Leuven has gained another impressive residential complex this spring. The final touches were put to the Lolanden housing project in the sub-municipality of Kessel-Lo. Following the refurbishment of 122 flats in the first phase, including the creation of a neighbourhood centre, three new buildings were constructed in the second phase, providing 84 social housing units and a nursery. A textbook example of contemporary urban development and expert project management, made possible by the constructive collaboration between the client, the architect and the two main contractors.     

The new nursery, with 30 places and a partially covered outdoor play area, is a major asset for the significantly upgraded neighbourhood.

As in other Flemish cities, waiting lists for social housing in Leuven are very long. Social housing company Dijledal is therefore doing all it can to turn the tide. With the completion of Lolanden, the supply is once again larger and better in quality. After phase 1 was completed in 2017, the old Dijledal offices in the Casablanca neighbourhood recently made way for three new buildings accommodating both small and large families. The 84 homes have between one and four bedrooms. A nursery run by Zorg Leuven, renamed ‘Lololand’, was also established on the ground floor. Together with a newly laid-out square and several green spaces, including playgrounds and various meeting places, this new nursery, with 30 places and a partially covered outdoor play area, is a major asset for the significantly upgraded neighbourhood. The fact that the new residential complex is also highly sustainable, with features including a BEO field, PV panels, solar thermal collectors and rainwater collection, is the icing on the cake.

A nursery run by Zorg Leuven, renamed ‘Lololand’, was established on the ground floor.

An ideal opportunity

As in phase 1 of Lolanden, Dijledal called on LANDarchitecten and contractor Vanderstraeten, which formed a temporary joint venture with Bouwbedrijf Dethier for the occasion. “Vanderstraeten and Dethier had previously worked separately with both Dijledal and LANDarchitecten, and had already gained the necessary experience in delivering this type of project. Phase 2 of Lolanden was therefore an ideal opportunity for both parties to join forces,” says Jeroen De Mulder, project director at Vanderstraeten. “It was the first time we had worked together so closely. Naturally, it took a little time to find our feet, but we quickly got used to each other’s working methods and company cultures. Both Vanderstraeten and Dethier are construction companies that attach great importance to good, smooth and pleasant collaboration between all the parties involved, including when selecting subcontractors and providing aftercare. Relations between the two companies were therefore excellent, as they were with the rest of the project team. The construction of this second phase went like a dream.”

The façade combines facing brick and decorative render with exposed concrete elements.
The three new buildings provide 84 homes with between one and four bedrooms.

A successful approach

From a construction perspective, the three new buildings are fairly standard: a cast-in-situ concrete basement, solid construction using calcium silicate blocks and precast concrete floor slabs, non-load-bearing internal walls in gypsum blocks, tiled floors, and façades combining facing brick and decorative render with exposed concrete elements. The technical side of the project was slightly more complex, particularly because of the installation of the BEO field. “Since everything outside the boundaries of the site was public land, the geothermal boreholes had to be drilled beneath the buildings. This had quite an impact on the schedule and project workflow,” says Jeroen De Mulder. “Overall, the work went very well, although getting started was difficult because of rubble contamination in the subsoil. Together with some additional work, this caused a little delay. Fortunately, we were able to make up the time as the project progressed, thanks to the efforts of the construction team and the constructive attitude of the client and architect. We managed to complete phase 2 of Lolanden within the planned construction period. Once again, this proves that our joint approach has paid off. The complex is certainly architecturally impressive, but it is above all the outstanding collaboration that we will remember.”    

Question about this story? Ask your question

Who worked on it

Lolanden in Leuven, nieuwbouw

  1. clientDijledal
  2. architectLANDarchitecten
  3. main contractorTM Vanderstraeten-Dethier
  4. PV-installatieEnergreen

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectLolanden
  • SubjectFlemish Brabant
  • CompanyDijledal
  • CompanyLANDarchitecten
  • CompanyTM Vanderstraeten-Dethier
  • CompanyEnergreen
Share this article

Follow Bouwen aan Vlaanderen

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.