General

A stylish blend of past and present

Dankzij de reflecterende vliesgevels van de achterliggende nieuwbouw komt de monumentale gevel van het voormalige college meer dan ooit tot zijn recht.
Dankzij de reflecterende vliesgevels van de achterliggende nieuwbouw komt de monumentale gevel van het voormalige college meer dan ooit tot zijn recht.

Beringen town centre is undergoing a major transformation. An extensive PPP project is breathing new life into the area around the church, with the striking new town hall as its centrepiece.

The distinctive front façade and chapel wing of the former Sint-Jozefscollege have been preserved and integrated into a contemporary design featuring reflective glass architecture, which mirrors its surroundings and minimises the visual impact of the new building behind it. The town hall is not due to open officially until early October, but the building has already been completed. That is reason enough to take a closer look!

“To promote spatial integration and minimise the visual impact, we opted for glass architecture that reflects the surroundings,” says Dirk Evenepoel.

The redevelopment of Beringen town centre had been on the agenda for a long time. An ambitious PPP project was therefore set up to comprehensively redesign the 5-hectare ‘college site’. One of the key priorities was the construction of a new town hall, as the existing building had become too small and no longer met contemporary standards, requirements and needs. The project also includes an underground car park, the renovation and extension of the library, the construction of three new apartment blocks (including one ‘landmark building’ adjoining the Markt, which will stand out thanks to its striking green façades) and the complete landscaping of the surrounding area. The pharmacy that previously stood next to the church is moving to the site of the former town hall, making way for a brasserie with a ‘grand café’. In short, the new town hall is part of a comprehensive redevelopment of the town centre, which will look completely different from next summer.

The canopies attached to the façades vary in size depending on their orientation and are perforated with a specific pattern.
An authentic stairwell with terrazzo floors, faience tiles and wrought-iron handrails keeps the memory of the former school building alive.

Reflective glass architecture

The town council decided to build the new town hall on the site of Sint-Jozefscollege, which was almost entirely demolished, apart from the chapel wing and front façade, both of which are part of a protected village conservation area. These have been thoughtfully connected to a new rear extension. “To promote spatial integration and minimise the visual impact, we opted for reflective glass architecture that mirrors the surroundings,” says Dirk Evenepoel, architect-partner at Jaspers-Eyers Architects, which designed and oversaw the project together with UAU collectiv. “The bronze tint of the aluminium external joinery and the curved fins of the solar-shading canopies complement the colour of the existing brick façades, which were carefully cleaned to preserve their distinctive appearance. We also paid close attention to the sightlines, so that it is mainly from the rear that you can see this is an entirely new building. The result is a stylish blend of past and present.”

“The delicate connection between old and new made this a rather distinctive project”

A delicate connection between old and new

The mirrored curtain walls on the inner side of the new-build section bring the monumental façade of the former college into sharper focus than ever. “We braced the existing façade and then anchored it to a new concrete structure,” says Wim Briels, project director at Willemen Construct, which was responsible for the construction together with Democo. “We demolished the entire building behind it and added an extra floor, erected the new curtain wall and created an opening in the bottom-right corner of the existing façade to accommodate the new entrance. To build the latter, we cast a concrete wall against the existing façade at that point. It is cantilevered via the floor slabs and stairwell behind it, providing the necessary stability. The chapel wing was largely stripped back and fitted with a new roof, new joinery, new floors and so on. However, some elements were retained and merely refreshed, such as an authentic stairwell with terrazzo floors, faience tiles and wrought-iron handrails, which keep the memory of the former school building alive. The curtain walls also required particular attention, as the level of detail was quite high. The delicate connection between old and new made this a rather distinctive project.”  

DIJA: Soft flooring
Soft flooring was chosen for a large part of the new Beringen town hall. DIJA from Neeroeteren was responsible for installing it. “The job involved modulyss First Forward carpet tiles, covering a total area of 3,000 to 4,000 m², finished with timber skirting boards,” explains managing director Peter Jame. “We also installed 90 m² of PVC flooring in the server rooms, using Gerflor’s Saga² system. Contrary to what had been announced beforehand, the cabinets were already in place when we started, so we had to do quite a bit of measuring and cutting to fit the flooring neatly around them. Fortunately, we have plenty of experience, so that was no problem at all. All in all, we worked on site for three to four weeks. It is a great reference, as the finished result really is impressive! Our family business has been operating since 1969, and the third generation is now at the helm. Over the years, we have grown into one of Belgium’s leading players in soft flooring. The new NATO building in Evere is among our projects, so we are certainly no strangers to a challenge!”

The original chapel now serves as the council chamber and wedding venue, complete with its distinctive arched ceiling, which has been thoroughly refurbished.
One of the interior’s standout features is a pointed storage wall with an integrated kitchenette, copy area and storage space.

More than just a glass box

The high level of detail in the curtain walls is due in part to the solar shading, which deserves a special mention. “The canopies attached to the façades vary in size depending on their orientation and are perforated with a specific pattern. This pattern is reminiscent of lacework and creates a beautiful effect, especially after rain, when the remaining droplets glisten in the sunlight. Together with the curved fins, the canopies also ensure that the new-build section is not simply a ‘glass box’. Combined with the triple glazing and the shadow-box infill, the external solar shading also helps create a comfortable indoor climate. It was a complex puzzle to get everything right, as the design of the curtain walls also had to take account of energy performance regulations, thermal comfort and acoustics.”

Sign & Display: Signage and wayfinding
From functional and safety signage (including the preparation of the evacuation plan) and wayfinding to façade signs and banners, as well as illuminated signage at the refurbished library, the brand-new Beringen town hall is a complete project for Sign & Display. “We handled all the signage and wayfinding in and around the building, as well as in the underground car park,” says account manager Ben Saenen. “We worked closely with UAU collectiv and Stad Beringen to ensure everything was aesthetically right. Based on their plans and the chosen typefaces and letter heights, we produced bespoke digital designs, which we optimised to suit the available spaces. Some were implemented as painted graphics, others as stickers. The painted graphics were particularly distinctive, as we even had to apply text up to 3 metres wide in the underground car park. It was a great challenge, and the result is a flawless finish! We carry out many turnkey projects, including in hospitals and residential care centres, where we often also provide the external signage (wayfinding, signposts, totems and so on), so we are very familiar with this type of work. Collaboration with the architect, main contractor and Stad Beringen went very smoothly. This is certainly a project to be proud of!”

IFTech: Sustainable energy system
For IFTech, the construction of Beringen town hall was a true home fixture. “We built the entire energy plant, including the aquifer thermal energy storage wells and the plant room with heat pump, SKIDs, buffer tanks and heat exchangers. We also provided the controls for the dry cooler, which was installed to monitor the thermal balance underground. This ensures the system will continue to perform in the years ahead, allowing the client to enjoy the brand-new town hall in complete comfort,” says Michiel Blocken, Head of Projects at IFTech. “We were involved from the earliest stages and prefabricated the entire installation in our workshop during the first wave of Covid, so we could test everything in advance and minimise the work on site. The site was just 3 kilometres away, so afterwards it was easy to dismantle everything and reassemble it there. This was a highly efficient approach, and together with our focus on standardisation, it enabled us to deliver a perfectly functioning installation in less than a week, with no teething problems. It goes without saying that this is an excellent reference. We have already provided sustainable energy systems for several administrative centres in Limburg, so the town hall in our home town of Beringen is a perfect addition to that list!”

The new way of working

The building includes all the functions expected of a contemporary town hall. The mayor’s office is on the upper floor and opens onto a roof terrace with fine views of the church and the rest of the town centre. The original chapel now serves as the council chamber and wedding venue, complete with its distinctive arched ceiling, which has been thoroughly refurbished. “As the building is on sloping ground, we were able to create another partially above-ground level in the new-build wing, below the ground floor. This includes meeting rooms that open directly onto a public alley and the green, low-traffic inner area. The overall interior design is based on the principles of ‘the new way of working’. One of its standout features is a pointed storage wall with an integrated kitchenette, copy area and storage space, which separates the adjoining office area from the circulation zones.” 

Scepticism gives way to enthusiasm

There was initially some reluctance in certain quarters about the construction of the new town hall, but opinion has now completely turned around. “All the parties involved are very pleased with the result, and the wider public has also responded with considerable enthusiasm,” says Dirk Evenepoel, beaming. “The town hall is certainly something to be proud of,” agrees Wim Briels. “It was, however, a fairly complex project, as we too were affected by the coronavirus crisis and the problems that came with it. What is more, the site was right in the centre of Beringen, where roadworks are constantly under way, so logistical planning was no easy task either. Despite all that, we managed to complete the town hall in just under a year and a half, which is quite an achievement. We are now moving on to the other new developments in the centre, including the ‘markant gebouw’, which is due for completion at the end of September. If all goes well, we will be completely finished by September 2022!”  

PROJECT DETAILS

Client
THV The College (Hasselt)

Architect
Jaspers-Eyers Architects (Brussels, Leuven, Hasselt) & UAU collectiv (Hasselt)

Main contractor(s)
THV Willemen Construct (Mechelen), Democo (Hasselt)

Question about this story? Ask your question

Who worked on it

Stadhuis The College Beringen in Heusden-Zolder

  1. ClientTHV The College (Hasselt)
  2. architectJaspers-Eyers Architects
  3. architectUAU collectiv
  4. Main contractor(s)THV Willemen Construct
  5. Main contractor(s)Democo
  6. Zachte vloerbekledingDIJA
  7. Signalisatie en wayfindingSign & Display
  8. Duurzame energie-installatieIFTech

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectStadhuis The College Beringen
  • SubjectGeneral
  • CompanyTHV The College (Hasselt)
  • CompanyJaspers-Eyers Architects
  • CompanyUAU collectiv
  • CompanyTHV Willemen Construct
  • CompanyDemoco
Share this article

Follow Bouwen aan Vlaanderen

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.