From coach house to sustainable care centre

The former castle estate in Sint-Ulriks-Kapelle is being transformed into a care campus unlike any other. The existing buildings and green setting are ideally suited to an integrated approach to residential care, with links to the local community and other generations at its heart. Following the castle, the coach house is now also being converted and extended to create a small-scale, near-zero-energy care home for people with dementia.

The picturesque village centre of Sint-Ulrikskapelle is defined to a large extent by the former castle estate, which is now a protected site and covers an area of 10 hectares. In addition to the country house, it comprises a farm, an almoner’s house and several outbuildings. One of these, the coach house known as ‘Gaudium’, is soon to be given a new purpose. “The project is part of a masterplan to convert the estate into a care campus,” says Jurgen Voorspoels, project manager at PIT Antwerpen, the construction company carrying out the transformation. “ ‘Gaudium’ will have nine fully equipped care rooms and several communal areas.”

Renovation and new build
The coach house is undergoing a thorough makeover. The front section is being extensively renovated, with only the protected façades retained. “We poured a new concrete slab on the ground and added a timber-frame storey,” says Jurgen Voorspoels. “We also renewed the roof and all the joinery. The new-build section was a little more complex because the client wanted a basement. We therefore first excavated a 3.6-metre-deep construction pit. This was no easy task, as it was right next to the section being renovated and there was a real risk of collapse. As you would expect, we finished the basement with concrete foundation slabs and walls. We then installed a floor of precast concrete floor units, before erecting the ground and first floors using timber-frame construction.”

The adjoining barn has also been renovated and now serves as the beating heart of ‘Gaudium’. “All the building services are housed there, including the water treatment system, the emergency generator and the transformer room for the electricity supply,” explains Jurgen Voorspoels. “We also upgraded the existing high-voltage substation at the park entrance and connected it underground to the transformer in the technical building.”

Near-zero energy
With an E-level of 51 for the new-build section and 57 for the renovated section, ‘Gaudium’ is an exceptionally energy-efficient facility. This is partly down to the extensive insulation and carefully considered design. On-site energy generation, using a vertical BEO field and solar panels/solar thermal collectors, also plays a crucial role.

Coordinating this entire package was a challenge in itself, but PIT Antwerpen also had several other obstacles to overcome. “The castle’s existing sewer ran through the area where the new basement had to be built,” says Jurgen Voorspoels. “To ensure drainage from the care home, we had to reroute it during the works. Another tricky issue was connecting the upgraded high-voltage substation, as we wanted to avoid leaving the care home without electricity for too long. It was also no easy task to connect all the new pipes to the other buildings. As there was no plan showing the existing layout, we had to trace the pipes across the entire estate using a ground-penetrating camera.”
PROJECT DETAILS
Client
WZC De Verlosser (Sint-Ulriks-Kapelle)
Architect
Plusoffice Architects (Brussels)
Main contractor(s)
PIT Antwerpen (Kapellen)
Een zakelijke vraag aan PIT Antwerpen NV? Get in touch
Who worked on it
Gaudium in Dilbeek
- main contractor
PIT Antwerpen - clientWZC De Verlosser
- architectPlusoffice Architects
Keep following this
Get an email when a new story is published. No account needed.
- ProjectGaudium
- SubjectHealthcare projects
- CompanyPIT Antwerpen NV
- CompanyWZC De Verlosser
- CompanyPlusoffice Architects