Education

Campus Ledeganck, Ghent | High-performance lifts for a renovated tower

Omdat de liften relatief groot zijn in verhouding tot de afmetingen van de liftschacht, was het een hele opgave om de liftdeuren te installeren.
Omdat de liften relatief groot zijn in verhouding tot de afmetingen van de liftschacht, was het een hele opgave om de liftdeuren te installeren.

An intensive renovation of a tower building goes hand in hand with the renewal of its vertical transport.

Given the very intensive use across twelve floors, the choice of lifts for Campus Ledeganck required careful consideration. Reliability was by far the top priority in the specification. It is no coincidence, then, that TEM Technilift was responsible for supplying and installing these systems.

The lifts serve twelve floors and reach a speed of 1.6 m/s.

As part of ENGIE Solutions, TEM Technilift has the backing of a very strong group. However, the company’s independence from any particular brand remains its greatest asset. “This means we can select the best solution for every project and application,” says director Jean-Paul Vanherck. “Belonging to a large group does not mean, incidentally, that we prefer large installations. We undertake small projects with just as much enthusiasm. What’s more, customers can turn to us for more than just new lifts. Our qualified technicians are familiar with all types of lifts, making us an ideal partner for renovations and modernisations too. Needless to say, we want to take as much of the burden off our customers as possible with an end-to-end approach, including financing if required, so that urgent work does not have to be postponed.”

Open control system

In the tower at Campus Ledeganck, TEM Technilift installed one goods lift and a bank of three passenger lifts, each serving twelve floors and travelling at 1.6 m/s. “By installing machine-room-less models, there was no need to provide space for the motor and control system,” says Jean-Paul Vanherck. “We also chose models with an open control system. This means UGent is not dependent on us for maintenance, call-outs and repairs. Any lift company can carry out this work. It also means that spare parts are often cheaper than those for well-known major brands. Since the lifts are relatively large for the dimensions of the lift shaft, installing the lift doors was quite a challenge. Fortunately, we’re not easily daunted: thanks to our experience and good organisation on site, we completed the task with flying colours.”    

Question about this story? Ask your question

Wie aan Campus Ledeganck werkte

  1. levering en installatieTEM TechniliftIn this story
  2. clientUGentMentioned in Ledeganck 2.0: proof that renovation pays off
  3. architectAbscis ArchitectenMentioned in Ledeganck 2.0: proof that renovation pays off
  4. main contractorVandenbusscheMentioned in Ledeganck 2.0: proof that renovation pays off
  5. main contractorBAM ContractorsMentioned in Ledeganck 2.0: proof that renovation pays off
  6. main contractorDe MulderMentioned in Ledeganck 2.0: proof that renovation pays off
  7. main contractorCegelecMentioned in Ledeganck 2.0: proof that renovation pays off

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectCampus Ledeganck
  • SubjectEducation
  • CompanyTEM Technilift
Share this article

Follow Bouwen aan Vlaanderen

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.