Internal mobility with sustainable credentials
Text and images Els Jonckheere

Sports enthusiasts in the municipality of Gavere have reason to celebrate. The brand-new Scaldis sports hall is expected to open in February, as part of the masterplan to redevelop the Sportdreef site. The building has three levels, all of which need to be easily accessible to everyone. That is why the client entrusted internal mobility in the building to Schindler, the lift manufacturer whose performance exceeds statutory requirements in many respects.

The new sports hall was awarded to LCV Real Estate through a Design & Build procedure. The brief covers the construction of a large sports hall with spectator seating, a multi-purpose hall, a dance and martial arts room on the upper floor, and a ground-floor catering area. It also includes office, changing and sanitary facilities, linked to the various halls by a logical layout. Its understated, semi-industrial architecture gives it a timeless character and allows it to blend seamlessly into the surrounding countryside, with the Scheldt close by. The compact stacking of the volumes minimised the building’s footprint, while carefully selected technical systems ensure that the sports complex can operate efficiently.

Exceeding the standard
In this context, internal mobility also had to be provided in an exceptionally energy-efficient (and, of course, reliable) way. The Schindler 3000 meets the specified requirements perfectly. This latest-generation lift can also serve as a stretcher lift, thanks to its ISO dimensions of 1,100 x 2,100 mm, a useful feature in a sports complex. Scaldis has three stops. “The Schindler 3000 can carry up to 1,000 kg of passengers and has two entrances at ground-floor level,” says Wim Stockx, sales, marketing and product manager. “The doors measure 900 x 2,100 mm, have door surrounds and are finished in Window Grey RAL7040. They are certified to EN81-58 E120, meaning Schindler significantly exceeds the standard, which requires only E30. The same applies to the door safety features. Normally, only the bottom door is fitted with a ‘landing egress device’, which enables technicians to open the door from inside. At Scaldis sports hall, however, we fitted every door with this mechanism, as is required for a fire-fighting lift, even though it was not a requirement for this application.”

Clean, modern finish
The Schindler 3000 range offers three levels of finish. “The client opted for a clean, modern design, with LED ceiling lighting (LINE type), a car finished in laminate (Cadiz Blue) and dark grey, smooth, speckled rubber flooring,” says Wim Stockx. “As the lift has two entrances and also had to comply with EN81-70, a mirror on the rear wall would normally have been mandatory. Since the second door is at the rear, it was replaced with a ‘reversing’ mirror: a small, round mirror in the upper left or right corner that allows passengers with reduced mobility to look behind them when leaving the lift car.”

Outstanding energy efficiency
The lift was also installed in accordance with EN81-73. Surface-mounted, design-led floor indicators were fitted on every level. Wim Schindler says: “The Schindler 3000 is also exceptionally energy-efficient, thanks to its low-consumption drive. Its energy optimisation kit, combined with feeding power back into the building’s electricity grid, achieves a Class A rating under both the VDI and ISO standards, despite the expected frequent use. The lift’s ‘estimated’ annual energy consumption is comparable to that of a large domestic fridge! Schindler also goes a step further than most competitors at handover. The lift installation is first assessed by an internal ‘SAIS’ team to check that everything meets our design and quality requirements. Only then is the final safety inspection carried out.”
Question about this story? Ask your question
Keep following this
Get an email when a new story is published. No account needed.