150 new residential units, a wide range of support services and a 40-metre tower: ambition is certainly not in short supply at the Klein Veldekens site in Geel. Yet the scale and imposing appearance of the complex do not prevent it from placing maximum emphasis on small-scale living, with the care aspect almost ‘invisible’. Another notable feature is that the project applies a number of circular principles, and both the tower volume and the adjoining cube have a hybrid structure: a combination of concrete and CLT timber. This makes the lofty Astor tower the tallest hybrid building in the country.

The tower volume has a hybrid structure.

In March 2013, Flemish Minister Jo Vandeurzen and then Flemish Government Architect Peter Swinnen selected five pilot projects intended to give care a fully fledged place in the urban environment once again. Klein Veldekens was one of those selected, thanks to the forward-thinking residential care
philosophy of Astor vzw, which abandoned the traditional ‘care home model’ in favour of an integrated concept centred on inclusion and bringing together different forms of care. “Residents are guaranteed that, regardless of their care needs and in line with their own routines and habits, they can remain in their home for life,” says Karianne Paesschen of osar architects, who was responsible for the design. “We have integrated the assisted living and group homes into a pleasant, small-
scale, homely environment. The care aspect is there, but it is almost invisible. If necessary, the assisted living apartments can be designated as residential care rooms. The group homes are adapted to people with complex medical needs. Residents can decide for themselves whether or not they want to continue living in the same place as they get older. Moving to a group home in the same building is also an option. Older people are therefore in control of their own future, which makes a big difference emotionally. This makes the move to a residential care setting easier to accept.”

The building façades are finished with render.

A considered choice of high-rise construction

Klein Veldekens is less than half a kilometre from Geel town centre and has 150 residential units, including many one- and two-bedroom assisted living apartments, with or without a residential care home designation and additional support. Six small-scale group homes have also been built: five for eight people and one for twelve. The homes are spread across three buildings: a tower block with eleven floors (block A), an adjoining three-storey cube (block B) and a separate ‘link building’ ranging from two to four storeys (block S). Ground-level garden homes will also be added at a later stage. This diverse range of accommodation is complemented by support services on the ground floors: a service centre, brasserie, wellness centre offering pedicures and manicures, hairdresser, two day care centres and a childcare
centre. A large underground car park keeps traffic on the site to a minimum. Klein Veldekens also borders the MPI Oosterlo site (32 residential units), which is also part of the pilot project.

The number of storeys in the link building gradually decreases to ensure a gentler transition to the surrounding homes.

The undisputed focal point of Klein Veldekens is the Astor tower. The choice of a high-rise building may seem unusual for the area at first glance, but there are good reasons for it, assures Karianne Paesschen: “For example, it allowed us to maximise the surrounding green space. Another
advantage is that it avoids the creation of corridors, which benefits the residential experience, the small-scale homely atmosphere and residents’ sense of orientation. The magnificent views are an added bonus, of course. We did our utmost to integrate the tower into its surroundings as effectively as possible. For example, the number of storeys in the nearby link building decreases in stages to ensure a gentler transition to the ground-level garden homes.”   

The Astor tower is 40 metres high.

Hybrid structure

Klein Veldekens is innovative not only in its residential care philosophy, but also in its construction method. “The tower volume and adjoining cube have a hybrid structure: load-bearing columns and a precast concrete stair and lift core provide the structural flexibility needed for any future alterations, combined with CLT floors and walls from the first floor upwards. The structure comprises glued laminated beams supporting 13 cm-thick CLT floor panels, and non-load-bearing external walls resting on L-shaped steel sections cast into the concrete columns. The link building, by contrast, has a traditional structure using calcium silicate blocks and precast concrete floor units. The building façades are finished with render,” says Pieter Embrechts, project manager at main contractor Hooyberghs.   

“The choice of CLT, along with a range of other environmentally friendly materials, is part of our circular ambitions,” explains Karianne Paesschen. “The timber structure can be dismantled and recycled if necessary, but the buildings can just as easily be given a different function. We have also signed a ‘light as a service’ contract to ‘lease’ the lighting systems, another fundamental circular principle. Klein Veldekens is also forward-thinking in terms of energy. A BEO field has been installed to provide cooling for the brasserie and group homes, and solar collectors have been fitted on the roof.”   

Valuable pioneering work

A high-rise building in CLT: a first that required genuine pioneering work. “Although we had previously built residential care centres in CLT and are currently working on two other CLT projects in Haacht and Zeebrugge, the Astor tower was something special,” says Pieter Embrechts. “The lack of clearly defined standards and completed examples brought its share of challenges, particularly in terms of acoustics (lack of mass) and fire safety (meeting the required reaction-to-fire classification was no easy task). A great many complex details had to be worked out to ensure that all the pieces fitted into place from a fire safety and structural stability perspective, as we also had to take account of the enormous wind load, which had to be transferred through the floor elements. It was also no easy task to align the precast concrete elements and CNC-milled CLT elements neatly on site. Despite this, assembly proceeded very quickly. Each floor took an average of just ten working days. It is immensely satisfying to have been involved in designing and building such an innovative building. It has given us valuable experience that will serve us very well in future projects. The complexity, the level of detail, the ongoing search for inventive solutions… it was all a tremendous learning experience! We are also very proud to have worked with eight sister companies of B&R Bouwgroep on this landmark project. That synergy certainly paid off.”

There is also a sense of pride and satisfaction at osar architects. “It has been a long process, but we are immensely proud of the end result. We are also fortunate to have a client with such a forward-thinking vision. We can see that the first residents feel at home in their new accommodation straight away, so there can be no better compliment. Mission accomplished!”  

Question about this story? Ask your question

Wie aan Klein Veldekens werkte

  1. architectosar architectsIn this story
  2. main contractorHooyberghsIn this story
  3. installatie van de techniekenBelcotecMentioned in Ingenious HVAC concept reduces environmental footprint
  4. engineering consultancyIngeniumMentioned in Ingenious HVAC concept reduces environmental footprint

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectKlein Veldekens
  • SubjectHealthcare projects
  • Companyosar architects
  • CompanyHooyberghs
Share this article

Follow Bouwen aan Vlaanderen

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.