Education

Small school project with significant added value

De aanbouw voert een perfecte dialoog met de bestaande gebouwen.
De aanbouw voert een perfecte dialoog met de bestaande gebouwen.

Scholengroep Prizma wanted to expand its nursery school in Ingelmunster. The architects not only created two additional classrooms, but also gave the entire school building and its surroundings a successful makeover. They transformed the inward-looking building into a welcoming, green space in the centre of the West Flanders municipality.

The building services have deliberately been left exposed.

The architects at Groep III were commissioned to extend the existing school buildings in Ingelmunster with two additional classrooms. As always, the practice explored the building’s context and ways to improve its spatial integration. “We wanted the building to connect with the existing school, but that wasn’t all,” says architect Alexander Verbeke. “We also wanted to improve the appearance of the school as a whole. The original building faced the playground and did not feel particularly welcoming. You could hardly tell it was a school. Our aim was therefore to give it a new lease of life and create a warm reception area, without losing sight of practical considerations.”

To ensure the practical requirements were met, the architects designed two new classrooms with a movable partition. This allows the space to double as a large multi-purpose hall. “We also built a new road from Brigandsstraat, which curves around the building on a sloping plane,” adds architect Dimitri Duysburgh. “The road provides access to a covered double door for external users. Beyond the school gate, there is a playground with a green space and play equipment.” In this way, Groep III succeeded in creating a more open feel in the outdoor space.    

New building services and joinery

Changes were also made to the school buildings themselves. The building services in the existing buildings received a much-needed update. “We installed central heating in every classroom and integrated ventilation and extraction. These services have deliberately been left exposed,” says Alexander Verbeke. “The windows were also replaced, and their colour matches the joinery in the extension.”

The dialogue between the existing and new buildings is also expressed through the pale brickwork. “We incorporated a large window at the end of the building and a corner window. The two windows are linked by folded, toothed steel sheet,” says Dimitri Duysbrugh. “This creates an attractive, dynamic interplay of shadows. Vertical louvres provide solar shading at the windows. All of these elements are in the same colour as the joinery. We deliberately chose a lively, playful shade, because this is still a nursery school.”

A new road with a sloping plane now provides access to the school.

Multi-functional unit

Attention was also paid to the details inside the new structure. A unit made from acoustic panels by Triplaco stands between the two classrooms. “The unit incorporates a sliding partition. This allows us to separate the classrooms and ensure sound insulation. We deliberately kept the ceiling understated, in contrast with all the cheerful colours and materials found in a nursery classroom,” adds Dimitri Duysbrugh. 

The biggest challenge in this project was combining the budget with the site’s constraints. “Because the existing structure had a crawl space, we had to extend it into the new wing. We also wanted to do more than simply put up a new building: we wanted to upgrade the existing classrooms too. The planning was therefore a complex puzzle,” says Alexander Verbeke. “Our practice has extensive experience with school buildings of all sizes. This nursery school is a fine example of how we can deliver significant impact and added value in a small project.”      

A unit made from acoustic panels also serves as a sliding partition.

Question about this story? Ask your question

Who worked on it

Kleuterafdeling Scholengroep Prizma in Ingelmunster

  1. clientScholengroep Prizma
  2. ArchitectArchitecten Groep III
  3. Main contractorAPK Construct

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectKleuterafdeling Scholengroep Prizma
  • SubjectEducation
  • CompanyScholengroep Prizma
  • CompanyArchitecten Groep III
  • CompanyAPK Construct
Share this article

Advertisement

Follow Bouwen aan Vlaanderen

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.