Brussels

Modelwijk: timber, glass and greenery

Text Kris VandekerckhoveImage PIT-EIFFAGE

De grootste uitdaging was dat de nieuwe structuren moesten worden gebouwd op het dak van een bestaand gebouw met een beperkte draagkracht.
De grootste uitdaging was dat de nieuwe structuren moesten worden gebouwd op het dak van een bestaand gebouw met een beperkte draagkracht.

Since 2006, the Modelwijk in Laken has been undergoing a major transformation. This strategic project focuses on improving housing, urban planning and the landscape, combining new-build construction with the extensive renovation of heritage buildings that are more than sixty years old. Gathering and correctly interpreting information about the existing building structures ‘en cours de route’ was the greatest construction challenge.

The library is heated by underfloor heating, which can be controlled by zone.

The construction of the new library and community centre on the Modelwijk site in Laken was an exceptional project in every respect. Both buildings have a glulam structure, topped by a roof upstand measuring 2 and 1 metre respectively, built using timber frame construction. The façades combine a larch timber curtain wall on the inside with aluminium profiles on the outside, with the vertical mullions finished with decorative afzelia fins. The roof upstands are also clad in afzelia. Grooves were milled at irregular intervals into the timber cladding boards, creating the impression of boards of varying widths. A shared entrance, comprising glass and a steel structure, was built between the two buildings. The extensive use of glass makes the whole complex visually transparent, in keeping with the concept of the Modelwijk’s original designers.

Grooves were milled at irregular intervals into the timber cladding boards, creating the impression of boards of varying widths.
Technically, the buildings meet current requirements, with a Category D ventilation system and a heat pump for each building.

Strengthening and greening

To provide more greenery for residents of the surrounding apartment blocks, both roofs were covered with green roofs. 

Hilde van der Burgt, junior project manager at PIT-EIFFAGE: “The biggest challenge was that the new structures had to be built on the roof of an existing building with limited load-bearing capacity. Extensive surveys were first carried out to assess the existing structure and determine the best way to strengthen it. Following consultation with various engineers and SECO, it was decided to strengthen the concrete slab from above with inverted beams, placing steel girders between the beams to support the new structure. Despite these measures, building further on the existing slab remained a challenge.”

A shared entrance, comprising glass and a steel structure, was built between the two buildings.

Circularity in practice

Technically, the buildings naturally meet current requirements, with a Category D ventilation system and a heat pump for each building. The library is heated by underfloor heating, which can be controlled by zone. In the community centre, trench heaters provide both heating and ventilation. To save energy, the lighting in all the toilet facilities and storage rooms is connected to motion sensors.

Hilde van der Burgt: “Securing all the pipes in the insulation screed to prevent them from floating, as well as installing floor-level elements such as convectors and floor sockets, made what appeared to be the straightforward installation of the building services a challenge.”

“Alongside the energy-efficient building services and the timber structure, we also applied circular principles in various ways during construction. For example, the kitchen wall tiles were replaced with ceramic slips left over from another project, while the blue limestone thresholds and some of the drainage system were reclaimed from earlier works. The floor build-up was also partly adapted with sustainability in mind: the polystyrene beads in the mortar are made from recycled packaging material. Both this levelling layer and the clay granule sub-base outdoors can be fully recycled and reused in the future,” concludes Hilde van der Burgt.    

Question about this story? Ask your question

Who worked on it

Bibliotheek en buurthuis Modelwijk in Brussel

  1. ClientDe Lakense Haard
  2. ArchitectB2Ai architects
  3. Architectczaar architecten
  4. Main contractorPIT-EIFFAGE

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectBibliotheek en buurthuis Modelwijk
  • SubjectBrussels
  • CompanyDe Lakense Haard
  • CompanyB2Ai architects
  • Companyczaar architecten
  • CompanyPIT-EIFFAGE
Share this article

Advertisement

Follow Bouwen aan Vlaanderen

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.