Healthcare projects

Medical and technical building with subtle colour accents

Medical and technical building with subtle colour accents

At the end of last year, Iris Zuid Ziekenhuizen welcomed ‘New Tech’. The construction of this medical and technical building, which has taken the place of the old staff car park, forms part of the wider modernisation of the hospital campus in Elsene. From the earliest design stages, modularity and the ability to adapt the building to future developments were key priorities.

New Tech has around 10,900 m² of usable floor space spread over seven storeys. The new building houses an underground staff car park (level -2), a floor dedicated to logistics (level -1), a day surgery unit with four operating theatres (ground floor), an intensive care unit (first floor), an operating suite with four theatres (second floor) and a central sterilisation department. The fourth and top floor has not yet been assigned a specific use and can serve as a back-up in the meantime, making it easier to transform and modernise the existing buildings on the site.

sol-coule-zi8a4341-aa-kopieren

The artwork by Jeanet Hönig extends from the reception building to the day surgery unit, ensuring aesthetic continuity.

The complex was designed by Jean Massa and Guy Standaert, senior partners at ASSAR ARCHITECTS, and project architect David Bejaer. It is located within an urban block, with a massing that bridges the gap between the hospital and the adjoining detached houses. Construction of New Tech took five years. David Bejaer: “The aim was to minimise disruption to the OCMW buildings and local residents. That is why we kept interaction between the construction site and the hospital, which remained operational, to a minimum, in particular by postponing the construction of the necessary connections and passageways for as long as possible.” The new building is linked to the existing hospital blocks by two walkways.

De realisatie van de Science Tower is niet alleen een mijlpaal op onderzoeks- en onderwijsvlak, maar zet ook de toon voor de transformatie van de volledige universiteitscampus.

New Tech is fitted with a louvre façade to minimise overlooking as far as possible.

Freedom, flexibility and modularity

According to David Bejaer, who has worked on almost nothing but hospital projects since the start of his career sixteen years ago, modern hospitals increasingly need to be renovated to stay up to date, typically every five to ten years. It is therefore crucial to design the load-bearing structure so that technical challenges are not insurmountable and layouts can be varied. This is certainly the case at New Tech, where floor levels can easily be adapted. The façades have numerous window openings, in line with the current use of the different floors. They consist of a beam-and-column structure infilled with concrete blocks, which are in turn clad with insulation and render. Adding a few new windows later on will not cause too many difficulties. David Bejaer: “We used an external louvre façade, which not only provides solar shading and a visual filter, but also disrupts the interaction between the inside and outside. This was a deliberate choice to minimise overlooking as far as possible.”    

De nieuwbouw herbergt 44 labo’s, die zijn uitgerust met de allernieuwste technieken en onderzoeksapparatuur.

White and grey tones predominate inside the building, but there are also plenty of colour and wood accents.

Timeless character

White and grey tones predominate inside the building, but there are also plenty of colour and wood accents. The architects had a timeless look in mind. They involved users and staff in the design process and translated their state of mind into a range of specific shades, drawing on the positive psychological effects of a carefully considered colour scheme. For example, the focus on extreme hygiene in the operating theatres inspired a blue and purple motif. Green accents, combined with shades of yellow that suggest ‘quality’, in turn reflect the ‘hope’ of patients in the intensive care unit.

Art integration

The ground floor, which houses the day surgery unit, also has a colourful appearance. The floor there was given a complete makeover by an artist. David Bejaer: “When the reception building was inaugurated in 2010, we worked with Jeanet Hönig on the resin floors on the ground floor and in the cafeteria. We already had the idea then of reviving that ‘artistic partnership’ for the future extension. We gave Jeanet a few guidelines and told her what colours would be used for the other interior materials, but otherwise she was free to do as she pleased. Jeanet is an artist who embraces change. She soon came up with a fantastic concept, which was approved by the client without any problems.”

Now that the New Tech project has been completed, Iris Zuid Ziekenhuizen is preparing to modernise its other sites. The Healthcare division of ASSAR has meanwhile started two new projects in Ottignies. It will also soon complete an entirely new hospital in Liège (MontLégia). In addition, the practice is working hard to establish its Paris office through ASSAR-France.     

A business enquiry for Assar Architecten? Get in touch

Who worked on it

New Tech in Elsene

  1. architectASSAR

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectNew Tech
  • SubjectHealthcare projects
  • CompanyAssar Architecten
Share this article

Follow Bouwen aan Vlaanderen

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.