Smart floor formwork combines safety and efficiency

Het principe van de innovatieve SKYMAX bekisting stoelt op compatibele onderdelen in verschillende materialen. Het resultaat is een bouwkit die mogelijkheden schept voor modulaire toepassingen die aan specifieke projectvereisten voldoen.
Het principe van de innovatieve SKYMAX bekisting stoelt op compatibele onderdelen in verschillende materialen. Het resultaat is een bouwkit die mogelijkheden schept voor modulaire toepassingen die aan specifieke projectvereisten voldoen.

New guidelines and regulations are making safety requirements on construction sites increasingly stringent. This also applies to floor formwork.

That is why formwork specialist PERI is introducing an innovative large-panel formwork system called SKYMAX. The new solution is designed to improve user safety and make the formwork process more efficient.

A safe working environment is extremely important. It keeps employees motivated and prevents projects from being disrupted by workplace accidents. “PERI takes steps during product development to prevent dangerous situations later on,” says Danny La Fors, Product Manager at PERI BeNeLux. “SKYMAX is a case in point. The system is assembled from the floor below, so there is no risk of falling. From that level, the panels are suspended from the prop heads, and workers push them horizontally into place using the formwork tool. The prop head is designed to lock the panel automatically so it cannot be lifted, even when the panels rotate upwards. The guardrails are also pushed upwards from below and lock into place automatically. This reduces the effort required and increases safety on site. Additional system-
components, such as column frames and special supports, make it safe and easy to form infill strips. This means the formwork can be walked on as soon as the work is complete.”

The SKYMAX system is remarkably easy to work with, thanks to the small number of different system components.

A simple system

PERI has also kept the number of system components to a minimum, making SKYMAX remarkably easy to work with. Toon Caers, Country Manager Belgium at PERI Benelux, says: “Only one type of head is needed for the formwork process, as it can be used flexibly in all directions, including at the edges and when changing the direction of the panels. Thanks to their carefully considered geometry, the heads can support the panels in any position. This makes SKYMAX flexible, simple and quick to use.”

With this in mind, PERI has also made the components very lightweight. The largest aluminium panel, with an area of 2 m², weighs no more than 32 kg. The polymer version weighs less than 30 kg. In addition, the handles in the side and longitudinal profiles make the panels more ergonomic and easier to use.

Flexible extension

Another advantage of SKYMAX is the system’s technical flexibility. Caers says: “You can combine the panels, prop heads and other system components in many different ways to design a layout tailored to your project. In future, you will be able to join SKYMAX panels together on site to create large table formwork units and attach additional panels directly to the SKYMAX table formwork. This will allow you to extend the entire system flexibly.”

Thanks to its low weight and ergonomic handling, SKYMAX can be assembled by just two people.

In no time

Whatever layout you choose, SKYMAX makes the construction process on site more efficient. This was demonstrated by tests PERI carried out on various sites across Europe, including in Prad am Stilfersjoch in South Tyrol. There, construction company Rainerbau GmbH built a hotel with an underground car park, a swimming pool and 86 rooms. According to the company’s owner, Rainer Klotz, the work went very smoothly: “Our workers quickly got the hang of forming and striking with SKYMAX. After a little help at the start, they were able to carry on by themselves. They formed and poured 1,000 m² of concrete in just five days.”

Two workers

As well as the user-friendly working method, the fast pace of construction was down to a number of smart features. For example, there is no longer any need to adjust the props one by one to the same height. Using a drop head minimises formwork time and allows for rapid, partial early striking. The panels and heads can then be used for the next section. This reduces the amount of equipment needed on site and cuts costs. “And because the whole process requires just two workers, you need fewer staff,” says Caers. “In short, SKYMAX is a great example of how safety and efficiency can go hand in hand on site.”    

Question about this story? Ask your question

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • SubjectProduct information
Share this article

Follow Bouwen aan Vlaanderen

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.