Roofing & façades

New warehouse gets an attractive façade

“Het feit dat we deze hele site prefab konden bouwen, beperkte het aantal transporten naar de werf aanzienlijk”, zegt Arne Roels.
“Het feit dat we deze hele site prefab konden bouwen, beperkte het aantal transporten naar de werf aanzienlijk”, zegt Arne Roels.

The Equans site in Hoboken has been completely redeveloped. The buildings provide space for offices, storage and assembly. The blank street-facing façade consists of concrete panels with integrated brick slips. A fine project by LG-Beton, which also supplied all the precast structural elements.

Architect and urban planner Koen Verhoeven, managing director of M3 architecten, drew up the masterplan for the redevelopment of the entire site. He also designed the Equans buildings. “The location of the storage building has several advantages. First, the building presents a solid façade to the street, giving it a uniform and much more attractive appearance. As the building will be used entirely for storage, there will be no noise nuisance for the neighbours. In fact, it acts as an acoustic buffer for the halls behind it, where assembly work takes place,” says Verhoeven. 

The logical choice: precast

The structure is made up of precast concrete elements. The outer envelope consists of concrete sandwich panels. Arne Roels of LG-Beton says: “Speed will always be a major factor for a company like Equans. Choosing precast is an obvious decision. It is a conventional structure, although there were a few additional considerations. For example, the storage building includes a mezzanine with a 12-metre span, which must support a working load of 2,400 kg/m². There is also a storage area for hazardous substances, which entails some additional requirements.”

 A more attractive solution was wanted for the street-facing façade. Arne Roels says: “While the polycarbonate cladding remains visible on the other buildings, here it is finished with expanded metal on the upper floor. The precast concrete walls on the lower floors are clad in brick slips in a random pattern, creating the effect of brickwork bonded with adhesive. The ground floor required particular attention. The brick slips were applied in LG-Beton’s production halls, which calls for a certain level of expertise. In addition, the individual elements had to be assembled on site after transport to form one continuous façade. The slips add considerably to the weight of the wall, and installation requires great precision.” 

The precast concrete walls on the lower floors are clad in brick slips in a random pattern, creating the effect of brickwork bonded with adhesive.

Much-needed reorganisation

Asked whether sustainability is also considered on projects like this, Arne Roels answers emphatically: “Absolutely. The building meets the strictest requirements for water collection and treatment. Both buildings also have green roofs. For several months now, we have also been working at LG-Beton on a blended cement with a lower environmental footprint. Being able to build this entire site using precast elements significantly reduced the number of deliveries to the site.”

At the site, Equans builds and assembles high-voltage substations for offshore wind farms. As the existing buildings were no longer suitable for modern industrial activities, a reorganisation became necessary. The new masterplan is being implemented over a five-year period. Once complete, there will be more storage space as well as additional office space for two hundred employees, who are currently based at another site. The reorganisation includes the demolition of a training workshop, a container park and a gas storage installation. The new ‘Yard’ storage building was built on the site of the training workshop. The project was completed in two phases. Arne Roels says: “Phase 1 mainly comprises offices, with a small amount of storage space. The second phase is primarily used for storage, apart from a number of service facilities such as showers, an office, a dining area and changing rooms.”   

Question about this story? Ask your question

Who worked on it

Yard in Hoboken

  1. geprefabriceerde structuurelementenLG-Beton
  2. architectM3 architecten

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectYard
  • SubjectRoofing & façades
  • CompanyLG-Beton
  • CompanyM3 architecten
Share this article

Follow Bouwen aan Vlaanderen

Follow