Brand-new chemical storage terminal built from 1,112 tonnes of steel

After Houston in the United States, the Port of Antwerp is the world’s second-largest ‘chemical hotspot’.
It is hardly surprising, then, that Dutch tank storage company STANDIC commissioned a new storage terminal at the Fifth Harbour Dock. Covering an area of 95,000 m², the highly automated complex contains tanks ranging from 500 to 3,500 m³ and was built by ASK Romein using 1,112 tonnes of steel. Excellent cooperation and a positive, constructive atmosphere on site resulted in a sustainable success story.

With a storage capacity of 230,500 m³ and 163 tanks in almost every type and size, STANDIC was already the leading name in the Netherlands for storing chemicals, biofuels and raw materials for lubricants. But with the completion of its new terminal in the Port of Antwerp, which offers a total storage volume of 230,000 m³, the company has doubled its capacity at a stroke. The reason behind this ambitious multimillion-euro investment? Multimodal accessibility and sustainable distribution. Transport by water, both inland and seagoing, and by rail is the ideal way to supply niche chemical markets quickly, efficiently and in an environmentally friendly manner. “The Port of Antwerp is one of the world’s largest maritime chemical clusters. That is why we opted to expand in the city on the Scheldt. We hope this will allow us to further develop STANDIC’s specialised storage activities and serve customers from all corners of the world,” explains Ronald Ooms, director of parent company Hametha.

Major flagship project
STANDIC’s Antwerp terminal was completed by ASK Romein in just under a year. STANDIC project manager Raoul Cootjans had fond memories of an earlier collaboration with ASK Romein, so the Dutch tank storage company once again turned to the renowned industrial contractor from Malle. “We also found it a very positive collaboration at the time, so we were delighted that STANDIC wanted to entrust us with this major flagship project,” says Jack van Iersel, project manager at ASK Romein. “We supplied and installed the steelwork for eight tank farms, including the walkways, handrails, plastic grating and stairs. We also built an 18 x 30-metre hall housing all the associated equipment and controls. No less than 1,112 tonnes of steel were needed to build this highly automated, state-of-the-art terminal.”
“As some tanks had to be commissioned earlier than others, we built the terminal in what you might call a criss-cross fashion”
A complex puzzle
Most new-build projects follow a logical sequence of work. That was not the case here, Jack van Iersel emphasises. “As some tanks had to be commissioned earlier than others, we built the terminal in what you might call a criss-cross fashion. We also started erecting the steel structure alongside the excavation while the concrete foundations were being poured, which enabled us to significantly shorten the lead time. This was despite having only a few metres of space between the quay and the foundations, some of which also had to remain accessible to construction traffic. We then lifted the pipe racks, including the stainless steel pipes that we also installed, into position in one operation using two cranes, and assembled them. We regularly met with the other contractors and subcontractors involved to work out the complex construction and logistics puzzle. The positive, constructive atmosphere on site meant we succeeded brilliantly! Everyone was motivated to give it their all. Both STANDIC and we are extremely pleased with the end result!”
Client
Hametha (Oosterhout, the Netherlands)
Main contractor(s)
ASK Romein (Malle)
Question about this story? Ask your question
Keep following this
Get an email when a new story is published. No account needed.