Healthcare projects

Green living for life in the city

De kenmerkende voorbouw met zijn gele steen, witsteengevelelementen en typerende fronton is behouden.
De kenmerkende voorbouw met zijn gele steen, witsteengevelelementen en typerende fronton is behouden.

Conversion projects are proving popular. For many people, the idea of living in complete comfort in a place steeped in history is highly appealing.

Parkresidentie Institut Moderne in Ghent offers a few additional benefits. All 61 accredited assisted living flats have been built on the principle of ‘living for life’, and residents can enjoy a wide range of services. What is more, the complex gives urban living a completely new dimension, as it is set in a beautiful park.

Institut Moderne pour les Malades was built as a hospital in 1910. To this day, it remains one of the grandest buildings on Koningin Fabiolalaan in Ghent. Yet things could have turned out very differently. After the last clinical activities moved to another site in 2014, the building quickly fell into disrepair. Project developer Institut Moderne Development was determined not to let this rich piece of history disappear and decided to invest in a unique conversion project. “Young families,
people aged 50 and over or active seniors: there’s something for everyone at Institut Moderne,” says Wim Brondeel, project director at general contractor Vandenbussche NV, based in Aalter, which delivered the project. “Thanks to the ingenious design, the age at which residents move into the flats is irrelevant. The beauty of this concept is that the assisted living flats, designed for lifelong living, adapt to residents’ needs and age. This is further enhanced by a wide range of services offered ‘à la carte’. These include housing support, a 24-hour presence, home nursing and meal delivery, as well as childcare, parenting support and ironing and laundry services.”

The assisted living flats, designed for lifelong living, adapt to residents’ needs and age.

Old and new come together

The new ‘Institut Moderne’ has a floor area of around 6,800 m², spread over four storeys. There is also an underground level containing a car park, bicycle storage and technical rooms. The residential complex comprises 61 accredited assisted living flats and an attractive communal space with a bar. “The distinctive front section, with its yellow brick, white stone façade elements and characteristic pediment, has been retained,” says Wim Brondeel. “Behind it, a façade unfolds, constructed from facing bricks combined with architectural concrete elements, aluminium cladding and Tectiva panel cladding. A large glazed curtain wall connects the different sections of the façade.”

A contractor with a winning formula

As mentioned, the entire project was delivered by Vandenbussche of Aalter. This recognised Class 8 contractor is ideally placed to bring projects of this kind to a successful conclusion. “We stand out through our no-nonsense approach, clear long-term vision and expertise in both renovation and new-build,” explains Wim Brondeel. “Quality, safety and taking the burden off our clients are central to our business philosophy. We listen to our clients and consistently seek the best solution through our ‘Wij trekken uw plan’ approach. This evidently goes down well, as we recently received the Belgium Best Managed Company 2020 Award.” 

Institut Moderne gives urban living a completely new dimension, thanks to its setting in a beautiful park.

From A to Z

Vandenbussche also took care of everything at Institut Moderne. “We were responsible for the entire project, including strip-out, structural work, finishes, building services and landscaping. We also handled client liaison,” says Wim Blondeel. “The façades of the front section were sandblasted. Once the supports had been installed, the entire volume was stripped out, including the intermediate floors and load-bearing elements. Following this delicate process, we built a completely new structural frame. This was necessary to allow for several storeys in the new section and to anchor everything to the old façades. The new underground car park also presented its share of challenges, particularly because the excavation was right next to the existing building. Finally, most of the park landscaping was completed before construction began. Our aim was to have the planting fully established by the time the project was handed over. Unfortunately, this decision caused some logistical difficulties. On the plus side, we were able to use the water pumped out during basement dewatering to irrigate the park and replenish its groundwater. Institut Moderne was certainly a project that called for considerable creativity, expertise and perseverance from our people. The result speaks for itself. Thanks to Institut Moderne Development, Ghent now has a truly unique residential concept.”    

TECHNICAL SPECIFICATIONS

Client Institut Moderne Development (Anderlecht)

Architect El Architects (Knokke-Heist)

Main contractor(s) Vandenbussche (Aalter)

Question about this story? Ask your question

Who worked on it

Parkresidentie Institut Moderne in Gent

  1. clientInstitut Moderne Development
  2. architectEl Architects
  3. main contractorVandenbussche

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectParkresidentie Institut Moderne
  • SubjectHealthcare projects
  • CompanyInstitut Moderne Development
  • CompanyEl Architects
  • CompanyVandenbussche
Share this article

Follow Bouwen aan Vlaanderen

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.