Healthcare projects

Step by step towards a new care home

Text Petra BroedersImage Wyckaert

De nieuwbouw sluit aan op een bestaand gebouw. Dit vergde specifieke veiligheidsmaatregelen.
De nieuwbouw sluit aan op een bestaand gebouw. Dit vergde specifieke veiligheidsmaatregelen.

At the Maria Middelares care campus in Rekkem, an outdated care home is making way for a modern, comfortable new building. No easy feat, as the construction site is literally among the residents. Thanks to meticulous phasing and close coordination, the care campus continued to operate seamlessly throughout the works.

The replacement building for WZC Maria Middelares in Rekkem is being delivered in phases over several years. The site originally comprised four interconnected buildings. One building, ‘Myrthe’, was retained, while the other three were demolished and replaced in phases. “The biggest challenge was undoubtedly the phasing,” says Bernard Gyselinck, project manager at Wyckaert, which was responsible for delivering the entire project: structural work, finishes and building services. “We couldn’t simply put up one large building. Residents had to remain living on campus throughout the works. That’s why we divided the project into two new-build phases.” 

In phase 1, the first building was demolished and a new block containing 37 resident rooms was built. This new block connects directly to the existing ‘Myrthe’ building. Once the residents had moved from the second building into the new wing, Wyckaert could demolish building 2 and begin phase 2: a new-build block with 58 additional rooms.

The façades are predominantly brick, with a small proportion finished in render.

Continuity and safety

Continuity of care had to be guaranteed throughout the process. “The existing buildings remained in use while we were working,” says Bernard Gyselinck. “We had to ensure that all utilities remained operational in the occupied areas. Only the connections serving the sections being demolished could be disconnected. The same applied to the drainage system.” 

Safety also required considerable attention. “The new-build blocks adjoined the existing buildings at several points. We devoted a great deal of attention to dust screens and measures to prevent fire spread. It was a real puzzle, and every step had to be carefully thought through.”

The buildings have full basements. As excavation had to be carried out alongside existing structures, an open excavation was not feasible. Wyckaert opted for a combination of Berlin-type retaining walls and secant pile walls to create a safe construction pit. 

The basement now houses the plant rooms and an industrial kitchen where fresh meals are prepared daily. The façades are predominantly brick, with a small proportion finished in render. These works were entrusted to long-standing partner Faderi.

Phase 2 involves the construction of a new-build block with 58 additional rooms.

Comfort comes first

The building has a modern ventilation system divided into several zones: resident rooms, communal areas and the cafeteria. A Televic nurse call system has also been installed, with call points at the bed, in the bathroom and in the sitting area. A wandering detection system provides extra safety in the unit for residents with dementia.

The rooms are heated using concrete core activation. The pipework was installed in the concrete floors during the structural phase and connected to a geothermal heat pump. “The system operates at a low temperature and distributes heat evenly through the concrete structure. It’s ideal in a care setting, where a constant indoor temperature is important,” says Bernard Gyselinck. “But it does require close coordination: for example, no more holes can be drilled into a concrete slab once the system is in place.” 

Wyckaert used lean planning to keep the long construction programme on track. “Because the work was phased, we couldn’t build continuously. We had to wait each time for a building to be vacated before we could demolish it. The works will have taken around five years in total, but we managed to make the most of that long lead time and meet all the deadlines,” concludes Bernard Gyselinck.    

The buildings have full basements. Wyckaert opted for a combination of Berlin-type retaining walls and secant pile walls to create a safe construction pit.

Faderi Belgium: façade insulation and finishes

Based in Melle, Faderi Belgium has specialised in façade insulation and rendering, timber cladding and brick slips for more than thirty years. The company works for both private clients and contractors delivering large construction projects. “The red gecko on our vans has become a familiar sight on building sites throughout Belgium,” says CEO Filipe Ribeiro. For the replacement building at Maria Middelares care home, Faderi was responsible for the insulation and façade rendering. “We installed insulation 19, 20 and 22 centimetres thick, fixed it with insulation anchors and finished it with a silicone resin render with a 1.5-millimetre grain. We added a plinth at the bottom.” The project was carried out in two phases. As the façade had to form a continuous whole, Faderi used a profile with an expansion joint to ensure a neat connection between the two phases. Ribeiro looks back on a constructive collaboration with main contractor Wyckaert. “If I’ve counted correctly, this is the fourteenth project we’ve completed together. Since our first collaboration in 2010, we’ve worked on many more sites, including Volvo Trucks in Oostakker, Stropkaai in Gent and 34 apartments in Beveren. We know each other inside out by now.”

TECHNICAL DETAILS

Client Patrivin Son (Lo-Reninge)
Architect DETOO Architects (Lochristi)
Main contractor Bouwonderneming Wyckaert (Gent)

Question about this story? Ask your question

Who worked on it

WZC Maria Middelares in Menen

  1. ClientCZD Sint-Vincentius (Lo-Reninge)
  2. ArchitectDe Vloed Architects (Destelbergen)
  3. main contractorBouwonderneming Wyckaert
  4. isolatie en gevelbepleisteringFaderi Belgium
  5. ClientPatrivin Son
  6. ArchitectDETOO Architects

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectWZC Maria Middelares
  • SubjectHealthcare projects
  • CompanyBouwonderneming Wyckaert
  • CompanyFaderi Belgium
  • CompanyPatrivin Son
  • CompanyDETOO Architects
Share this article

Follow Bouwen aan Vlaanderen

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.