Fresh educational architecture for young people in North Limburg

In the run-up to this school year, the WICO school group in Pelt carried out a major reorganisation.
With the construction of an attractive new building, it transformed the Sint-Hubertuscollege site into a Juniorcampus for the first year of secondary education. Its clean, contemporary design gives the building an identity of its own, while incorporating a few playful architectural nods to the existing educational facilities. The project is also an outstanding example of BIM in practice.

The Sint-Hubertuscollege in Neerpelt was founded in 1910 and has a long history. Since 2009, the front section of the building, including its neo-Gothic chapel with monumental stained-glass windows, has been a protected monument. At the rear, several extensions made way for a brand-new bar-shaped building, which nestles between the existing college and the sports hall. From now on, young people from across North Limburg will take their first steps into secondary education here. To create a harmonious transition between old and new, the historic building will also soon be enhanced with a green playground.

Fresh, clear and legible
The new building at the newly established Juniorcampus measures 6,000 square metres and has four storeys. It accommodates twelve spacious technology classrooms, thirteen classrooms, two teaching kitchens, three laboratories, a staff room and a ZLW room. The design is by Q-BUS Architectenbureau, which drew up an overarching masterplan to integrate the expansion optimally into the site. “Positioning the new building at right angles between the existing college and the sports hall gives the historic building greater prominence, creates a well-enclosed new playground and makes circulation around the campus much smoother, as pupils, teachers and sports hall users each have separate entrances. All of this improves the site's liveability and quality,” the architects say. “As the school is intended for more than seven hundred young pupils, it was important to create a fresh, clear and legible whole that they could identify with straight away. We opted for a compact building with two basic volumes: a three-storey bar-shaped block and two single-storey extensions, including the dining hall. The ground floor connects to a covered playground and houses all the public functions. Its design is open, thanks in part to curtain walls and the inclusion of a monumental stairwell with large rooflights, unlike the more enclosed upper floors, which engage less with their surroundings. The combination of light brick slips, subtle colour accents and slender black window frames creates a clean yet playful façade.”


A considered play of colour
“Structurally, the building consists of a precast concrete frame, comprising walls, columns, beams, stairs, predalles, hollow-core slabs and more, complemented by several masonry walls,” says Kathleine Housmans of main contractor Willemen Construct. “Most of the internal layout was created using non-load-bearing plasterboard partitions, offering greater flexibility for future alterations. The technology classrooms have polished concrete floors, while rubber flooring has been installed throughout the rest of the building. The façade is clad with a combination of beige-grey brick slips and grey and orange fibre-cement panels. Above the covered playground, the bar-shaped volume rests on columns, with an orange polished concrete floor and matching partition walls. The orange elements visually tie in with the look and feel of the historic building, while the grey tones refer to the sports hall. The aluminium windows and doors and their associated aluminium panels are finished in black, creating a pleasing contrast with the façade cladding. The roofs of the single-storey extensions have been finished with a green roof and a terrace adjoining the staff room. Solar panels have been installed on the roof of the bar-shaped volume.”

The added value of BIM
Q-BUS Architectenbureau, Willemen Construct and many other parties involved in the Juniorcampus project, including engineering consultancies, specialist contractors and subcontractors for precast concrete, made extensive use of the BIM methodology. “Everything was brought together in a single collective 3D model, which kept the turnaround time very short. It was an intensive process, but the collaboration went smoothly. We have used BIM on all our projects since 2016 and found that it also optimised the construction process here. Last but not least, the final account came in below the original cost estimate,” the architects emphasise. Willemen Construct also found the smooth BIM collaboration a great success: “It made our work easier: we only had to derive the exact quantities from the BIM model, and it allowed us to carry out extensive clash detection, so we could resolve all the issues before they arose on site,” says Kathleine Housmans, who also handled BIM coordination. “Because everyone worked together transparently and with trust, design changes caused no confusion and the works progressed very smoothly. The Juniorcampus in Pelt was an exemplary BIM project, to the extent that the site and project manager would now like to approach all construction projects this way!”
R&M Van Den Boer: Aluminium external joinery
The vertical window bands and extensively glazed ground floor give the WICO Juniorcampus in Pelt a fresh, attractive and contemporary appearance. R&M Van Den Boer (Lommel) was responsible for installing the aluminium external joinery and impressed with the meticulous quality of its work. “We installed Reynaers Aluminium CW 50 curtain walls and Masterline 8 HI windows,” explains managing director Ronny Van Den Boer. “The profiles are fitted with 1.0 high-performance glazing. We installed the windows and curtain wall elements during the shell construction phase, after which the façade finish, comprising insulation strips and brick slips, was fitted against them. We also sealed the outside of the windows with airtight and watertight tape. It was a fairly substantial job, but certainly manageable. We specialise in large projects. The coronavirus crisis also had little to no negative impact. Main contractor Willemen Construct was very satisfied with our work, so we can certainly call it a highly successful project!”
PROJECT DETAILS
Client WICO vzw (Pelt)
Architect Q-BUS Architectenbureau (Lummen)
Main contractor(s) Willemen Construct (Mechelen)
Question about this story? Ask your question
Who worked on it
WICO Juniorcampus in Pelt, nieuwbouw
- clientWICO vzw
- architectQ-BUS Architectenbureau
- main contractorWillemen Construct
- aluminium buitenschrijnwerkR&M Van Den Boer
Keep following this
Get an email when a new story is published. No account needed.
- ProjectWICO Juniorcampus
- SubjectGeneral
- CompanyWICO vzw
- CompanyQ-BUS Architectenbureau
- CompanyWillemen Construct
- CompanyR&M Van Den Boer
- CompanyReynaers Aluminium