General

Ghent, AGP Group | Domo factory transformed into a brand-new production facility

Ghent, AGP Group | Domo factory transformed into a brand-new production facility

Peruvian automotive glass manufacturer AGP Group sees Flanders as the ideal base for serving the European market. The result? The company invested in a brand-new factory in Ghent, where at least 200 people will be employed. Delivering this state-of-the-art production facility required considerable expertise and creativity …

Gent AGP Group

The refurbishment included installing numerous machine foundations and constructing new basements.

AGP is focused on developing lighter glazing for electric vehicles. The manufacturer is also renowned worldwide for its panoramic roofs, which provide better protection from the sun’s rays and can switch at the touch of a button from transparent to fully opaque. The company also supplies the windscreens for Tesla’s Model X and produces bullet-resistant glass for military vehicles, police cars and naval vessels. With the acquisition of West Flanders-based family business Soliver, AGP completed its range with side windows for premium vehicles.

Gent   AGP Group

AGP wants to further expand into the European market, and has therefore established a new facility in Ghent specialising in the production of panoramic roofs.

Completely refurbished inside

AGP wants to further expand into the European market, and has therefore built a new facility in Ghent specialising in the production of panoramic roofs. The factory was built on the former Domo site in Zwijnaarde, where 18,000 m² of existing buildings were upgraded. “The steel structure was reinforced wherever necessary,” explains Vincent De Wulf, project manager at Alheembouw, which acted as main contractor. “On the outside, we only insulated the cladding façade and fitted it with windows. The major transformation took place inside. Kilometres of underground services were installed, numerous machine foundations were put in place and new basements were built. A new concrete floor was laid throughout the building, finished with white epoxy. In addition, 5,000 m² of walls were clad with plasterboard, painted and finished with grilles from Duco. Suspended ceilings were installed throughout, and all the fire doors and other doors, as well as the gates, were replaced. At the front of the warehouse, a two-storey office complex was fitted out, with each floor measuring 500 m². From outside the factory, you would barely notice the offices, but no expense was spared inside to create a prestigious setting. For example, the climate control runs through the suspended ceiling, and most of the walls are clad in colour-changing glass.”

Gent AGP Group

Kilometres of underground services were installed.

Design & Build project

From a technical point of view, this was not a particularly difficult project for Alheembouw. With almost fifty years of experience in the private, industrial and public sectors, this contractor knows better than anyone how to turn architects’ ideas into reality. “We combine this with meeting our commitments on deadlines and budgets,” continues Vincent De Wulf. “We find that all our partners greatly appreciate this approach, which regularly leads to new contracts. AGP, too, came about as a result of a previous successful collaboration with Delafontaine. Together with the client, this architectural firm was looking for a reliable partner for a Design & Build project. Although the job was relatively straightforward from a technical point of view, we faced other challenges that called for considerable creativity from our team. For example, the client was extremely vague in describing what they wanted. We received much of the information only during the construction phase, which of course does not fit with a Design & Build approach. On top of that, it was a real race against time to get everything ready on schedule, despite the high standard of finish required.”    

Gent AGP Group

A new concrete floor was laid throughout the building, finished with white epoxy.

Question about this story? Ask your question

Who worked on it

Productiefaciliteit AGP Group in Gent

  1. clientAGP Group
  2. algemene aannemerAlheembouw
  3. architectural practiceDelafontaine

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectProductiefaciliteit AGP Group
  • SubjectGeneral
  • CompanyAGP Group
  • CompanyAlheembouw
  • CompanyDelafontaine
Share this article

Follow Bouwen aan Vlaanderen

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.