Since autumn 2021, the facilities at the secondary Steinerschool in Ghent have reflected its progressive educational approach. Outdated buildings and temporary classrooms have made way for a new school where experience, spaciousness, tactility and creativity take centre stage. Sustainability runs like a thread through the architectural concept, which was conceived as a ‘large house in the city’. This is why the project uses as few materials as possible, with CLT taking the lead.

The Steinerschool in Ghent occupies a site between Kasteellaan, Eendrachtstraat, Forelstraat and Ferdinand Lousbergkaai. For many years, the kindergarten, primary and secondary departments have all been growing in popularity. Unfortunately, this success has had a downside: the school had been bursting at the seams for some time. “The lack of space was partly addressed by installing temporary classrooms,” says architect-engineer Ignaas Back of Back Architectenbureau. “A warehouse belonging to the former Het Volk printing works was also converted into workshop space. When the school launched a TSO department a few years ago, the situation became untenable. The existing infrastructure no longer met current expectations for thermal and acoustic comfort either. The school group therefore decided to redevelop the site. The first phase involved building a new classroom and workshop complex. A theatre and administration building will be added in the second phase.”



A visual link between practical and theoretical learning
The architects faced a challenging brief. The trapezoidal courtyard, measuring almost 7,000 m², had to be designed in a way that left as much outdoor space as possible. The school also wanted an inspiring learning environment that would express its teaching philosophy in the heart of the city. “That is why we opted for an extremely compact design conceived as a ‘large house’,” says architect Lore Perneel of Perneel-Osten Architecten. “The educational ethos of the Steinerschool, where theoretical and practical subjects go hand in hand, is expressed in two volumes linked by a large pitched roof and a canopy. The canopy serves several purposes: covered outdoor play space, sun shading, a walkway, a circulation route and an outdoor workshop.”

Saving space and materials
“The block on the left contains ten classrooms and the sanitary facilities. On the right, two levels accommodate eight workshops for drawing, painting, bicycle maintenance, woodworking, modelling and crafts,” Lore Perneel continues. “A large covered concrete outdoor staircase sits between the volumes. Together with the walkway on the canopy, it means that circulation takes place outdoors as much as possible, saving us a great deal of space and materials. A herb roof at first-floor level above the workshops adds a touch of greenery, which will also extend across the site. The intention is to redesign the outdoor space with native plants and trees.”
Project partners in focus
Interhoro: plasterboard walls and ceilings
Flexibility is the new watchword in school buildings. The secondary Steinerschool in Ghent has also been designed with this principle in mind. That is why the project features as many plasterboard walls and ceilings as possible. This was right up Interhoro’s street. The family business, based in Lauwe, has specialised in interior finishing since 1968. “Our core business is supplying and installing suspended ceilings, plasterboard walls and ceilings, all kinds of interior doors, and glass walls and doors,” say directors Kelly and Lenz Counye. “We have separate teams for each segment, staffed by people who know their trade inside out. That is unquestionably our biggest strength. Our clients value seeing familiar faces across different projects. We mainly work for large contractors delivering a wide range of buildings. Our work can be found at Garage Vandecasteele in Kortrijk, Bloso Sportschool in Ghent, Meubelen Toff in Dottenijs, various Spar and Aldi branches, the Hotelschool in Ghent … The plasterboard walls and ceilings we installed at the Steinerschool included standard, water-resistant and fire-resistant versions. The ceilings were finished with wood wool and stone wool panels. As this type of finish is becoming increasingly popular, this project is all the more important for Interhoro. We have shown that we keep pace with the latest trends.”
Carefully considered choice of materials
Work to bring the plans to life began in July 2020, with the demolition of the existing buildings and paved outdoor areas. “We began construction proper in mid-August,” says Tim Verhelle, project manager at Alheembouw. “This was our first education project using CLT, or Cross Laminated Timber. The three-storey classroom block was built from this material, as were the roof over the entire school and the large canopy. The workshop block, however, was deliberately built with exposed concrete blocks and hollow-core slabs. The architects chose the ‘structure is the finish’ principle, leaving the building structure as visible as possible. The CLT walls create a warm atmosphere in the classrooms, while the robust, rougher character of the concrete defines the workshops. Combined with accoya external joinery, the result is an interesting, sustainable school that stimulates creativity and is therefore a perfect fit for Steiner education.”
PROJECT DETAILS
Client
Middelbare Steinerschool Vlaanderen (Ghent)
Architect
Perneel-Osten Architecten (Ghent) & Back Architectenbureau (Ghent)
Main contractor(s)
Alheembouw (Oostnieuwkerke)
Question about this story? Ask your question
Who worked on it
Steinerschool in Gent
- ClientMiddelbare Steinerschool Vlaanderen
- ArchitectPerneel-Osten Architecten
- ArchitectBack Architectenbureau
- Main contractorAlheembouw
- gyprocwanden en -plafondsInterhoro
Keep following this
Get an email when a new story is published. No account needed.
- ProjectSteinerschool
- SubjectEducation
- CompanyMiddelbare Steinerschool Vlaanderen
- CompanyPerneel-Osten Architecten
- CompanyBack Architectenbureau
- CompanyAlheembouw
- CompanyInterhoro