Healthcare projects

Extensive use of timber defines care campus

Op het moment van afwerking was zorgcampus Sint-Jozef het grootste CLT-project in België.
Op het moment van afwerking was zorgcampus Sint-Jozef het grootste CLT-project in België.

Campus Sint-Jozef in the Rozemaai district of Ekeren, a sub-municipality of Antwerp, is a recent project that not only offers a comprehensive range of care services, but is also highly innovative as a building. The entire structure is built in CLT, with the timber contributing as much as possible to creating a soft, warm atmosphere.

The CLT timber comes from sustainably managed forests, as confirmed by an eco-certificate. In this case, the timber comes from Austrian forests.

The campus offers a varied range of services for children and young people with physical and/or mental disabilities. It houses a primary school for 158 pupils (Het Sas), a secondary school for 130 pupils (De Tjalk) providing special education, and a care facility (Heder). The care facility comprises a rehabilitation centre, a gait laboratory, a residential facility, a specialist childcare centre and day care. These services were previously based slightly further south, in the Luchtbal district. They could no longer operate properly there because of the proximity of the works on, and later the traffic on, the new link between the two banks of the River Scheldt in Antwerp.

Belgium’s largest CLT building

The most striking constructional feature of the new campus is that it is built using cross-laminated timber, or CLT. This is not unique in Belgium, but its use is only now really taking off. “This was my first experience with CLT,” says project manager Wim Cox of contractor Van Roey. The construction company had already completed several CLT projects. “But Care Campus Sint-Jozef is the largest one to date.”

The client and architect chose CLT as the dominant building material for more than one reason. Elsewhere, sustainability is the deciding factor. Timber from ecologically responsible forests is not only a renewable material, it also stores a great deal of carbon and has excellent thermal insulation properties. At this care campus, the fact that timber creates a soft, warm atmosphere and can positively influence the children’s behaviour was also a key consideration. It has therefore been used in a way that keeps it highly visible. CLT is used not only for the load-bearing structure, but also as much as possible in the finishes. By making, among other things, the classroom walls non-structural, the building also retains a high degree of flexibility.

The design allows for a future connection to the district heating network planned in this part of Ekeren by the City of Antwerp and network operator Fluvius.

BIM is indispensable

As timber is a lightweight material, additional measures were needed to resist wind loads. “We therefore installed ground anchors. These also improve vertical stability. The green roofs, solar panels, rooftop plant room and floor build-ups also add weight.”   

The brick-built plant rooms housing, among other things, the high- and low-voltage switchboards, the concrete lift shafts and the raised steel-deck concrete playground are the only parts of the building not made of timber. “The choice of materials has a major impact on the way we work,” Cox explains. “Especially in a building of this size. More than three thousand slots and holes had to be made in advance, in precise locations, for items such as sockets, light fittings and pipes. BIM is indispensable for preventing clashes between the various finishes. All the parties involved can add their work to the same model. Even then, one of the thousands of details will ultimately need to be adjusted on site. Fortunately, CLT is flexible enough to allow an additional hole to be drilled or an unnecessary or wrongly positioned opening to be filled in invisibly.”

The compact layout, with modular volumes grouped around a number of courtyards, gives the campus the structure it needs.

A tight schedule

“For the first four to five months, apart from the foundations, we worked almost exclusively on the BIM model. This was followed by six months in which we did little else on site but assemble CLT elements. On average, two lorries delivered timber each day, amounting to 4,428 tonnes, or 5,400 m³ of CLT. Organising this was a major challenge, partly because of the changeable weather during this short period. We had a total of eighteen months from starting work to completion. That is a very tight schedule for a building with a floor area of 23,500 m². The high degree of prefabrication partly turned the construction process into a logistical assembly operation. This resulted in a much shorter build time and considerably lower costs arising from construction errors.”

The architects at Bovenbouw Architectuur made a great effort to ensure that the building fitted in with its surroundings. Their design is inspired by a monastery layout. The building is sited in the north-westernmost part of the plot, where noise from the nearby A12 motorway is lowest and air quality is best. The bedrooms are located as far as possible from the motorway.

CLT can be used for floors and walls as well as load-bearing elements.

Harmony with the surroundings

The compact layout, with modular volumes grouped around a number of courtyards, gives the campus the structure it needs. A parking avenue with four parallel rows of trees alongside the motorway screens the road noise. It also creates a pleasant acoustic environment in the sheltered courtyards. These and the other newly planted avenues follow the sightlines in the surrounding area, creating new landscape spaces.

Each wing has its own entrance, so users and visitors do not experience the scale of the campus as overwhelming. The uniform façade cladding makes the different entities feel like a coherent whole. The unity of the care campus is further emphasised subtly by the use of the same earthy colour palette, which avoids a clinical feel.   

Question about this story? Ask your question

Who worked on it

Zorgcampus Sint-Jozef in Antwerpen

  1. ClientDVC Sint-Jozef en Centraal Katholiek Schoolbestuur
  2. architectBovenbouw Architectuur
  3. main contractorVan Roey
  4. CLT-panelenCLT-S
  5. Practical follow-up on the construction siteIngenieursbureau BOTEC

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectZorgcampus Sint-Jozef
  • SubjectHealthcare projects
  • CompanyDVC Sint-Jozef en Centraal Katholiek Schoolbestuur
  • CompanyBovenbouw Architectuur
  • CompanyVan Roey
  • CompanyCLT-S
  • CompanyIngenieursbureau BOTEC
Share this article

Follow Bouwen aan Vlaanderen

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.