On Oude Baan in Mechelen-Noord, an outdated industrial building has made way for a contemporary, semi-industrial development.

Old Road Business Park is perfectly tailored to the needs of the SME market in the Mechelen region. It provides not only office space, but also extensive workshop and warehouse facilities. Notably, the brand-new building has considerably more to offer architecturally than comparable developments.

Words Tim Janssens    |    Photography Aikon Producties

Old Road Business Park is a development by Resolve, which has made the most of the site’s strategic location. Investment has gone into a stylish and functional business
complex. “Initially, the plan was to provide thirteen units, but in the end we settled on three. This was because the largest occupier needed a substantial amount of floor space. Several units were therefore combined, leaving one large unit and two smaller ones,” says Joeri Windmolders, project architect at Tecro & Krea.

Het Old Road Business Park is geen klassieke kmo-industriebouw, maar een complex met een herkenbare en verantwoorde architecturale identiteit.

Old Road Business Park is not a conventional SME industrial building, but a complex with a distinctive and considered architectural identity.

Architectural dynamism

Resolve sets the bar high and always aims to create buildings with real presence. Old Road Business Park is therefore not a conventional SME industrial building subscribing to the ‘less is more’ principle, but a complex with a distinctive and considered architectural identity. “For instance, we have provided two generously glazed end volumes, each with an extra storey, three instead of two, and partially supported on sloping concrete columns,” explains Joeri Windmolders. “We also designed a chequerboard pattern to bring greater dynamism to the façades of the workshop and warehouse section. This combines painted concrete panels, specially developed black polycarbonate panels and sectional doors. By varying the thickness of the different planes in the external envelope, we were able to create a lively façade.”  

De gevels van het Old Road Business Park stralen een bijzondere dynamiek uit.

The façades of Old Road Business Park have a distinctive dynamism.

Planning for different scenarios

Old Road Business Park brings together three businesses, while presenting a single unified exterior. “That was a deliberate choice, as the building is intended for the rental market,” says Jan Celis, senior project manager at main contractor Verelst. “This had significant implications for the construction process, as flexibility was essential. We needed to be able to offer flexibility in the fit-out, so coordinating the installation of utility services and building services while also meeting fire-safety requirements was quite a challenge, all within the tight deadlines set. We had to plan for several possible scenarios, which required a great deal of thought. The coronavirus crisis had little impact on the schedule. Most materials had already been delivered and the external works had just been completed when the lockdown was announced. Thanks to good coordination, Verelst managed to maintain the required social distance and comply with the other coronavirus measures during the interior fit-out. Landscaping and the creation of the green buffer are still to come, but the building is already looking the part!    

Project partners speak

Dakconstruct: PVC roofing

Both the workshop and warehouse section (2,700 m²) and the offices and terraces (800 m²) at Old Road Business Park in Mechelen have been fitted with high-quality PVC roofing. This was right up Dakconstruct’s (Herentals) street. “The roofing on the industrial units is mechanically fixed to the steel decking, as is common in industrial construction, while on the offices it is fixed to the concrete structure,” says project manager Jochen Fonteyn. “The latter is more labour-intensive because pilot holes have to be drilled by hand. The roofing is fixed in accordance with a wind load calculation, which determines the sheet widths and number of fasteners. This means that, so to speak, the insulation and roofing can withstand a hurricane. PVC roofing is certainly advantageous for large industrial construction projects, particularly given the increasingly tight schedules and deadlines. Plastic roofing performs very well in terms of durability, quality and speed of installation. Another advantage is that it is a single-ply membrane, with the sheets heat-welded together, allowing for a neat finish and minimising the risk of leaks. Should leaks ever occur, for example as a result of storm damage, they can be located and repaired quickly. These are strengths that are clearly evident at Old Road Business Park too. As always, our collaboration with main contractor Verelst went smoothly. These are exactly the kind of projects we enjoy working on.”

TECHNICAL DETAILS

Client Resolve (Antwerpen)
Architect Tecro & Krea (Mechelen, Gent)
Main contractor(s) Groep Verelst (Putte)

Question about this story? Ask your question

Who worked on it

Old Road Business Park in Mechelen

  1. ClientResolve
  2. ArchitectTecro & Krea
  3. Main contractorVerelst
  4. pvc-dakbedekkingDakconstruct

Keep following this

Get an email when a new story is published. No account needed.

What you follow
  • ProjectOld Road Business Park
  • SubjectGeneral
  • CompanyResolve
  • CompanyTecro & Krea
  • CompanyVerelst
  • CompanyDakconstruct
Share this article

Follow Bouwen aan Vlaanderen

Follow

Follow a project or company and you’ll receive an email whenever a new story appears. Follow a theme or topic and you’ll receive a weekly roundup. No account or password needed: every email includes a link to what you follow.