Cutting the construction budget

Cutting the construction budget

When building a house, you set a construction budget. The cost is usually calculated per m2 or m3, plus the finishing work, kitchen and bathroom. There are plenty of ways to save on the build. Here are a few tips:

  1. Do some of the work yourself instead of outsourcing it. There may be finishing jobs you can tackle yourself, such as plastering, painting or laying a floor. It depends on how handy you are and how much time you want to spend on the house yourself. There are TV programmes about DIYers who have been working on their homes for years but have made little progress. Make sure you work safely, using mobile scaffold towers with approved scaffolding components. Cutting corners on safety is the wrong strategy.
  2. Construction costs are largely calculated per m2 or m3. Review the plans critically and ask yourself whether certain rooms could be smaller. A standard construction price is €1.225 per m2 or €350 per m3. Reducing the size of rooms or rearranging the layout could easily save 20m2, worth €24.500. Keep minimum dimensions in mind, but even in a 150m2 home there may be scope to cut back. Another option is to defer certain rooms until later, for example an extension.
  3. The kitchen and bathroom are the most expensive areas of the home. Tiling, sanitaryware and pipework make these rooms costly to finish. A kitchen can cost € 40.000, but there are of course cheaper options. Kitchens from kitchen outlets or DIY stores can be heavily discounted. The same applies to the necessary appliances. It is much the same with sanitaryware. If you are lucky enough to find these items at a bankruptcy auction, you can buy them at a low price.
  4. The building services in the home include heating and possibly air conditioning. Consider not only the purchase price but also energy efficiency. The purchase is a one-off cost, but energy bills come round every month. Think about the near future too. Does it make sense to install a gas-fired central heating system now if it may need to be replaced with a heat pump in ten years? Plan ahead by choosing underfloor heating instead of radiator heating.
  5. If the property has its own garden, you can postpone the landscaping work. Do have the ground levelled and lay the paving. There is nothing worse than walking into your new home with muddy shoes.

A house lasts around 70 years or more. Some elements, such as kitchens and bathrooms, are replaced or renovated much sooner. Other things cannot easily be changed later, such as the quality of the bricks and roof covering. So make smart choices when setting your construction budget.

Question about this story? Ask your question

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • SubjectGeneral
Share this article

Advertisement

Follow Bouwen aan Vlaanderen

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.