An unconventional office building with a striking appearance

Handelsstraat 31 in Brussels. Goodbye to dense, dark buildings full of asbestos, hello Light On! The brand-new office building, which provides a home for WeWork, the global market leader in high-tech, forward-thinking coworking spaces, takes its name from the abundant natural light. And no doubt also from the stylish zinc cladding on its generously glazed front and rear façades, which really catches the eye.
Insufficient floor-to-ceiling heights, poorly insulated façades, tonnes of asbestos, limited outdoor space …: the building previously occupying this site no longer met modern office standards. Owner Eaglestone therefore decided to demolish it completely, including the foundations, and replace it with a high-performance new building, designed by Art & Build Architect and constructed by Ondernemingen Louis De Waele.

The lack of space on site and the narrow Handelsstraat made the project quite complex.
Similar floor area, more space
“The aim was to create a building with a similar floor area, while also making room for a courtyard garden. We also aligned the building height and floor levels with those of the neighbouring building so that the two could be joined in future, if required. Finally, we created a terrace and a ‘third façade’ above the lower buildings,” explains Patrick Israël, architect and project director at Art & Build. “We also had to create high-quality spaces with as much natural light as possible, while allowing great flexibility in the interior layout.”
“We built a structure with a conventional design on new foundations, comprising two underground and eight above-ground levels,” explains Jonathan Schmit, site manager at Louis De Waele. “It has a beam-and-column structure with a central core made of precast wall panels and concrete walls up to the third floor. The walls on the upper floors, meanwhile, are made of calcium silicate blocks.”

The projecting front façade is clad in perforated zinc.
Daylight and red zinc
All circulation areas, service zones and plant rooms are located in the central section of the building. “This means that all the office spaces benefit from abundant natural light,” explains Patrick Israël. “The façade system is designed to maximise daylight and views, particularly on the Handelsstraat side, which is extremely narrow. The name ‘Light On’ symbolises the project’s primary aim: to create bright, transparent and connected workplaces.”
The curtain walls at the front and rear give the building a distinctive appearance. Jonathan Schmit: “At the rear, the opaque sections of the façade are clad in red Pigmento® zinc cassettes, a relatively new and unprecedented product from VM Zinc, fixed to insulated timber panels.” The choice was driven by the aim of limiting the rise in indoor temperatures during summer. “We also installed zinc sheets from the same brand on the projecting front façade, with perforations that create an evolving pattern.”

WeWork provides high-tech, forward-thinking coworking spaces.
Changes and additional requirements
Because the lack of space on site made it virtually impossible to drill the foundation piles and store construction materials, the building was constructed on a ‘just-in-time’ basis. At WeWork’s request, many last-minute changes were also made. “The shell was already up to the second floor when we heard about the new requirements,” recalls Jonathan Schmit. “We had to double the number of ventilation units and, consequently, all the grilles and ducts. We also had to increase the heat pump’s capacity and enlarge all the stairwell doors to ensure safe escape routes.”
BIM, lean planning and collaboration
The shell had to be fully complete before the fit-out could begin. The fit-out, tailored to tenant WeWork, started in August 2019 and the building was handed over on 19 December 2019. This was an impressive achievement, given that the total floor area exceeds 6,000 m², and was made possible by lean planning, the use of the BIM methodology and excellent collaboration between all the parties involved. Patrick Israël: “The project was completely ‘rethought’ during the construction phase, resulting in extremely tight deadlines. Even so, we brought this challenging project to a successful conclusion and achieved all the targets set.”
Question about this story? Ask your question
Who worked on it
Light On in Brussel
- ownerEaglestone
- architectArt & Build Architect
- Pigmento®-zink-cassettesVM Zinc
Keep following this
Get an email when a new story is published. No account needed.
- ProjectLight On
- SubjectGeneral
- CompanyEaglestone
- CompanyArt & Build Architect
- CompanyVM Zinc