solids