Education

A striking multi-purpose school building gives the village centre a new lease of life

Dat Academie Forum 11 sterk in het oog springt, is onder meer te danken aan de bijzondere architecturale vormgeving en de piekfijne afwerking.
Dat Academie Forum 11 sterk in het oog springt, is onder meer te danken aan de bijzondere architecturale vormgeving en de piekfijne afwerking.

The centre of Puurs has been undergoing a major transformation for several years. The central streets have been remodelled, and the creation of the renowned Dorpshart, a vibrant meeting place with shops and restaurants, has been a resounding success. But that was not all. A little further on, Academie Forum 11 was also built, a multi-purpose school building combining functionality, sustainability and architectural ingenuity. The high standard of finish and outstanding quality of construction complete the picture.

The ‘straightforward’ interiors showcase the logic of the structure, as illustrated by the coffered ceiling spanning the dance studio.

The construction of Academie Forum 11 is part of the ‘De tuinen van Puurs’ masterplan, which gives a high-quality purpose to the enclosed area between the densely built-up centre and the open landscape beyond. The municipal council called on the Flemish Government Architect, who launched an Open Call to find a suitable design team. plusofficearchitects, in collaboration with DELVA Landscape Architects, won the commission. They produced designs for several sub-projects, including CC Binder and Academie Forum 11. The latter building was constructed in its entirety by DCA and officially opened over the weekend of 13 to 15 May.

The exposed concrete walls in the sports hall are as much as 9 metres high.

Designed for a range of users

Academie Forum 11 grew out of a partnership between the municipal council of Puurs-Sint-Amands and Sjabi (the full name being Sint-Jan Berchmansinstituut). As a multi-purpose ‘community school’ building, it caters for a range of users and houses not only classrooms, but also a dance studio, an exhibition space for artworks and a large sports hall that takes up almost the entire second floor. During the day, the complex is occupied by Sjabi pupils, while outside school hours its various spaces are used by members of the Temse drawing academy, the Gemeentelijke Academie Woord & Muziek Boom, dance school Terpsichore and musical theatre group Carmina. This ensures maximum occupancy and optimal use. Academie Forum 11 is also highly progressive in terms of sustainability and energy efficiency. The toilets are flushed with reclaimed rainwater, solar panels on the roof generate green electricity, and the building is heated entirely by heat pumps. Its central location on the future Forum is another major asset. The building is close to the existing Sjabi buildings, the Kloostertuin, CC Binder and the sports and events hall, giving it a prominent place in the streetscape.

The self-supporting steel spiral staircase was delivered from the workshop in three sections and welded together on site.
The colourful, playfully designed staircase is highly inviting.
The unusual ceiling and its striking light fittings create a distinctive atmosphere.

Unique construction challenges

Academie Forum 11 certainly stands out thanks in part to its distinctive architecture and immaculate finish. The red-tinted concrete façade panels and large windows create visual rhythm and give the building a restrained, human scale. The stacked classrooms and sports facilities are integrated into their surroundings by a characteristic kink in the plinth. The ‘straightforward’ interiors showcase the logic of the structure, as illustrated by the coffered ceiling spanning the dance studio. There is no shortage of aesthetic appeal, although the project did bring some unique construction challenges. “For example, the exposed concrete walls in the sports hall are as much as 9 metres high. Their height and complex reinforcement made casting them in situ no easy task,” says Dominic Hermans, project manager at DCA. “The self-supporting steel spiral staircase is anchored into the concrete only at the top and bottom. It was delivered from the workshop in three sections and welded together on site. Formwork for the external escape staircase was also challenging because of its triangular column. We had to cast it one flight at a time, so it took nine weeks to complete. Finally, fixing the architectural concrete façade elements was a delicate job, especially given that each panel weighed an average of 6 tonnes.”    

Project manager Dominic Hermans: “From the outset, there was open dialogue and excellent cooperation between all the parties involved.”

Multidisciplinary synergy

Despite all this, DCA needed only a year and a half to complete the multi-purpose school building. The Covid-19 pandemic was no obstacle either, thanks to the considered approach and extensive expertise of this experienced Class 8 contractor. “We managed the entire project from A to Z, from demolishing the former buildings and preparing the project documentation to the final painting work,” explains Dominic Hermans. “This was made possible by the synergy between the various departments of our multidisciplinary construction company: our estimating department, our construction department, our expert site team … During the works, we held weekly internal meetings with all the departments involved to discuss the programme, safety, site staffing, issues requiring attention and so on. I was always the main point of contact for the municipal and school authorities. From the outset, there was open dialogue and excellent cooperation. Budgetary and construction-related concerns were raised straight away and addressed constructively. It was certainly not a one-way street. This paid off, because the result really is something to be proud of! Academie Forum 11 is a building that is functional, attractive and sustainable. It is quite unusual for a school to invest so heavily in quality finishes, high-grade materials and sustainable technologies. We can safely say the mission was accomplished!”    

The building is close to the existing Sjabi buildings, the Kloostertuin, CC Binder and the sports and events hall, giving it a prominent place in the streetscape.

Question about this story? Ask your question

Who worked on it

Academie Forum 11 in Puurs-Sint-Amands

  1. architectplusofficearchitects
  2. main contractorDCA
  3. paintingKoninckx Schilderwerken

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectAcademie Forum 11
  • SubjectEducation
  • Companyplusofficearchitects
  • CompanyDCA
  • CompanyKoninckx Schilderwerken
Share this article

Follow Bouwen aan Vlaanderen

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.