Close to UZ Gent and overlooking the water, ‘Billie’s Place’ has opened: a new student accommodation project with 88 student rooms. “With this initiative, we want to offer students the comfort they need at an affordable price,” says the project team, which paid close attention to energy efficiency and acoustic comfort.

“Multi-family housing and student accommodation are our core business. In recent years, we have expanded our offering to include office and industrial construction, as we have seen our projects become increasingly diverse and combine different functions. Billie’s Place is another example: in addition to student rooms, it also has a coaching room where students can get help with any questions they may have,” says Olivier De Meulemeester, architect and partner at a154 architecten. “For this student accommodation project, we started with a concept focused on a fast build, the most efficient possible layout and maximising the available floor space. To meet the tight schedule, we used prefabricated elements that we assembled on site. The student rooms and support functions, including the stairwells, lift shafts, sanitary units and communal kitchens, were grouped together in the building. We also created a physical separation between the day and night zones, with the day zone referring to the communal spaces and the night zone to the individual student rooms.”

A free hand in coordination
Gijs op ’t Roodt, project manager at Algemene Bouw Maes (part of Groep Van Roey, based in Rijkevorsel): “Our client, Alides REIM from Ghent, asked us to build 88 student rooms. The priority was to provide students with the comfort they need at a reasonable price, so they can enjoy a pleasant time at university. Billie’s Place was an open-book project with a budget cap, which meant we were responsible for preparing the initial quotation and coordinating the project overall. Alides gave us the freedom to approach subcontractors ourselves and decide whether or not to appoint them. The building’s roof is covered with solar panels. There are 96 in total, almost five times the number originally budgeted for. Together, they have a capacity of around 36,000 Wp. In the current energy climate, that is no luxury. As well as energy efficiency, acoustic comfort was also a key consideration. Of course, separating the day and night zones already does much to limit noise disturbance, but we also installed an intelligent ventilation system so that sound is not transmitted from one room to another through the ventilation.”

To let: move-in-ready student accommodation
The biggest challenge? Keeping track of everything, staying within the client’s budget and meeting the schedule. Billie’s Place was completed in just one year, including all demolition and excavation work, the structural work, painting and the installation of office furniture. “We even managed to put up the curtains within that timeframe,” laughs the project manager.
Question about this story? Ask your question
Who worked on it
Billie’s Place in Gent
- clientAlides REIM
- Architecta154 architecten
- main contractorAlgemene Bouw Maes
- building servicesInnotech
- engineering consultancyExergie
- gasketelsACV
Keep following this
Get an email when a new story is published. No account needed.
- ProjectBillie’s Place
- SubjectEducation
- CompanyAlides REIM
- Companya154 architecten
- CompanyAlgemene Bouw Maes
- CompanyInnotech
- CompanyExergie