Lommel, WZC De Bekelaar | A brand-new home for Lommel’s senior citizens

A new building has risen in recent months behind the former De Bekelaar residential care centre, which had seen better days. From 2020, it will take over all the functions of the existing building. Initially, De Bekelaar 2.0 will accommodate 90 residents, but in a second phase capacity will increase to as many as 120. The ground floor also houses a hair salon, cafeteria, commercial kitchen, physiotherapy rooms, multipurpose halls, and a number of logistical facilities and offices.
Residential care centre ‘De Bekelaar’ opened in 2007 in the former hospital building on Kliniekstraat in Lommel. It soon grew into a complex with 75 residential units and three short-stay places, but it quickly became clear that a new residential care centre was needed to meet the current and future needs of senior citizens. M4 architecten en ingenieurs designed a building that brings together a range of shared facilities on the ground floor. The first and second floors accommodate three wings, each with fifteen rooms.

The facing brickwork was laid using through-coloured pointing mortar.
Traditional construction
Cordeel expertly translated the architectural concept into a practical design. “The new residential care centre has a traditional construction,” explains project manager Rudi Bloemen. “The inner leaf of the cavity wall and the load-bearing walls are made of concrete blocks. The floors consist of prestressed hollow-core slabs and wide floor slabs, while the roof structure combines lightweight sloping concrete with EPS insulation boards, finished with bituminous roofing. The facing brickwork was laid using through-coloured pointing mortar, and the external joinery is aluminium. The floors in the rooms and corridors are covered with PVC, while the offices and kitchen have ceramic tiles (60*60).”

“From a construction point of view, it was fairly standard, although the central section did present a challenge,” says project manager Rudi Bloemen.
The walls of the en-suite bathroom pods in the rooms are finished externally in HPL on plywood and internally in solid-grade laminate. To create extra space, the double sliding door is integrated into the wall, while the Sanblocks in the bathrooms are built into the masonry walls and then given a fire-resistant finish. “From a construction point of view, it was fairly standard, although the central section did present a challenge. The combination of eight sloping round columns and steel sections encased in concrete required extra attention.”

The first and second floors accommodate three wings, each with fifteen rooms.
Technical improvements
The building is heated by gas condensing boilers, which supply conventional radiators. A type C ventilation system in the rooms and a type D ventilation system in the staff areas also contribute to indoor comfort. Cooling is also provided in the multipurpose hall and several seating areas. “When the cooling system operates in summer, we do not simply waste the heat it extracts, but recover it to preheat the domestic hot water. Since the project got under way in 2013, we can certainly call this system quite progressive,” says Wim Dieltjens, project manager at engineering consultancy boydens engineering.

The light-coloured facing brick and pearlescent gold window frames and doors complement each other beautifully.
“Domestic hot water is also an important consideration in residential care centres. Residents must have access to hot water immediately, but the flip side is that the hot-water circuit has to be kept constantly supplied. This heats the building, which is less desirable in summer. That is why we heat the water to only 45 °C, rather than 60 to 65 °C. Legionella is therefore controlled through chemical disinfection. This is a win-win situation: less heat loss in winter and less heat build-up in summer, combined with a lower energy bill. De Bekelaar is a building that is very straightforward to maintain. It is essentially a large house. Everything is dimensioned somewhat more generously, of course, but maintenance requirements are just as minimal. It goes without saying that the client greatly appreciates this.”
Een zakelijke vraag aan M4 architecten en ingenieurs? Get in touch
Who worked on it
De Bekelaar 2.0 in Hamont-Achel, nieuwbouw
- architect
M4 architecten en ingenieurs - engineering consultancyboydens engineering
Keep following this
Get an email when a new story is published. No account needed.
- ProjectDe Bekelaar 2.0
- SubjectHealthcare projects
- CompanyM4 architecten en ingenieurs
- Companyboydens engineering