For 30 years, Finnish designers have been creating slim, free-form floor structures using the DELTABEAM® composite steel-concrete beam. Peikko’s concept arrived in the Benelux more than ten years ago, where it is regularly used for ‘spacious’ and sustainable projects. DELTABEAM SELECT has recently become available, a free software programme for structural engineers that makes designing with the composite steel-concrete beam even easier.

“The DELTABEAM® composite steel-concrete beam enables structural engineers to design an attractive, slim, free-form floor structure,” begins Wim Zwaan, Managing Director of Peikko Benelux. “Combined with hollow-core floor slabs, it also allows for long floor spans. Spans of 7 to 8 metres are usual, depending on the type of beam, but it is also perfectly possible to engineer spans of up to 10 metres without the beam projecting below the floor. These longer spans not only add architectural value, they also significantly reduce the building height thanks to the slim structure. Services can also be fitted neatly beneath the floor, leaving less space taken up by suspended ceilings.”

The number of columns is minimised, resulting in a distinctive, spacious design with many benefits for the building’s layout.

A unique product

At its core, the DELTABEAM® is a steel beam on which a hollow-core or lattice girder floor slab is placed during construction. “Once the concrete has been poured and cured, the DELTABEAM® benefits from the advantages of a composite steel-concrete beam,” says Zwaan. “The DELTABEAM® is stiffer than a conventional steel beam and can accommodate longer spans and higher loads. The number of columns is minimised, resulting in a distinctive, spacious design with many benefits for the building’s layout.” The DELTABEAM® also stands out as a unique product in terms of fire safety, benefiting from the combination of steel and concrete. “Additional fire reinforcement is already incorporated into the beam during production. In the event of a fire, the concrete then provides cooling, while the fire reinforcement enables the structure to withstand sufficient tensile stresses. The DELTABEAM® is guaranteed to provide up to three hours of fire resistance in a fully developed fire, without the need to apply
additional fire-protection coating.”

DELTABEAM SELECT

Structural engineers wishing to explore the capabilities of DELTABEAM® can now use DELTABEAM SELECT on the Peikko Benelux website. “This module is part of the Peikko Designer software programme, which allows structural engineers to carry out an initial design exercise using DELTABEAM®,” Zwaan explains. “Based on a number of parameters, such as the required span, floor type and floor loads, the programme produces three proposals for the most efficient possible load-bearing structure using DELTABEAM®. The structure is shown in full 3D, and the software is exceptionally user-friendly. Reports and drawings can then be exported and incorporated into the design. The contractor can use these to request a quotation from Peikko. Once the order has been placed, we carry out a detailed calculation of the structure and provide comprehensive calculation reports for the structural engineer to check.”

Loods 5

One of the high-profile projects in which DELTABEAM® plays a major role is the new Loods 5 furniture and accessories superstore in Amersfoort and Maastricht. “Thanks to Peikko’s composite steel-concrete beams and the minimum number of columns, the interior can be laid out flexibly. The parking area on the ground floor beneath the building is also spacious. As the beams there are exposed to the outdoor environment, they have been protected with a zinc-aluminium metallised coating. This is a proven approach in bridge construction and the offshore industry, and is preferred to hot-dip galvanising for DELTABEAM®.” Loods 5 is so pleased with the spatial qualities of the composite steel-concrete beam that its new premises in Duiven (near Arnhem), completed at the end of 2019, were also built using this system.    

Question about this story? Ask your question

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • SubjectGeneral
Share this article

Advertisement

Follow Bouwen aan Vlaanderen

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.