Maximum daylight on a confined site with blank façades

Thirteen private apartments on the waterfront, and 41 smaller studios and apartments for a social housing agency on the other side. These are the two main components of Manugenie, a new residential complex in Zeebrugge. Design & Build and BIM were the secret weapons.

For a plot in Zeebrugge, architect Omer Vermandele of Architecten Groep III set to work at the drawing board with the aim of maximising returns for the client. Following discussions with the social housing agency, a mix of private and social housing units was agreed. A total of 54 apartments were built in a white block with dark joinery and green terraces. “The characteristics of the plot determined the positioning and layout of the building block,” explains Omer Vermandele. “We placed the private apartments along Werfkaai, overlooking the harbour. They enjoy attractive views and maximum interaction with their surroundings. The outlook is less appealing along Kielbankstraat, so we placed the smaller studios and apartments for the social housing agency there. All the circulation is also located at the rear, with an open passageway that creates a sense of space.”

Traditional building with a modern look
The site was quite narrow, and the building had two blank façades. Extensive glazing draws in as much natural light as possible and contributes to the building’s contemporary look. Another unforeseen factor also played a major role. “At the start of the design phase, we were told that a 8-metre storm surge barrier wall would eventually be built in front of the entire side façade on Kielbankstraat. To ensure a quality outlook in that scenario, we raised the whole building by 1.5 metres. This also required measures to ensure accessibility,” says the architect. In the end, the storm surge barrier was not built, so Architecten Groep III looked for an alternative way to make practical and efficient use of the raised building. The underground car park for fifty cars is now less deep, allowing it to be naturally ventilated. In addition, residents of the penthouses on the third floor and above enjoy even better views of the front and rear harbours.

Efficient construction process with BIM
As a contractor, Vandenbussche is familiar with Engineering & Build. The company often works with BIM, and is happy to do so. The Building Information Model was used extensively as a working tool throughout the construction process, not only by Vandenbussche itself but also by subcontractors and suppliers of, among other things, steel sections and calcium silicate blocks. This enabled the team to anticipate potential design clashes and ensure optimal execution. Vandenbussche project manager Frederik De Prest kept the site running smoothly. “This was a fairly traditional building, with pile foundations, a concrete basement and load-bearing calcium silicate walls. Working with BIM did allow us to quickly incorporate additional requested changes into the design and avoid delays and errors. It also gave us the scope to consider technical details in depth and optimise everything. I would also like to mention that all the apartments, including the social housing units, have individual heat pumps. That is a major benefit for residents at a time like this.”

Question about this story? Ask your question
Who worked on it
Manugenie in Brugge
- clientPatronale Real Estate NV
- architectArchitecten Groep III
- main contractorVandenbussche
Keep following this
Get an email when a new story is published. No account needed.
- ProjectManugenie
- SubjectGeneral
- CompanyPatronale Real Estate NV
- CompanyArchitecten Groep III
- CompanyVandenbussche
- CompanyVermandele