From Borgerstein to Borgerwijk

The historic estate in Sint-Katelijne-Waver, where vzw Borgerstein was founded, is being transformed into an open, welcoming green neighbourhood. Care remains at its heart, but the area will also provide space for living, working and leisure. The finishing touches are currently being made to phase 1, which comprises the construction of four buildings. Although their designs differ considerably, they come together to form a complementary whole. This is the result of carefully considered architecture, built around the use of the same materials and a unifying canopy structure.

The site on Kapelweg in Sint-Katelijne-Waver has a rich history. Until 1965, it was home to priests in training. After standing empty for several years, Sint-Jozefseminarie was bought and renovated by vzw Borgerstein, which turned it into a care centre for older people and people with learning disabilities. This marked the start of a success story: today, Borgerstein employs 600 people across several sites. As the organisation continued to grow, it decided in 2017 to invest in additional accommodation for older people and people with disabilities. The aim was to create a diverse residential environment where people in need of care could live in harmony with others. To make this happen, the non-profit organisation formed a partnership with development company Bergesteyn and the temporary association CORES Development, Vanhout Projects. The care facilities, comprising four buildings and funded by Borgerstein itself, will soon be handed over. Construction of an apartment complex has since begun.

Four buildings, one whole
The largest and most prominent building is a 7,900 m² care home, with its 120 rooms spread over three storeys. To the left is the beating heart of the campus: a three-storey building housing the administration, reception, main kitchen and laundry. Behind it are two smaller buildings, with three and two storeys respectively, for people with learning or physical disabilities. “What’s interesting is that each building has a form specifically tailored to its residents,” says Zeger Nys, one of the project managers at Vanhout, the main contractor delivering the Borgerstein site works from start to finish. “This also makes the most of the site’s area and has resulted in a smooth circulation plan. The four buildings are also linked by a canopy structure integrated into the landscaping. This creates visual uniformity, further reinforced by the façade materials. Brickwork in light yellow and beige brick, together with white fair-faced concrete blocks, is interspersed with white façade render and Thermowood cladding.”



A sustainable project
The structure of the four buildings consists largely of prefabricated elements: calcium silicate block walls, precast sandwich panels, prestressed hollow-core slabs … Only the rooftop plant rooms have a steel frame, finished with profiled steel sheeting laid to a fall. “The decision to use as much off-site prefabrication as possible enabled us to complete the project very quickly,” says Zeger Nys. “We began preparations in August 2019 and hope to hand over the project by the end of September 2021. This meets the client’s request to make use of the investment as soon as possible. Another requirement was to build for energy efficiency, which we achieved through a combination of high-performance insulation, a BEO field and PV panels. The Borgerstein site has certainly been a challenge, given its complexity, tight schedule and the fact that four buildings had to be completed almost simultaneously on a relatively small site.”
All-Archeo: Archaeological investigation
During the renovation and extension of Borgerstein, an administrative requirement ultimately led to an extensive archaeological investigation. “The archaeological assessment required for a planning permit showed that the site had archaeological potential,” says Natasja Reyns, managing director of All-Archeo (Bornem). “We were commissioned to carry out a landscape survey using auger drilling and trial trenches. This led us to the remains of a medieval longhouse farmstead.” Excavations had to be carried out before work could begin. All-Archeo uncovered remains dating from both the medieval period and the Metal Ages. “These findings tie in with previously known archaeological remains in the area,” explains Natasja Reyns. “Our unique discoveries help us gain a better understanding of past human occupation in the region. That is what makes our work so valuable. Needless to say, we are delighted to have been entrusted with this project and to have been able to substantiate the findings of the archaeological assessment.”


Metifix: Blower door tests
Care buildings contain many more technical pipes and ducts passing through the airtight envelope than, say, schools or office complexes. They also have proportionally more accessible external doors. This makes it far from straightforward to achieve good airtightness results. Nevertheless, this was a key consideration in the construction of the four buildings at the Borgerstein site. Metifix was therefore brought in to carry out blower door tests. “After focusing on EPB reporting for ten years under the name EPB Lipa, we decided to broaden our focus in 2019,” say managing directors Patrick Brants and Lien Van Droogenbroeck. “Since then, we have operated as Metifix, a company specialising in airtightness and thermographic measurements.” Borgerstein has performed exceptionally well in the blower door tests. “Results of around v50=2m³/hm² can be considered excellent. The ambition to deliver NZEB buildings has therefore certainly been achieved in terms of airtightness,” conclude Metifix’s managing directors.
Elektriciteitswerken Gielen: Electrical installations
A key challenge on the Borgerstein project was adapting the electrical works to the different user groups across the four buildings. Having to install and connect the systems in phases made the task even more challenging. The project therefore called for a company with the right expertise and experience. The contract was awarded to Elektriciteitswerken Gielen, a medium-sized building services contractor from Lommel. “Hard work combined with craftsmanship, a no-nonsense attitude, good organisation and quality results have made our company what it is today,” says project manager Gunther Luyckx. “A very good price-quality ratio is also a hallmark of our business. With a team of around 40 people, we focus mainly on public-sector contracts. We have completed many interesting projects, but Borgerstein tops them all in terms of scale and complexity. Thanks to intensive meetings, weekly lean planning, good communication between all parties and the commitment of the entire construction team, we successfully delivered on our mission, within the agreed deadline and budget.”
Vossal: Aluminium joinery
The aluminium joinery completes Borgerstein’s architectural picture, thanks in particular to its high-quality execution and attention to detail. This fine example of craftsmanship is the work of Vossal, a family-run business from Beerse that has specialised in aluminium windows, doors and curtain walling since 1978. “We still work in the domestic market, but also take on larger projects, such as a recent new-build for UZ Antwerpen, the De Heern apartment complex in Herentals, City Campus in Anderlecht and, of course, Borgerstein in Sint-Katelijne-Waver,” says director Hans Eysermans. “Here we were able to showcase all our expertise: we manufactured and installed 3,600 m² of external joinery in the form of aluminium windows, doors and curtain walling, including 21 roller shutters and 314 solar-control screens. The biggest challenge was coordinating all the joinery details with the sheet metal work, façade cladding and solar shading. But thanks to thorough preparation, detailed drawings and close collaboration with the main contractor, everything went smoothly.”
Question about this story? Ask your question
Who worked on it
Borgerwijk in Sint-Katelijne-Waver, transformatie
- main contractorVanhout
- ontwikkelingsmaatschappijBergesteyn
- tijdelijke verenigingCORES Development: Vanhout Projects
- archaeological investigationAll-Archeo
- blowerdoortestenMetifix
- electrical installationsElektriciteitswerken Gielen
- aluminium windows and doorsVossal
Keep following this
Get an email when a new story is published. No account needed.
- ProjectBorgerwijk
- SubjectHealthcare projects
- CompanyVanhout
- CompanyBergesteyn
- CompanyCORES Development – Vanhout Projects
- CompanyAll-Archeo
- CompanyMetifix